HomeMy WebLinkAboutScope of WorkATTE ASSISTANCE TO THE ELDERLY, INC. FY 2011 SCOPE OF WORK JANUARY 01, 2011-DECEMBER 31, 2011 1. ACTIVITY TITLE RELIEF PROJECT / EDI GRANT 2. ACTIVITY DESCRIPTION: (Reference to outline in letter) The rehabilitation, reconstruction and improvements of housing facilities serving elderly individuals. la. Installation of a security camera system encompassing the entire building such as resident hallways and Alzheimer's unit will prove useful in case of emergencies. In addition, placing cameras to the exterior of the building will provide a safer environment where residents. $25,000.00 lb. Installation of a security gate will secure and sections out the exterior backside of the building where residents can take walks such in common areas and prevent non - visitors, or strangers out. $9,000.00 lc. Repair metal fire exit doors will provide adequate security. $2,500.00 ld. Installation of an elevator security coding system for floors requiring added supervision such as Alzheimer's Units will provide a safer environment for the residents and visitors. $5,000.00 le. Restore the condition of the floor within the elevators which is necessary for safety reasons will provide a safer surface for residents and visitors to walk on. It will also facilitate easier flow of traffic for those in housekeeping and/or room service. $3,000.00 2a. Changing the light fixtures in the resident hallways will save energy, and promote a safer environment for our residents as well as support fall prevention. This will also decrease mood disorders and promote a livelier environment for residents to interact and socialize while minimizing retirement home stigmas. $15,000.00 2b.Tinting glass windows located in common areas such as elevator lobbies will reduce indoor heat and save energy. $10,000.00 3a. Replacing main kitchen equipment that is necessary to run day to day functions of a full kitchen serving three meals per day to 303 residents. $18,000.00 3b. By repairing the outsource connections to the main generator we will be better equipped to support our disaster plan in the event of a hurricane or electrical outage. This will also require us to replace the Base Tank due to rusting and decomposition. $20,500.00 3c. Replacement of 180 regular toilets to 180 handicap toilets, will address the need for residents who use wheelchairs or have mobility impairment. $42,300.00 3d. Replacement of flooring in resident units which have been damaged due to wear and tear allowing for a safer surface for residents to walk on. $60,000.00 3e. Replacement of damaged kitchenettes in resident units to provide adequate and functional furnishings that will also prevent accumulation for bacteria infested surfaces. $14,400.00 3f. Replacement of present water fountains on each floor to meet the needs for residents who use wheelchairs or are handicapped. $21,000.00 Total: $245,700.00 4.SOURCE CDBG 5. AMOUNT: $220,000.00 6. ACCOMPLISHMENTS: Provide residents with better lighting and adequate controlled temperatures, a secure and safe environment, adequate toilets and water fountains for handicap residents and those with impaired mobility, restored flooring and kitchens, and functional equipment to meet the demands of day to day functions of the facility 7. ACTIVITY ADDRESS: Residential Plaza at Blue Lagoon 5617 NW 7`h Street Miami, Florida 33126 8. CONTACT PERSON: Evelyn Torres Community Development Coordinator etorres@residentialplaza.com 305-267-2700 Ext. 200 Fax:305-267-2708 ATTE ASSISTANCE TO THE ELDERLY, INC. Timeline for Completion January 01, 2011-June 30, 2011 (18 months) REF.# ESTIMATED START DATE ACTIVITY DESCRIPTION Duration of Project / Estimated Date of Completion lc. January 3, 2010 Repair Metal Fire Exit Doors DP: 1 month EDC: February 7, 2011 2a. January 3, 2010 Changing the Light Fixtures DP: 18 Months EDC: June 30, 2011 2b. January 3, 2010 Tinting Glass Windows DP: 2 weeks EDC: January 18, 2011 3b. January 3, 2010 Repairing Main Generator and Replacing Base Tank DP: 18 months EDC: June 30, 2011 3c. January 3, 2010 Replacement of 200 Toilets DP: 18 months EDC: June 30, 2011 3d. January 3, 2010 Replacement of Flooring to Resident Units DP: 18 months EDC: June 30, 2011 3f. January 3, 2010 Replacement of Water Fountains DP: 18 months EDC: June 30, 2011 3e. March 01, 2010 Replacement of Kitchenettes to Resident Units DP: 6 months EDC: September 30, 2011 3a. March 01, 2010 Replacing Main Kitchen Equipment DP: 3 months EDC: June 30, 2011 la. June 01, 2010 Installation of Security Camera System DP: 2 months EDC: August 1, 2011 lb. June 01, 2010 Installation of Security Gate DP: 3 weeks EDC: June 24, 2011 ld. July 11, 2011 Installation of Elevator Security Coding System DP: 1 week EDC: July 18, 2011 le. July 25, 2011 Restoring Flooring in Elevators DP: 1 month EDC: August 31, 2011