HomeMy WebLinkAboutR-10-0474City of Miami
Legislation
Resolution: R-10-0474
City Hall
3500 Pan American
Drive
Miami, FL 33133
www.miamigov.com
File Number: 10-01245 Final Action Date: 10/28/2010
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE A GRANT OF EASEMENT, IN
SUBSTANTIALLY THE ATTACHED FORM, TO FLORIDA POWER AND LIGHT
COMPANY, A FOR -PROFIT FLORIDA CORPORATION, FOR A PERPETUAL,
NON-EXCLUSIVE EASEMENT OF AN APPROXIMATELY TEN (10) FOOT WIDE BY
THREE HUNDRED FORTY (340) FOOT LONG STRIP OF CITY OF MIAMI OWNED
PROPERTY LOCATED AT 1402 NORTHWEST 4TH STREET, MIAMI, FLORIDA
(ALSO KNOWN AS THE ORANGE BOWL COMPLEX ), AS MORE PARTICULARLY
DESCRIBED IN EXHIBIT "A", ATTACHED AND INCORPORATED, FOR THE
CONSTRUCTION, OPERATION AND MAINTENANCE OF UNDERGROUND
ELECTRIC UTILITY FACILITIES, WITH THE RIGHT TO RECONSTRUCT,
IMPROVE, CHANGE AND REMOVE ALL OR ANY OF THE FACILITIES WITHIN
SAID EASEMENT.
WHEREAS, Florida Power & Light Company ("FPL") has requested the grant of easement of
an approximately ten (10) foot wide by three hundred forty (340) foot long strip of City of Miami
("City") owned property located at 1402 Northwest 4th Street, Miami, Florida, (also known as the
Orange Bowl Complex); and
WHEREAS, this easement will be used to construct, operate and maintain underground
electric utility facilities (including wires, guys, cables, conduits and appurtenant equipment) to be
installed from time to time to service exclusively City -owned property, with the right to reconstruct,
improve, add to, enlarge, change the voltage of, change the size of and remove such facilities or any
of them within said easement, with full right of ingress thereto and egress therefrom; and
WHEREAS, the easement is necessary in order to bring electrical service to the new building
being constructed on said property; and
WHEREAS, the easement shall further contain a reverter provision that if the easement is
abandoned or discontinued, the easement shall cease and revert back to the City;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby
adopted by reference thereto and incorporated herein as if fully set forth in this Section.
Section 2. The City Manager is authorized{1} to execute a Grant of Easement, in substantially
the attached form, to FPL, a for -profit Florida Corporation, for a perpetual, non-exclusive easement of
City of Miami
Page 1 of 2 File Id: 10-01245 (Version: 1) Printed On: 8/14/2017
File Number: 10-01245 Enactment Number: R-10-0474
an approximately ten (10) foot wide by three hundred forty (340) foot long strip of City -owned property
located at 1402 Northwest 4th Street, Miami, Florida (also known as the Orange Bowl Complex), as
more particularly described in Exhibit "A", attached and incorporated, for the construction, operation,
and maintenance of underground electric utility facilities, with the right to reconstruct, improve,
change and remove all or any of the facilities within said easement.
Section 3. This Resolution shall become effective immediately upon its adoption and
signature of the Mayor.{2}
Footnotes:
{1} The herein authorization is further subject to compliance with all requirements that may be
imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter
and Code provisions
{2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar
days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become
effective immediately upon override of the veto by the City Commission
City of Miami Page 2 of 2 File Id: 10-01245 (Version: 1) Printed On: 8/14/2017