Loading...
HomeMy WebLinkAboutExhibit AEXHIBIT "A" FM# 447808-1-52-01 Page 1 of 13 OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT Between STATE OF FLORIDA, DEPARTMENT OF TRANSPORTATION ("DEPARTMENT") and City of Miami, a political subdivision of the State of Florida ("CITY") THIS AGREEMENT is made and entered into as of April 1, 2024, by and through the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida (the "Department"), and City of Miami, a political subdivision of the State of Florida (the "City"), collectively referred to as the "Parties." RECITALS A. Upon approval of the Department's Work Program by the State of Florida Legislature, and adoption by the Department Secretary, the Department shall complete the various projects included in the Department Work Program; and B. Included in the Department Work Program is Project Number FM# 447808-1-52-01, SR 90 / US-41 / SW 7th St. [from E of SW 27 Ave. to W of SW 2nd Ave.] (the "Project"). A portion of the Project includes work on SW 4d' Ave. and SW 3rd Ave., in Miami, Florida, roads not on the State Highway System; and C. The City is the holder of ownership rights to SW 3rd Ave. and SW 4d' Ave., roads not on the State Highway System; and D. The Parties agree that it is in the best interest of each party for the Department to undertake and to complete all aspects of the Project, including but not limited to, the design, construction, construction inspection, maintenance during construction, utilities, easements, and other associated tasks; and E. The Parties further agree that it is in the best interest of each party to enter into this Agreement in order to allow the Department to construct and complete the Project. Rev. 03/24 FM# 447808-1-52-01 Page 2 of 13 TERMS NOW THEREFORE, in consideration of the premises, the mutual covenants and other valuable considerations contained herein, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows: 1. The recitals in this Agreement are true and correct, and incorporated into and made a part hereof. 2. The Parties agree that the Department intends to undertake and complete Project Number FM# 447808-1-52-01, which Project generally includes the following: • pavement restoration through milling and resurfacing; • ADA improvements such as upgrading substandard pedestrian ramps and detectable warnings; • upgrading pavement markings and replacing substandard signs; • upgrading pedestrian signalization features; • replacing signal and lighting pull boxes within sidewalk reconstruction; • widening the I-95 Southbound ("SB") off -ramp at SW 7th St. to four lanes;' • closing SW 4th Ave. at SW 7th St. and converting the traffic pattern from one way southbound to two lanes two-way traffic; • widening the SW 3rd Ave. from two lanes two-way traffic to three lanes two-way traffic with left turn at SW 3rd Ave. and SW 6th St., right turn lane at SW 3rd Ave. and SW 7th St.; • lighting improvements, including meeting required illumination level at signalized intersections and replacement of lighting pull boxes impacted by sidewalk restoration; • landscaping/tree disposition; • signalization improvements for 12 signalized intersection and 1 midblock crossing; and • utility relocation. The Project shall include improvements on SW 3rd Ave., from STA. 80+00 to STA. 83+78 LT/RT including SW 6th St. intersection, and on SW 4th Ave., from STA. 10+00 to STA. 13+98 LT/RT including SW 6th St. intersection (for purposes of this agreement, the "Off - System Project Limits"). The work within the Off -System Project Limits shall include, but may not be limited to the following (hereinafter referred to as the "Local Roadway Improvements"): ' The widening of the I-95 SB off -ramp will be conducted partially on Parcel 100, which is a City of Miami Owned property the time of execution of this Agreement, and which will be acquired by the Department in fee simple at a later date. Rev. 03/24 FM# 447808-1-52-01 Page 3 of 13 a) pavement restoration through milling and resurfacing; b) upgrading pavement markings and replacing substandard signs; c) driveway reconstruction; d) incidental sidewalk reconstruction and paver re -set due to proposed signalization improvements; e) upgrading pedestrian signalization features; f) replacing signal boxes within sidewalk reconstruction; g) replacing lighting pull boxes within sidewalk reconstruction; h) Installation of new light poles; i) widening the SW 3rd Ave. from two lanes two-way traffic to three lanes two-way traffic with left turn at SW 3rd Ave. and SW 6th St., right turn lane at SW 3rd Ave. and SW 7th St.; j) utility relocation due to widening of SW 3rd Ave.; k) widening the I-95 SB off -ramp at SW 7th St. to four lanes; 1) closing SW 4th Ave. at SW 7th St. and converting the traffic pattern from one way southbound to two lanes two-way traffic; and m) converting the traffic pattern of SW 4th Ave. from one way northbound to two lanes two-way traffic. The Project shall further include all activities associated with or arising out of the construction of the Local Roadway Improvements. In the event that the Project requires the acquisition of additional right-of-way within the Off -System Project Limits, the Department shall acquire such right-of-way in order to complete the Project. The City shall cooperate with and shall support the Department's work efforts in these regards. The Department will design and construct the Project in accordance with all applicable federal and state laws and regulations and in accordance with Department design and construction standards as set forth in the Department' s guidelines, standards, and procedures. The Department shall have final decision authority with respect to the design, the design review process, and construction of the Local Roadway Improvements, and the relocation of any utilities that the Department may determine to be required. 3. The Parties acknowledge and agree that the City will review the Project Design Plans ("Project Design Plans") and shall submit its comments, if any, via Electronic Reviewer Comments ("ERC"). 2 The widening of the I-95 SB off -ramp will be conducted partially on Parcel 100, which is within the City of Miami's right- of-way at the time of execution of this Agreement, and which will be acquired by the Department in fee simple at a later date. Rev. 03/24 FM# 447808-1-52-01 Page 4 of 13 The Department shall provide the City access to the ERC, and the Department shall use the ERC to submit the Project Design Plans for the City to review. When the Department places the Project Design Plans in the ERC, the Department will designate a Comment Due Date and a Response Due Date. The City shall submit its comments with regards to the Proj ect Design Plans on or before the Comment Due Date, and the Department shall respond to the City' s comments, if any, on or before the Response Due Date. If the City does not submit its comments by the Comment Due Date, the City will be deemed to have approved the Project Design Plans submitted by the Department. The review process for the Project Design Plans will be deemed concluded when the Department has submitted the Final Project Design Plans to the ERC, and the Comment Due Date and Response Due Date for the Final Project Design Plans have passed, and the Department has addressed all of the City's comments that were submitted through the ERC. Once the review process is concluded, the Department will construct the Project in accordance with the Final Project Design Plans submitted through the ERC. The City acknowledges and agrees that, during construction of the Local Roadway Improvements, the Department will only utilize the services of law enforcement officers when required by the Department' s Standard Specifications for Road and Bridge Construction, and no additional requirements will be imposed. No further agreements or permits shall be required for production or construction of this Project. Major modifications of the approved Project Design Plans must be submitted to the City for review. A "Major Modification" is any modification that materially alters the kind or nature of the work depicted in the approved Project Design Plans, or that alters the integrity or maintainability of the Local Roadway Improvements, or related components. The City's review shall be within the reasonable time schedule proposed by the Department, in order to avoid delay to the Department's construction contract. In the event that any Major Modifications are required during construction, the Department shall be entitled to proceed with the modifications that are necessary to complete the construction of the Project, and shall, upon identifying the need for a Major Modification, immediately notify the City of the required changes prior to proceeding with implementation of the same. It is specifically understood and agreed that any such changes during construction shall not delay nor affect the timely construction schedule of the Project. 4. The City agrees to fully cooperate with the Department in the construction, reconstruction and relocation of utilities that are located within the City's right-of-way, within the Off -System Project Limits. The utility relocations, if any, which may be required by the Department for purposes of the Project, shall be done in accordance with the Department's guidelines, standards and procedures. Rev. 03/24 FM# 447808-1-52-01 Page 5 of 13 The Department shall submit the proposed utility relocation schedule to the City. Utility relocations, if any, shall be done in accordance with the provisions of Chapter 337, F. S. Additionally, the City agrees to fully cooperate with the Department in the removal of any encroachments or permitted improvements, and in the modification of any driveway connections, located within the City's right-of-way, within the Off -System Project Limits, that are in conflict with the Project, and the City hereby authorizes the Department to take any legal action necessary to effectuate the removal of any such conflicting encroachments or permitted improvements, and to effectuate the modification of any such driveway connections. The Department shall coordinate with the City for said removals or modifications, at no cost to the City. 5. The City agrees to perpetually maintain the Local Roadway Improvements. To maintain means to perform normal maintenance operations for the preservation of the Local Roadway Improvements, which shall include but is not limited to, roadway surfaces, roadside structures, drainage, signing and pavement markers, and lighting. This excludes improvements E, F, and K per item number 2. additionally, the Parties understand and agree that the Department shall transfer any permit(s) required for the construction of the Local Roadway Improvements, if any, to the City as the operational maintenance entity, and the City agrees to accept said transfer and to be fully responsible to comply with all operational and maintenance conditions of the permit(s), at its sole cost and expense. Notwithstanding the requirements hereof, maintenance during construction shall be the responsibility of the Department and its Contractor, as set forth in paragraph 9 of this Agreement. 6. The Parties acknowledge and agree that the City's right-of-way and the improvements and structures located within the City's right-of-way, are and will remain under the ownership of the City, and that the Department will not have any ownership interest in the right-of-way, improvements, or structures located thereon or installed therein pursuant to this Proj ect. 7. The Department shall require its construction Contractor to maintain, at all times during construction, Commercial General Liability insurance providing continuous coverage for all work or operations performed under the construction contract. Such insurance shall be no more restrictive than that provided by the latest occurrence form edition of the standard Commercial General Liability Coverage Form (ISO Form CG 00 01) as filed for use in the State of Florida. The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a $5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess Rev. 03/24 FM# 447808-1-52-01 Page 6 of 13 policy, or such other minimum insurance coverage that may be required by the Department for the construction of the Project, in accordance with the Department's Standards and Specifications for Road and Bridge Construction. The Department shall further cause its Contractor to name the City and the Department as additional insured Parties on the afore -stated policies, and to provide evidence of Workers' Compensation Insurance in accordance with the laws of the State of Florida and in amounts sufficient to secure the benefit of the Florida Workers' Compensation law for all employees. 8. The Department shall notify the City at least 48 hours before beginning construction within the City's right-of-way. Such notification may be provided via email to the City, and the notice requirements set forth in paragraph 20 shall not apply to this paragraph. The Department agrees that the City may, at reasonable times during the construction of the Local Roadway Improvements, inspect the Contractor's construction site and perform such tests as are reasonably necessary to determine whether the goods or services required to be provided by the Contractor, pursuant to the Contractor's Construction Agreement with the Department, conform to the terms of said Construction Agreement. Upon request by the City, the Department shall coordinate with its Contractor to provide access to the City for performance of said inspections. During the construction work related to the Project, the City shall fully cooperate with any such work being performed by the Department and the Department' s contractors. The City shall not commit nor permit any act which may delay or interfere with the performance of any such work by the Department or the Department's contractors, unless the Department agrees in writing that the City may commit, or permit said act. 9. Maintenance during construction within the Off -System Project Limits, commencing as of the first date of construction, shall be the responsibility of the Department's Contractor. Notwithstanding, neither the Department nor its Contractor shall be responsible for mowing or removing litter during construction of the Project. After completion of construction, the City shall assume all maintenance responsibilities for the Local Roadway Improvements. Upon completion of construction, the Department is required to invite the City on the Final Inspection of the work within the Off -System Project Limits and will incorporate legitimate City concerns that are within the scope of the contract into the final Project punch list to be corrected by the Contractor. Notice for Final Inspection shall be delivered via email to the City and the notice provision of paragraph 20 shall not be applicable. However, if the City does not attend the Final Inspection, the Department shall proceed to Rev. 03/24 FM# 447808-1-52-01 Page 7 of 13 conduct the Final Inspection, finalize the Project punch list, and issue a Notice of Final Acceptance to its Contractor. The Final Inspection shall be performed, and the Notice of Final Acceptance shall be issued in accordance with the Department's Standard Specifications for Road and Bridge Construction and the Construction Proj ect Administration Manual (CPAM). Upon issuance of the Notice of Final Acceptance to the Contractor, the Department shall provide a copy of said notice to the City. As of the date of the Notice of Final Acceptance, the City shall be immediately responsible for the maintenance of the Local Roadway Improvements and shall further accept the Local Roadway Improvements. The Department, however, shall have the right to assure completion of any punch list by the Contractor. Notwithstanding the issuance of the Notice of Final Acceptance, the City may notify the Department Project Manager of deficiencies in the Local Roadway Improvements that may be covered by the warranty provisions in the contract between the Department and its Contractor. The Department shall enforce the warranty if remedial action is required by the warranty provisions, as determined by the Department. Upon completion of all work related to construction of the Project, the Department will be required to submit to the City final as -built plans for the Local Roadway Improvements and an engineering certification that construction was completed in accordance with the plans. Additionally, the Department shall vacate those portions of the City's right-of-way used to construct the Local Roadway Improvements, and shall remove the Department's property, machinery, and equipment from said portions of the City's right-of-way. Furthermore, the Department shall restore those portions of the City right-of-way disturbed by Project construction activities to the same or better condition than that which existed immediately prior to commencement of the construction of the Project. 10. Upon submission by the Department of a deed, with accompanying sketch and legal description, for the transfer to the City of any additional right-of-way acquired by the Department within the Off -System Project Limits, the City shall forthwith submit the same to its governing board or commission for approval and acceptance of such additional right-of-way. 11. This Agreement shall become effective as of the date both parties hereto have executed the Agreement. Prior to commencement of construction, the Department may in its sole discretion terminate this Agreement if it determines that it is in the best interest of the public to do so. If the Rev. 03/24 FM# 447808-1-52-01 Page 8 of 13 Department elects to terminate this Agreement, the Department shall deliver formal notice of termination to the City, as set forth in paragraph 20 of this Agreement. 12. In the event that any election, referendum, approval, ratification, notice or other proceeding, or authorization is required to carry out the Project, the City agrees to expeditiously initiate and consummate, as provided by law, all actions necessary with respect to any such matters, with time being of the essence. 13. The Department may utilize federal funds to design and construct the Project. In the event that the Project shall be constructed using federal funds, all costs incurred must be in conformity with applicable federal and state laws, regulations, and policies and procedures. 14. The Department's performance and obligations under this Agreement are contingent upon an annual appropriation by the Legislature. If the Department's funding for this Project is in multiple fiscal years, funds approval from the Department's Comptroller must be received each fiscal year prior to costs being incurred. 15. In the event that this Agreement is in excess of $25,000, and the Agreement has a term for a period of more than one year, the provisions of Section §339.135(6)(a), Florida Statutes, are hereby incorporated into this Agreement and are as follows: "The department, during any fiscal year, shall not expend money, incur any liability, or enter into any contract which, by its terms, involves the expenditure of money in excess of the amounts budgeted as available for expenditure during any such fiscal year. Any contract, verbal or written, made in violation of this subsection is null and void, and no money may be paid on such contract. The department shall require a statement from the comptroller of the department that funds are available prior to entering into any such contract or other binding commitment of funds. Nothing herein contained shall prevent the making of contracts for periods exceeding 1 year, but any contract so made shall be executory only for the value of the services to be rendered or agreed to be paid for in succeeding fiscal years; and this paragraph shall be incorporated verbatim in all contracts of the department which are for an amount in excess of $25, 000 and which have a term for a period of more than 1 year." 16. Nothing in this Agreement shall be deemed or otherwise interpreted as waiving the Department's sovereign immunity protections, or as increasing the limits of liability as set forth in Section 768.28, Florida Statutes. Rev. 03/24 FM# 447808-1-52-01 Page 9 of 13 17. A modification or waiver of any of the provisions of this Agreement shall be effective only if made in writing and executed with the same formality as this Agreement. 18. This Agreement shall be governed by the laws of the State of Florida. Any provision hereof found to be unlawful or unenforceable shall be severable and shall not affect the validity of the remaining portions hereof. Venue for any and all actions arising out of or in any way related to the interpretation, validity, performance or breach of this Agreement shall lie exclusively in a state court of appropriate jurisdiction in Leon County, Florida. 19. No term or provision of this Agreement shall be interpreted for or against any party because that party's legal counsel drafted the provision. 20. In accordance with Executive Order No. 11-02 the Department's Vendor/Contractor(s) shall utilize the U.S. Department of Homeland Security's E-Verify system, in accordance with the terms governing use of the system, to confirm the employment eligibility of; i. all persons employed by the Vendor/Contractor during the term of the Contract to perform employment duties within Florida; and ii. all persons, including subcontractors, assigned by the Vendor/Contractor to perform work pursuant to the contract with the Department. 21. All notices required pursuant to the terms hereof, shall be in writing and shall be sent by first class United States Mail, facsimile transmission, hand delivery or express mail. Notices shall be deemed to have been received by the end of five (5) business days from the proper sending thereof unless proof of prior actual receipt is provided. Unless otherwise notified in writing, notices shall be sent to the following: To the City: To the Department: Director of Transportation Operations State of Florida, Department of Transportation 1000 N.W. 111th Avenue Miami, Florida 33172 Rev. 03/24 FM# 447808-1-52-01 Page 10 of 13 22. The City, by and through Resolution No. , attached hereto as Exhibit " has duly authorized the execution and delivery of this Agreement and agrees to be bound by the terms hereunder, and has further authorized the Mayor or his designee to take all necessary steps to effectuate the terms of this Agreement. Rev. 03/24 FM# 447808-1-52-01 Page 11 of 13 Remainder of page is left intentionally blank. Rev. 03/24 FM# 447808-1-52-01 Page 12 of 13 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the dates exhibited, by the signatures below. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION By: Name: Title: Director of Transportation Operations Date: Attest: Name: Title: Department Legal Review: By: Name: Rev. 03/24 FM# 447808-1-52-01 Page 13 of 13 THE CITY OF MIAMI By: Name: Title: Date: Attest: Name: Title: Approved as to form and legality: By: Name: Rev. 03/24 CONTRACT PLANS COMPONENTS ROADWAY PLANS SIGNING 4ND PAVEMENT MARKING PLANS SIGNALIZATION PLANS LIGHTING PLANS STRUCTURE PLANS A DETAILED INDEX APPEARS ON THE KEY SHEET OF EACH COMPONENT INDEX OF ROADWAY PLANS SHEET NO. SHEET DESCRIPTION 1 KEY SHEET 2 SIGNATURE SHEET 3 - 8 TYPICAL SECTIONS 9 TYPICAL SECTION DETAILS 10 OPTIONAL MATERIALS TABULATION 11 17 PROJECT CONTROL 18 GENERAL NOTES 19 46 ROAM/AY PLAN 47 50 SPECIAL DETAILS 51 52 DRAINAGE PLAN 53 DRAINAGE STRUCTURES 54 - 84 TEMPORARY TRAFFIC CONTROL PLANS 85 - 112 UTILITY ADJUSTMENTS 113 140 TREE DISPOSITION PLAN 141 - 142 TREE DISPOSITION CHART GR-1 GR-2 ROADWAY SOIL PROFILES ROADWAY SOIL SURVEY DEPA 8 TAl TE OF FL #RIIDA =ENT OF TRANSPORTATION ROADWAY PLANS FINANCIAL PROJECT ID 447808-1-52-01 & 447808-1-52-02 (FEDERAL FUNDS) MIAMI-DADE COUNTY (87120001) STATE ROAD ND. 90 (US-41/SW 7TH ST) FROM EAST OF SW 27TH AVE TO WEST OF SW 2ND AVE GOVERNING STANDARD PLANS: Florida Department of Transportation, FY2025-26 Standard Plans fur Road and Bridge Construction and applicable Interim Revisions (IRs). Standard Plans for Road Construction and associated !Rs are available at the following website: http://www.fdot.gov/design/standardplans GOVERNING STANDARD SPECIFICATIONS: Florida Department of Transportation, FY2025-26 Standard Specifications for Road and Bridge Construction at the following website: http://www.fd ot.gov/proyramrnarragenrent/Implemented/Speceooks PROJECT LOCATION ORL: httn://tin(-.rr/hsgsnz PROJECT LIMITS: BEGIN ISP 2.998 - END PAP 0.452 EXCEPTIONS: NONE BRIDGE LIMITS: NONE RAILROAD CROSSING: NONE THIS PROJECT TO BE LET TO CONTR4CT WITH FINANCIAL PROJECT !D(S): 443905-1-52-01, 447808-1-52-01, 447808-1-52-02 LOCATION OF PROJECT ROADWAY PLANS ENGINEER OF RECORD: MEHRDAD EBRAHIMI, P.E. P.E. LICENSE NUMBER 93921 H.W. LOCHNER, INC. 8750 N.W. 36 STREET, SUITE 360 MIAMI, FLORIDA 33178 (305) 503-9873 CONTRACT NO.: CAM92 VENDOR NO: F4-55418 FDOT PROJECT MANAGER: MARIO DURAN, P.E. OFF -SYSTEM AGREEMENT CONSTRUCTION FISCAL SHEET CONTRACT NO. YEAR NO. T6589 26 THE ELECTRONIC PAVEMENT WIDENING OFF -SYSTEM ROADWAY IMPROVEMENTS RAMP WIDENING AREA DETAIL NOT TO SCALE NOTE.' CONSTRUCT LONGITUDINAL AND TRANSVERSE JOINTS AS PER FDOT STANDARD 350-001 EL.= (19.37) CONSTRUCT EXPANSION JOINTS TRANSVERSE JOINT (TYP.J 30 MILLING & RESURFACING LII'AITS MATCH EXIST. STA. 30+65.32 OFOC- -- MILLING & RESURFACING MATCH EXIST. 5TA. 13+97.C5 END C&G TYPE "F" I'IATCH EXIST. PT STA. 13+91. 18 BEGIN C&G TYPE "F" PIATCH E,flbl. PC STA. 13+64.29 '11 IV875 BEGIN C&C TYPE "F" 11ATCH EXIST. PC STA. 13+29.18 8"E STA. 30+95.75 /2 SURVEY SW 610 ST = STA, 13+45.23 SURVEY SW 426 AVE 11. E. +14.31 END C&G TYPE "F" WATCH EXIST. PT STA. 13+0931 END C&G TYPE "F" 11ATCH EXIST. STA. 12+86.71 SEE ROADWAY PLAN DETAIL SHEET (DETAIL G) FOR ADDITIONAL INFORMATION BEGIN C&G TYPE "F' WATCH EXIST. STA. 12+43.48 END CSG TYPE "F" END TAPER HATCH EXIST STA. 11+93.10 BEGIN TAPER STA. 11+23.86 946' RT TRAILING .ANCHORAGE 1.11 H FLARED END STA. 56+74.55 50.28' LT. 9/AV LINE STA. 56+59.6 '5.80' LT. BEGIN WIDENING STA. 56+55.73 48.00LT (DETAIL H) ////° END C&G TYPE ''F" I'4ATCH EXIST. PT STA. 13+91.02 ( 9� bCY iV(D)- 31 6tfi ST.; 32D) �� SURvfr-sty. BEGIN CSC TYPE "F" MATCH EXIST. PC STA. '+63.25 MILLING & RESURFACING L111ITS MATCH 'EXIST 5TA. 3 +36.62 BFOC(D)- SEE ROADVV4Y.PLAN DETAILS14E DFTAIL_FL Rf).ADD1E1L L 1NF1))337)9T30\ V(L craGq6 W b 2 OI -1(D) G(D) —07-6 --------- --�—®BCD)=::: , CONSTRUCT GUAP,DRAIL APPROACH TPA IrSITION RETROFIT LI INDEX 460-473; SCHEME 5 1 rr TL-3 GVARDRAIL Ca STA. 57+23147 14.00' LT. STA. 56+59.53 0.12' RT. LEGEND. o � ED run lY I / END IN1DENING STA. 56+41. 05 37.59 LT. k 1'AILLING & RESURFACING PAVEMENT WIDENING 6" CONCRETE SIDEWALK 4" CONCRETE SIDEWALK CONICRETE VVIDENIIVG DETECTABLE IVARNING SOD TURNAROUND REVISIONS ENGINEER OF RECORD DATE DESCRIPTION DATE DESCRIPTION MEHRDAD EBRAHII'4I, P.E. LICENSE NUMBER' 93921 H.W. LOCHNER, INC. 8750 N.VI. 36TH STREET, SUITE 360 MIAMI, FL 33178 3T9 TR OF FPO2VZA DEP, ii-r.IfE/A-T 775CrIASPURTEITTUAr ROAD NO. COUNTY F 542 604L PROJECT ID SR 90 MIAMI-DADE 447808-1-52-01 ROADWAY PLAN SHEET NO. 43 OFF -SYSTEM ROADWAY IMPROVEMENTS f JET- +70.07 25.00' LT. ('MILLING & RESURFACING LIMITS ('MATCH EXIST. STA. 36+11.3H --BFOC(OJ-ram l 0(aL . BFQ�[ - - 50)) ) _ L2 - - - --- - - - ------ - 5` 1 t- 5t�)6th -ST: - s(o) - -3 sr� - L .. . 1V87`5X`33'E @SLIRI EY • - - -G(51 C(D) G(D) G(D) G(D) 570- 31-QC F :-. YE �.^J F�C Q€17=.-.-.� -- BFOC(DI: V[`=BF02(�... _EOC- .RFnrifl� LL END C&G TYPE (=MATCH EXIST. SW 3RD AVE PT +20.06 PT STA 83+35.01 34.20' LT. HARMONIZATION +10.09 27.00' LT. PC +10.09 25.00' LT. PAN LINE LA R/VV LINE +41.04 62. BEGIN C&G TYPE "F" MATCH EXIST. PC STA 81+70.74 SOD +47.27 • 10.99' LT. 1 ' 11.2' . +36.09 11.00' LT 6 nb FuI U 4FAC I4N,TC4 EXIST 5 0 _0.23 5' R 15' R 76 2 l STA. 8 W 41-6 AVE STA f36+45.47 9 SURVEY SW 015 AI 25"00' RT. MILLING & P 'F4CIXG LIMITS � �•rL Ethr. TA. 3ti+83.76 -•r 1 - -5(D SVV 6th ST. END C0G TYPE "F" MATCH EXIST. +19.96 PT STA 83+34.566 25.00' RT. BEGIN GEC TYPE "F" MATCH EXIST. PC STA 82+83.77 4/IN LINE +61.29 11.00' RT. +50.07 10.92' RT. +25.73 11.01' RT. +14.51 11.00' PT. +90 23 11.02' PT. +79.03 11.00' RT. +54.74 .01' RT. +43.56 (4ATCIH LINE 81+20.00 F 16.5 15.5.1 j 25' 25' - IN(D)- UV(DF - - 5(D) 5(D G(D) G(D)- - - - LEGEND: /// O MILLING & RESURFACING WIDENING 4" COIVCP.ETE SIDEWALK 6" CONCRETE SIDEVALK IN. E. - MATCH EXISTING REVISIONS ENGINEER OF RECORD DATE DESCRIPTION DATE DESCRIPTION MEHRDAD ERRAHII'4I, P.E. LICENSE NUMBER' 93921 H.W. LOCHNER, INC. 6750 N.VI. 36TH STREET, SUITE 360 MIAI01, FL 33178 „0T.ATR OF FP OR7ZA OSP. STU'S-VT OF TRAIIS'PORT.ATTON ROAD NO. COUNTY FERANCEAL PROJECT ID SR 90 MIAMI-DADE 447808-1-52-01 ROADWAY PLAN SHEET NO. 44 62 O/:Dsnlr(D 25' 25' 16.5' 16.5 MATCH LINE 81+2 00 OFF -SYSTEM ROADWAY IMPROVEMENTS +11.77 10.99' LT +00. 60 11.01' LT END C&G TYPE "F" WATCH EXIST. PT STA 80+83.90 SOD PT +14.08 45. 05' LT. HARMONIZATION +41. 63 27.00' LT. BEGIN CNG TYPE "F" THATCH EXIST_ PC STA 80+11.61 PC +89.00 R/W LINE 20.00' LT. .. f051 FJ$G(Dl=... - --- +E4-- --NYAINA - -- --- .... -(0)9? (P +02.92 SR 90 / SW 7th ST. —R/V1 LINE +14.22 30.00' PT STA. 140+39.17 SURVEY SR 50 = STA. 80+00.00 SURVEY SW 3,A AVE ft/I/V LIIIE 5- O MILLING & P - RESURFACING LrTS MATCH EXIST_ • m 73.77' PT. •• • Un• C 5'E SV 69 15 cI$ +19.24 11.01' PT. +08.06 11.00' RT END CNG TYPE "F" THATCH EXIST. PT STA 80+83.34 PC +64.09 44.95' LT. +85.22 PC +64.27 PT +89.09 20-00' LT. oD) 141 f SURVEY BEGIN CNG TYPE "F" MATCH EXIST. PC STA 80+11-62 BT'D) - - PT +69.27 30.00' RT. R/W LINE R/VV LINE .. BLOC! D)l.rn� 142 143 LEGEND: /// MILLING N RESURFACING WIDENING 4" CONCRETE SIDEWALK E' CONCRETE SIDEWALK M.E. - MATCH EXISTING - -BK')Fr REVISIONS ENGINEER OF RECORD DATE DESCRIPTION DATE DESCRIPTION MEHRDAD ERRAHII'7I, P.E. LICENSE NUMBER' 93921 H.W. LOCHNER, INC. 8750 N.W. 36TH STREET, SUITE 360 MIAMI, FL 33178 ST.ATR OF FP OR%D,4 DSP. 2TRI.R;ST OF TRAA,06ORTAT70N ROAD NO. COUNTY FINANCIAL PROJECT ID SR 90 MIAMI-DADE 447808-1-52-01 _ROADWAY PLAN SHEET NO. 45 OFF -SYSTEM SIGNING AND PAVEMENT MARKING IMPROVEMENTS- o®jam®m r�wz� all ___--'-_ Jlh- �II 30 SW 6th ST. 10700 1 601 10700 11111 STA. 13+13 36" x36" ®I I I EXISTING SIEN (TO BE RE407ED) L _ _ 10700 1 601 +10.84 1820' LT- R/W LINE r1HDUl NHfI, \ \ 1Sf1Vl LNA,IHIIJ EXISTING SIGN (TO BE REMOVED)\ (DO NO \ E 444 L,J REVISIONS 24" WHITE ENGINEER OF RECORD DATE DESCRIPTION DATE DESCRIPTION MEHRDAD EBRAHII'4I, P.E. LICENSE NUMBER' 93921 H.W. LOCHNER, INC. 4750 N.VI. 3F7TH STREET, SUITE 360 MIAM1, FL 33178 32 SW 6th ST. y WRONG, L WAY I PAW LINE 10700 11121 STA. 58+61 03-8 MOO 60"x39" 2 45 2 AS EXISTING SIGN 6" YELLOW (TO HE HEINOV ED) PREFORMED THERMOPLASTIC WITH BLACK CONTRAST BORDER (TYP.) 6" WHITE WITH (IHITE/RED RPMS AT 20' C/C SPACING (TAP.) PREFORMED THERMOPLASTIC: WITH BLACK CONTRAST BORDER (TAP1 0 TA TR OF FP ORlZA 0.EP, 271125E'AT OF TRAASPURT.ATTUN ROAD NO. COUNT FINANCIAL PROJECT ID SR 90 MIAM1-DADS 447808-1-52-01 10700 1 co ,A-1Np1-z^rzz_ B 1 La J1 SIGNING AND PAVEMENT MARKING PLAN SHEET NO. CIACIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE F G 5-23.0 5-27 w ti OFF -SYSTEM SIGNING AND PAVEMENT MARKING IMPROVEMENTS PAW LINED 3d I 35 \--1E SURVEY SIN 6th 5T —R/W LINE 0700 11111 STA. 81+74 (R3-7R) 36"x36" MATCH LINE 81+20.00 �16.5' 16.5' 25' 25' `4/W LINE REVISIONS ENGINEER OF RECORD DATE DESCRIPTION DATE DESCRIPTION INEHRDAD EBRAHII'4I, P.E. LICENSE NUMBER' 93921 H.W. LOCHNER, INC. 5750 NLI. 3ETH STREET, SUITE 360 MIAMI, FL 33178 0T.ATR OF FP OR7ZA N.EP. RT.IfE aT OFTRAIIS'PORT.AT35— ROAD NO. COUNTY FINANCIAL PROJECT lD SR 90 M1AMI-DADE 447808-1-52-01 SIGNING AND PAVEMENT MARKING PLAN SHEET NO. 5-28 OFF -SYSTEM SIGNING AND PAVEMENT MARKING IMPROVEMENTS R/VV LINE 139 J ri -1 Ei L i L RAY LINE RAY LINE 25' 25' 16.5 16.5' MATCH LINE 81+20.00 v �r 0 ®, O Oml IL IlliV M ,�I+80.6 20.9 10700 11111 STA. 140+88 RON LINE 10700 11111 STA. 141+83 R3-06 36" x30" \ 110 wr--ter= II 2451''' RT. \\ III1Im II \\\ II QI—I�I V)/I =J it_J \ 1 1-I-cf I1 C.0 z I 0 0 I R/W LINE 142 \—C) 143 SURVEY SR 90 R/IP LINE • REVISIONS ENGINEER OF RECORD DATE DESCRIPTION DATE DESCRIPTION MEHRDAD E9RAHII'4I, P.E. LICENSE NUMBER' 93921 H.W. LOCHNER, INC. R750 N.VI. 36TH STREET, SUITE 360 AIAMI, FL 33178 STATE OF FP ORIZA N.EP. R711571 T OF TRAIIS'PORT,AT50IV ROAD NO. COUNTY FERANCEAL PROJECT l0 SR 90 MIAMI-DADE 447808-1-52-01 SIGNING AND PAVEMENT MARKING PLAN SHEET NO. 5-29 1Irl5l 117-R7�,I yT1 7)I 3-SECT., 1-WAY EX !STING (TO REMAIN) PROVIDE RETRJREFLECTIVE FLExr6LE OACKPLATE I 650-2-109 I o 3-SECT., 1-IIVAY 2 AS I C50-1-14 I 6 EA PEDESTRIAN SIGNAL HEAD DETAIL IP21P41 111 1611621 ■ PEU- SI SNAL 6oUNT DOWN 1-SECT, 2-WAY 4 AS 6 3-1-12 PHASE 1 PI IASC L{ TF: I TF 2 -1 O"O O"® O'® ®'O SW 4AV I EXIST. SIGN (TO REMAIN) SIGNAL HEAD AND SIGN DETAILS SW 6 St A EXIST SIGN (TO REMAIN) SW 6 St INTERNALLY ILLUI'4INATED STREET NAME SIGN 72" X 24" I 700-5-21 I PEDESTRIAN DETECTOR SIGNS A A t '- 1 EA 111 1410-3I P10-31 R10-31 1410-31 1 X 15" 9" X 15" 9" X 15" 9" X 15" 2 EA 2 EA 2 EA 2 EA 7E, II II NArl FOP I II GREEN II EXIST. SIGN (TO BE REMOVED) NW CORNER 1 EA R/11 LINE PROP. FPL SERVICE POINT I 635-2-11 I EXIST. FPL SERVICE DISCONNECT (TO BE REMOVED) 40 LF (1 RUN I1 POWER!) 40 LF Pz PROP. PEDESTRIAN PEDESTAL STA. 30+77.15, 34.60' (LT) 5 LF (1 RUN I1 PED.]) 1 EA 1 EA 2 EA OFF -SYSTEM SIGNALIZATION IMPROVEMENTS SW CORNER PROP. PUSH BUTTON (TYP.) CONTROLLER TIMING REFERENCE TABLE VEHICLE INOVEMENT 1 2 3 4 5 6 7 8 APPROACH DIRECTION IVB NB EB SB o APPROACH POSTED SPEED (MPH) 25 25 25 25 t ALL RED DISTANCE !FEET 42 50 48 54 L YELLOW CLEARANCE 3.4 3.4 3.4 3.4 ALL RED 2 2 2 2 PEDESTRIAN AIIOV6 ENT P2 P4 P6 P8 ', PED. CROSSING DISTANCE (FEET) 35 46 48 43 PEDESTRIAN WALK 7 7 7 7 i PEDESTRIAN CLEARANCE 10 13 14 12 fONTRO((FR NQTFS 1 I'4A3OR STREET. Sill 6 ST I'41NOR STREET: SW 4 AVE 2. FLASHING OPERATIONS: I'10VEI17ENT 2 & 6 YELL01/V I'40VEMENT 4 & 8 RED 3. ALL VEH. 6 PED. PHASES ACTUATED, PHASE 1 IS ON RECALL 4 WATTAGE DEMAND: 454 kV CONTROLLER ITEMS 630-2-12 632-7-1 635-2-11 635-2-12 639-1-122 639-2-1 641-2-12 660-4-11 660-4-12 670-5-140 664-90-102 60 LF 1 EA 9 EA 1 EA 1 A5 22 LF 1 EA 1 EA 4 EA 1 AS 1 EA EXIST. VIDEO DETECTION ZONES VIDEO CAMERA INOVEMENTS ZONE V0A V-1 6 V0A V-2 6 V2A V-3 2 V 4.4 V-4 4 REMOVAL ITEMS 632-7-6 639-1-620 646-1-60 665-1-60 670-5-600 1 EA 1 AS 1 EA 3 EA 1 AS 630-2-12 635-2-11 646-1-11 665-1-11 143 EXIST. 11ASTREMAIN) ARM fro 2 EA R/W LINE SURVEY 5VV 6 AVE I 635-2-11 I £N. 6_ST 0 N87'51'38"E 0)V//V6A '//,I G D R/W LINE Fz PROP. PEDESTRIAN PEDESTAL STA. 30+66.76, 25.53' (RT) 21 LF (1 RUIN [1 PED.]) 1 EA 1 EA 2 EA 630-2-12 635-2-11 646-1-11 665-1-11 Vz EXIST. MAST ARM (TO REMAIN) 2 E2 I 635-2-11 I 45 LF (3 RUNE 11 SIGNAL, 1 VIDEO, 1 PED.J) R/W LINE SE CORNER NE CORNER PROP. PED POLE (TYR.) PROP. PED SIGNAL (TY P-) 630-2-12 635-2-11 639-2-1 R/V/ LINE 47 LF (5 RUNS I2 SIGNALS 1 VIDEO, 1 POWER, 1 PED.J) 4 EA 47 LF PROP. MAST ARM V4 STA. 30+77.54 38.29' (LT) 630-2-12 635-2-11 649-21-1 6 LF (4 RUNS I1 SIGNAL, 1 VIDEO, 2 SPARES]! 2 EA 1 EA ARM LENGTH = 36.4' ARIN BEARING = 5 8T 52 17" Il1 PROP. PEDESTRIAN PEDESTAL STA. 31+14.30, 34.52' (LT) vl 5 LF (I RUN I1 PED.]) 1 EA 1 `A 2 EA 630-2-12 635-2-11 646-1-11 665-1-11 EXIST PED. PEDESTAL TO BE REINOVED 55 LF (5 RUNS C2 SIGNALS, 1 VIDEO, 1 POWER, PED.]) 55 LF R/W LINE - - - - -&LOCO)) V//v4 /A0-- -� g; SURVEY -- (§)W 6 S. O AVE s.e 1 III LINE 635-2-11 2 E.4 PROPdESTRIAN PEDESTAL ST%./31+2151, 24.7B' (�4T) F! p l l - LF (1 RUN 630-2-12 [l PED]) 635-2-11 1 EA 11 1 EA 11 2EA 14./ ���� 639-2-1 9+J6,45.36' (RT) PROP FPL SERVICE DISCONNECT AND I'4ETER CAN 25 LF (6 RUNS I3 SIGNALS, 1 VIDEO, 1 POWER, 1 PED.]) 25 LF TRAFFIC CABINET CONTROLLER STA. 31+20.12 59.44' (RT) EXIST. TRAFFIC CABINET (TO BE REMOVED) R/VV LINE SW6ST&SW 4 AVE INTERSECTION ID 5213 REVISIONS ENGINEER OF RECORD DATE DESCRIPTION DATE DESCRIPTION JOSEPH IN. CALDERON TORRES II, P.E. LICENSE NUMBER' 90625 H.W. LOCHNER, INC. 9750 N.W. 30 STREET, SUITE 360 MIAMl, FL 33178 „'T4TO, OF FPO250A 06" 2TRt5?a'T OF TRAIA'PORTA TSON ROAD NO. COUNTY FINANCfAL PROJECT 1D SR 90 MIAMI-DADE 447806-1-52-01 SIGNALIZATION PLAN SHEET NO. T-16 SIGNAL HEAD AND SIGN DETAILS DODO 30 3-SECT. 1-VVAY R AS 650-1-14 A A SW 6 St SW 3 Av NW CORNER INTERNALLY ILLUMINATED INTERNALLY ILLUMINATED STREET NAME SIGN STREET NAIVE SIGN 72" X 24" 72" X 24" 700-5-21 I 700-5-21 I 2 EA 2EA PEDESTRIAN SIGNAL HEAD DETAIL i'2IPAI IP4�PnI IPf1�Rl IP,9IP-'I ■ PED. 5I6NA2 cow- Nrnmn I -SECT., 2-VVAY 4 AS 6'3-1-12 SPECIAL S.O.P. O PHASE 1 PRASE 2 PIIASC 3 L�{TFI ITF2ITF3 --1 O+® O+® O+O OFF —SYSTEM SIGNALIZATION IMPROVEMENTS PEDESTRIAN DETECTOR SIGNS A A A A R10-31 9" X 15" 2 EA CONTROLLER T/I'4ING REFERENCE TABLE VEHICLE MOVEMENT 2 3 4 5 6 7 8 APPROACH DIRECTION IV8 NB EB 58 APPROACH POSTED SPEED (MPH) 30 25 25 25 ALL RED DISTANCE (FEET) 60 62 60 62 2 YELLOW CLEARANCE 4 4 4 4 ALL RED 2.2 2.2 2.2 2.2 PEDESTRIAN IUIOVEINENT P2 P4 P6 P8 - PED. CROSSING DISTANCE (FEET) 38 N 39 ,3 PEDESTRIAN WALK 7 7 7 7 U PEDESTRIAN CLEARANCE 11 4 I1 9 CONTROI I FR NOTFS 1 I'4A3OR STREET. 54V 6 57 I'41NOR STREET: SVV 3 AVE 2. FLASHING OPERATIONS: I'4OVEIi7ENT 2 & 6 YELLOW 1'NI)VE MENIT 4 & 8 RED 3. ALL VEH. & PED. PHASES ACTUATED, PHASE 1 IS ON RECALL 4 WATTAGE DE1,1AND: 472 IV CONTROLLER ITEMS 630-2-12 632-7-1 635-2-11 635-2-12 639-1-122 639-2-1 641-2-12 660-4-11 660-4-12 670-5-140 684-90-102 60 LF 1 ER 9 EA 1 EA 1 AS 20 LF 1 EA ] ER 4 EA 1 AS 1 EA ®; - R10-31 P,10-31 9.'X 15" 9"X 15" 2 EA 2EA 610-3I 7" X Is 2 EA VIDEO DETECTION ZONES VIDEO CAMERA I00VEINENTS ZONE I'8A V-1 8 V2A V-2 V4A V4B V-3 4 V6A V-4 6 SVV CORNER 1 EA R/W LINE 67 LF (1 RUN I1 PED. II PROP PEDESTRIAN PEDESTAL STA- 36+17-09, 23-17' (LT) 6 LF (1 RUN L1 PED.)) 1 EA 1 EA 2 E.4 R/I/V LINE�i==�Z SURVEY SW 6 ST PROP. FPL SERVICE POINT I 635-2-11 I R/VI LINE 0 IVV- 6 ST , I1///V6A ///I -G(D) �'L GF(7G_ STA. 36+12.43 17.92' (RT) 7 LF (5 RUNS C2 SIGNAL, 1 VIDEO, 2 SPARES)) 4 EA 1 EA 630-2-12 635-2-11 649-21-5 ARIN LENGTH 1 = 39.8' ARM LENGTH 2 = 34.3' ARIN BEARING 1 = N 87' 49' 53" E ARM BEARING 2 = N 02' 10' 07" W PROP. PEDESTRIAN PEDESTAL STA. 36+20.08, 23.64' (RT) 6 LF (1 RUN 11 PED. I) 1 EA 1 EA 2 E.4 630-2-12 635-2-11 646-I-11 665-7-11 PROP. PUSH BUTTON (TYP.) 64 LF (5 RU IS L1 POVIER, 2 SIGNALS, 1 VIDEO, 1 P6ED l0 ti4 L R/VV LINE II R/11 LINE R/IlV LINE NE CORNER PROP. PED SIGNAL (TY P.) PROP. INAST ARM STA. 36+75.85 30 30' (LT) 630-2-12 635-2-11 649-21-8 5 LF(S RUNS I2 SIGNAL, 1 VILIEO, 2 SPAREST) 4 E4 EA M LENGTH 1 = 45.8' 2 = ; z20" E BEARING 2 = 5 87° 47' 4" VV PROP- PEDESTRIAN PEDESTAL 1 STA. 36+73.70, 22.58' (LT) O 630-2-12 635-2-11 646- 665-I-11 — R/kV -I 4 LF (1 RUN 11 PED.I) 1 EA 1 EA 2 EA • i 2A aD)42 LF NS7°5 33, 630-2-1 I4 RUNS C2 5I6NAL5- r1VIDE0,1 PED. I) SVV ,ST R/W LINE PROP. PEDESTRIAII PEDESTAL STA. 36+73. 70 22.58' (6 P4 3 LF (1 RUN I1 RED.]) 3 EA 1 EA 2 EA 630-2-12 635-2-11 646-1-11 665-1-I1 LF 630-2-]2 (4 RUNS L2 SIGNALS. WITH 2O70 L5 CONTROLLEE I 1 VIDEO, 1 PED.I) PROP. M-660X TRAFFIC RIVET R STJ36+69.31, 33.72' (RT PROP. FP! SERVICE DISCONNECT AND METER CAN STA. 36+69.97, 52.30' i RT) SE CORNER PROP. PED POLE (TY P.) SW 6 ST AT SW 3 AVE INTERSECTION ID 8346 REVISIONS ENGINEER OF RECORD DATE DESCRIPTION DATE DESCRIPTION JOSEPH IN. CALDERON TORRES II, P.E. LICENSE NUMBER' 90625 H.W. LOCHNER, INC. 6756 N.V. 36 STREET, SUITE 360 MIAMl, FL 33178 STATE OF FPO25D4 0Fi". R11SIB?aT OFTRAASYO6TI T5P/N ROAD NO. COUNTY FINANCIAL PROJECT ID SR 90 M1AM1-DARE 447806-1-52-01 SIGNALIZATION PLAN SHEET NO. T-17