Loading...
HomeMy WebLinkAboutLetter to City of North Bay VillageV-t" if Kitt PEDRO G. HERNANDEZ P.E. COY Mainer March 11, 2009 Mr. Benny Luedike Submerged Lands & Environmental Resources Program Florida Department of Environmental Protection Southeast District Office 400 North Congress Avenue, Suite 200 West Palm Beach, Florida 33401-2913 Re: North Bay Village— City of (Force Main HDD) File No.13-0173101-003 Riparian Piupei ty, Letter ofNo Objection Dear Mr: Luedike: This letter is to confirm that the City ofNarth Bay Village has met with the City of Miami to discuss the City's proposed force main rehabilitation design build project as it relates to City of Miami Public Right -of -Way. The City of Miami understands the critical need for this North Bay Village project and the basis of design to utilise N.E. 806 Street. The City of Miami has no objection to North Bay Village implementing this design build ,project based on the Design Criteria Package (DCP) including the following requirements as discussed with North Bay Village: • All local, state, and federal permits not obtained as part of the DCP must be obtained by the Design Build (DB) team • The DB team will be required to coordinate with the City of Miami and associated Home Owners Association as needed thmughoutthe DB process. • The .proposed force main must be built in compliance -with Milani -Dade Water and Sewer Department (WASD) standards for ultimate dedication of the utility to WASD outside of the North Bay Village City limits. • Both travel lanes of N.E. 80th Street will be resurfaced once the proposed force main construction work is complete. • City of Miami public Right -of -Way that is impacted by construction will be •returned to equal or better condition at no cost to the City of Miami. Based on the above criteria, the City of Miarhi is in agreement with North Bay Village proceeding with their proposed force main rehabilitation design build project. • DEPARTMENT OF PUBUC WORKS 444 S.W. 2nd Avenue /M10ma Fbrtda 33130 /0(25) 4161203/ Fax C305) 416-1278 Maf U A6ifims P.O. Box 130708 Wanl, FL 33233-0701 Mr. Benny Luedike, Mazeb 24, 2029, Page 2 If you should have any questions or need additional information, please feel fret to contact me or Public Works Director Stephanie GrindeU at 305-250-5400. Pedro a • r,.� Pam. City Manager C: Bill Anido, Assistant City Manager Stephanie N. GrindeU, Director, Public Works Department Francis Mitchell, Assistant Director, Public Works Department - Leonard J. Helmers, Professional Engineer IV, Public Works Deportment Matthew Schwartz Robert Pushkin Gary Ratay