File Number: 10-01340 Final Action Date: 12/16/2010
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 1 TO THE
PROFESSIONAL SERVICES AGREEMENTS WITH TARGET ENGINEERING
GROUP, INC. AND NETWORK ENGINEERING SERVICES, INC. D/B/A BOLTON
PEREZ AND ASSOCIATES, IN SUBSTANTIALLY THE ATTACHED FORM, FOR THE
PROVISION OF MISCELLANEOUS CONSTRUCTION ENGINEERING AND
OBSERVATION SERVICES, IN AN AMOUNT NOT TO EXCEED $500,000, PER
FIRM,THEREBY INCREASING THE TOTAL CONTRACT AMOUNT FOR EACH FIRM
FROM $500,000, TO AN AMOUNT NOT TO EXCEED $1,000,000, PER FIRM;
ALLOCATING FUNDS FROM THE APPROPRIATE CAPITAL IMPROVEMENT
PROJECTS.
WHEREAS, on October 25, 2007, pursuant to Request for Qualifications No. 06-07-036, the City
of Miami ("City") executed Professional Services Agreements ("Agreements") with Target Engineering
Group, Inc. and Network Engineering Services, Inc., d/b/a Bolton Perez and Associates, for the
provision of Miscellaneous Construction Engineering and Observation Services in an amount not to
exceed $500,000, per firm; and
WHEREAS, the original expenditure limits of $500,000 per firm has diminished by varied, but
significant amounts, based on the volume of work assigned to each firm, and the complexity of the
projects assigned; and
WHEREAS, the current remaining contract balance is not sufficient to cover the remaining costs
anticipated for various ongoing projects such as the Northwest 14th Street Multimedia Streetscape,
Brickell Key Bridge Repairs, and North Spring Garden Greenway Improvements; and
WHEREAS, it is now necessary to enter into Amendment No. 1 with both firms, respectively,
increasing the Agreements, in an amount of $500,000, from $500,000 to a final not to exceed amount
of $1,000,000; and
WHEREAS, funds are to be allocated from the appropriate Capital Improvement Projects;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by
reference and incorporated as if fully set forth in this Section.
Section 2. The City Manager is authorized {1} to execute Amendment No. 1 to the Agreements
with Target Engineering Group, Inc. and Network Engineering Services, Inc., d/b/a Bolton Perez and
Associates, in substantially the attached form, for the provision of Miscellaneous Construction
Engineering and Observation Services, in an amount not to exceed $500,000, per firm, thereby
City of Miami
Page 1 of 2 File Id: 10-01340 (Version: 1) Printed On: 8/17/2017
File Number: 10-01340 Enactment Number: R-10-0558
increasing the total contract amount for each firm from $500,000, to an amount not to exceed
$1,000,000, per firm, with funds allocated from the appropriate Capital Improvement Projects.
Section 3. This Resolution shall become effective immediately upon its adoption and
signature of the Mayor.{2}
Footnotes:
{1} The herein authorization is further subject to compliance with all requirements that may be
imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter
and Code provisions.
{2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar
days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become