The following changes, additions, clarifications, and deletions amend the above -captioned Request for
Qualifications, and shall become an Integral part of the Proposal Responses and the subsequent
Agreement. Please note the contents herein and affix same to the documents you have on hand.
Request for Information
Question
1
The submittal requirements requested forms and references for the Project
Manager/AdminIstrator; forms "RFQ-PM-R Project Manager's Reference
Forms and RFQ-PM — Qualification of Project Manger / Administrator".
Addendum 1 Issued on 12/2/09 revised the positions titles and descriptions.
Is the role of the Project Manager/Administrator no longer required? If so,
ere the RFQ-PM and RFQ-PM-R forms required?
Answer
1
Please use Forma RFQ-PM and RFQ-PM-R for the Project
Engineer/Administrator.
Question
2
Section 2.2 (Scope of Services) refers to materials testing, Is lab testing
required under this scope or just field tests? If lab tests are required, Is the
prime consultant to also handle the materials testing conducted at the
laboratory since no Sub -Consultants are allowed?
Answer
2
Lab tests are not required; Section 2.2 refers to field testing.
THIS ADDENDUM IS AN ESSENTIAL PORTION OF THE RE
AND SHALL BE MADE A PART THEREOF.
FOR QUALIFICATIONS (RFQ)
Gmy nt, Assistant Director
Cap I I • rovements Program
This Addendum should be signed and dated by the Proposer and submitted as proof of receipt with the
submission of Proposals. The Proposer by Identifying the addendum number in their Proposal and by
signing and submission of their Proposal shall serve es proof of receipt of this Addendum.
NAME OF FIRM: Metric Engineering, Inc.
SIGNATURE:
1DAT5: Decemba 15, 2009