HomeMy WebLinkAboutExhibit 1CI T Y
0 P MIA M
I' I. ANNIN CI 1) P, 1' A li 'I' N It. N '1'
l)IiSI(IN II V I PI \V' CONMIiN'I'ti
CLASS 11 SI, CIA), PIS111\41'1'
1DR '10-023
MIAMI DADE COIJN'I'1' GSA
WEST LOT MULTI-UsE FACILITY
220, 226 NW 311,' S'I'iti.nl+'J'
227, 235 NW 2'''e S'I'.RLW1
Nli:I' DISTRICT: DOWNTOWN
10,13,2010
COMMENTS:
The following comments represent the unified vision of the Pre -Application Design Review Committee, which
consists of staff members in the Urban Design and Land Development Divisions. The City of Miami strives to
achieve diverse, sustainable, pedestrian -friendly neighborhoods, promote transit connections, and provide safe
and comfortable buildings, streets, and parks that contribute to a prosperous city fox all residents to enjoy.
9, Garage and office facades have been integrated into one articulated design.
2. Driveway opening grills need to be set back, A cross-section will be provided to demonstrate
assembly and set back.
3. Existing Live Oaks and Palms along NW 2iii' Avenue and other existing healthy native tree species
designated for removal, should be properly root pruned and relocated to an agreed upon off -site
location. Do not remove and dispose of healthy trees and palms.
4. A revised Tree Disposidon Plan is required to show existing trees to remain, relocate, or removal.
5. The NW 2" and 3n1 Street sidewalks and driveways shall be at a consistent grade / flush across
driveway areas. Trees shall be planted close to back of curb in tree grates or other approved grate
systems, in order to provide a clear path of walking away from the street. Expand sidewalks into
private property as necessary to accomplish an ample walking dimension / environment within this
urban context.
The Planning Department reserves the night to comment further on the project as details and/or explanations
are provided and may revise previous comments based on this additional information.
**s' Please note that the Planning Department reviews Special Permit proposals based on architectural design,
site planning and urban design issues. The project still needs to be reviewed and comply with other
department's requirements.
It is our intention with these comments to aid in expediting Special Permit applications with your
voluntary efforts in making the necessary changes; thereby, avoiding any preventable delays
particularly prior to a project's submission to the Large Scale Development Committee or the
Urban Development Review Board.
1 of