Loading...
HomeMy WebLinkAboutAddendum No. 2CITY OF MIAMI ADDENDUM NO. 2 December 7, 2009 CONSTRUCTION ENGINEERING AND OBSERVATION SERVICES FOR NE 2ND AVENUE IMPROVEMENT PROJECTS (SECTION B1 AND C) AND CITYWIDE ADA SIDEWALK IMPROVEMENTS RFQ No. 08-09-049 TO: ALL. PROSPECTIVE PROPOSERS: The following changes, additions, clarifications, and deletions amend the above -captioned Request for Qualifications, and shall become an Integral part of the Proposal Responses and the subsequent Agreement. Please note the contents herein and affix same to the documents you have on hand. Request for Information Question 1 The submittal requirements requested forms and references for the Project Manager/AdminIstrator; forms "RFQ-PM-R Project Manager's Reference Forms and RFQ-PM — Qualification of Project Manger / Administrator". Addendum 1 Issued on 12/2/09 revised the positions titles and descriptions. Is the role of the Project Manager/Administrator no longer required? If so, ere the RFQ-PM and RFQ-PM-R forms required? Answer 1 Please use Forma RFQ-PM and RFQ-PM-R for the Project Engineer/Administrator. Question 2 Section 2.2 (Scope of Services) refers to materials testing, Is lab testing required under this scope or just field tests? If lab tests are required, Is the prime consultant to also handle the materials testing conducted at the laboratory since no Sub -Consultants are allowed? Answer 2 Lab tests are not required; Section 2.2 refers to field testing. THIS ADDENDUM IS AN ESSENTIAL PORTION OF THE RE AND SHALL BE MADE A PART THEREOF. FOR QUALIFICATIONS (RFQ) Gmy nt, Assistant Director Cap I I • rovements Program This Addendum should be signed and dated by the Proposer and submitted as proof of receipt with the submission of Proposals. The Proposer by Identifying the addendum number in their Proposal and by signing and submission of their Proposal shall serve es proof of receipt of this Addendum. NAME OF FIRM: Metric Engineering, Inc. SIGNATURE: 1DAT5: Decemba 15, 2009 City or Mionn A(rdurlrJum No 2 RFC. 08 liN Q40