Loading...
HomeMy WebLinkAboutSubmittal-David Sacks-DERM Approval of Building Plans141.50' (M ) s 150.00' (R ) Site Plan 4'C.O.S WALL LEGAL DESCRIPTION: LOT 13 BLOCK L OF RESUBDIVISION OF A PORTION OF BISCAYNE ISLAND SUBDIVISION ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 40 AT PAGE 34 OF THE PUBLIC RECORDS' MIANI-DADS COUNTY, FLORIDA io-o0523- Sub;Hal- 11vrdSacKs_ �Er2m A Proves Flans See Pion Boy For Ewet Duck ad Boot Lill Dinrngon Dock/Boat Lifts Ken MI �TFIDDI , ex" 921 M.Veneluon *ay w.Rog Moroi Beach, Florid] 331.19 w . Conimctor to °Arvin ow r utility clearance prior to pile *kilo. call: 1-800- 432 -A770 mare BISCAYNE BAY New 4' x 45' Dock With EPE Grated Decking Existing Boat Lin and (4) Concrete, Support Piles To Remain 20'-3* /Umits of / Typical Both 25' Existing Access Walkway 4.f' x 26.1' and (5) Concrete Dock Support Piles To Be Removed Existing Terminal PbBonn 17.25' x 7.25' and (5) Concrete Lbck Support Piles To Be Removed New 40,000 Ib. Yochl — Boat Lift and (6)New _ Concrete Support Piles New 4' x 45' Dock frith EPE Crated Decking 16' Limits of Raring Typical Rath Sides New 24,000 lb. Yacht Boat Lilt and (6) New Concrete Support Piles 20' New 4'x17' Marginal Dock with EPE Grated Decking and Rang on Outside Edge Plan View Scale: 1' = 10' Existing Seawall To Remain 34' 6' DER PR NAME DATE COA A CTIO APP 1.0 Dock/Boat Lifts Ken KM 921 N Venetian ray Miami, Ronda 33739 INT WM as ul.11.1c PLOT 120 Contractor to abnin on w. utility cban oru prior to pile drtvhp. cIU: 1-800-432-4220 �+" v ftx X 4' Mkt 20' 20' 9° 45 Limits of A Roiling (2) Existing Concrete Pies To Remain 27. . Jl .11 2 12' Framing PIan (West Pier) Scale 1/4'= Section A -A (6) New 12 x12 Concrete Nos, Driven to 10 Ton Beo ing Capacity rB 1I' 9' 12x12 Concrete Dock Pies To Be Cut Deb, Deck 1. L'e ixl grated decking with 3//' spacing with (1) SS Wood Screw per sfdigex. 2. 2x10 stringers 0 16' moo spoing. 2x8 aubstringer wih (2) x 6 Wedge M hors 0 plies 4. Hurricane strop. Simpson Stromclie f15.38.1 HTS16 (CaAaniled) 5. 4x10 drop hanger with (2) i r 8 wedge anchors into existing seawall, mina embed/rent = 4' 6 2x8 subsfrirger with (2) 1 x Slag bolts into drop hanger. RECEIVED JUN222010 4' an Hen Soot Litt Swift Pile 12x12 Cuxxete Dock Pile To Be Cut' Below Dear Section B-B Dock/Boat lifts Ken Hit 921 N Yanelmn Yay Womi Beach, Fbn'do MIX I °"' DAY nvanr Contractor to cabin oo Ma Wilily clearance afroa o Prior to pile drMig. calk 1-800-4i2-4770 - All 7 Submitted into the public record in connection with item PZ.3 on 06-24-10 Priscilla A. Thompson City Clerk X 11'-2" Lim& of Rod'ng n 6 "rV —141 11' 2' 45' A 5 20' tl 11' 2' Framing Plan (East Pier, Drop Hanger Detail , B M II Section A —A (14 New 12'x12 Concrete Pde4 Driven to 10 Ton Bearing Capacity --6" 4' 1. pe 1x1 prated decking with J/L' spacing with (1) SS. Wood Screw per stdrger. 2. 200 stringers 0 16' max spaing. 3. 2x8 substringer rich (2)1 x 6 Wedge Anchors 0 pies. 4. Hurricmm strap Simpson Sbohg-Tie F1538.1 H7S16 (Galvanized) 5. 4x10 drop hangs with (2) i x 6 wedge anchors into existing seorol6, mirt. embedment = 4" 6. 2r8 sabsfrkger wfth (2) 1 x fl lag bogs into drop hanger. JUN222010 • DERrA Coastal Resources Section Natural Resources Regulation & Restoration • Division (NRRRD) Section B—B DERM CO T SECT NF A P AM DATE 12x12 Concrete Dock Pies To Be Cut Below kck Dock/Boat Lifts Kea Hal 921 W venetian lby Mani Beech, Florida 33139 Contractor to obbin utility clearance prior to pile drlrig call: 1--80O-432-4770 RAN L.r.a oe lelle Stlefteeetal Ile • See Framing Plan See Framing Plan -Nat Plor) For (East Pier) For - Dela& Details • 11.6-166 r • I I 11 VI 11 II J' 6 4' 1r 25' 4' Framing Plan (Marginal Dock) sc.(. r-o- Existing Pa Deck To Remain Framed Step resting Seawall, Cop and Rip Rap To Remain Note: Existing Rip Rap Badders To Be Removed By Hand br Installation of New Dock Piles and Then Placed Amund New Piles Mar Mediation. PERM CCM PRELI NAMk PAT 3-11 14.11.W. Kyp._ j_ MLR. -al NOVO tier Ire.? Concrete Rea, Bolen to 10 Ton Bearing f:apacRy Dock Section (Marginal) Scale 1/4"=. 1 '-0" RECEIVED JUN 2 2 2010 DERM Coastal Resources Natural Resources Rega!atio& & Res, 1.1fa Divisnr (NRRRD) Dock/Boat lifts Ken WI 921 N $iene6on Way card Brock flod* 33139 Contractor to obaln utility oh:krona prior to pile drWng. call: 1-800-432-4770 DE .2.1401 IT OM Pa 112t-11•••11. The construction of the 1pe grate is as follows: A 1. slot with o ' open space 0.75°/1.75=0,429=43%. Existing Pod Deck To Remain r_ 0 }0. See Wood Rm7 Detail 15" 2x6 Box Framed Step Existing Seawall. Cap and Rip Rap To Remain =5" 10'-5' 12' 1. tpe ix1 grated decking with 3/4'spacing IPA (1) S.S. Wood Sorer per stringer. 2. 2x10 stagers 0 16' mar spacing. 3. 2'7 substrirger with (2) 1 x 8 Wedge Anchors 0 piles. 4. Hurricane strop Simpson Strong -Tie F15.38. I HTS16 (Galvanized) 5. 4x10 drop hanger with (2) 1 x 8 wedge anchors into existing seawall, min. embednwrt - 4' 6. 2x8 subsfringer with (2) 1 x 8 log baits into drop hunger. Dock Section (West Pier, JUN222010 DL'RM Coaslai Resources Sec on Natural Resources Reg_leton 8 (NRRR, .Re ,oration Dims,m 5'-1' MLW. -d.1 ------------- hew 12.02 Canaete Pies, Driven to 10 Tin Bevhg capocfty Dock/Boat Lifts Ken tat " cv 92I N Venetian Way a,w Mani Beach, !bride 33139 nun Contrxtar to obtain as b utdty cleo+ones 112'-""'a prior to plte dri ' coil: t-800-432-4iio ° AD The construction of the toe grate is as follows: A 1" slot with o r open space 0.7571.75=0.429=43X. Ecistug Pool Deck To Remain 10' 10' 15' 2x6 Box Framed Step Existing Seawall cap and Rip Rop To Remain 25' JUN 2 2 2010 Naturlajes R,so ola�rces S'ction Divrs�on tNft(pRa $ Resro <tion ��Ci.s�E+F3`G�N 1. (ye ir1 grated decking with J/4' spacing with (1) S.S. Wood straw per stringer. 2. 240 stringers 0 16' max spacing. 3. 2x8 au sbwger with (2) j x 6 Wedge Anchor 1 r-2' 11'2 11'-2' 6 4. Rurricorie strap Simpson strong -Tie F1538.1 1{rSI6 (Go&mired) 5. 4x10 drop hanger with (2) 1 x 8 wedge anchors into existing seawa% min. embedment = 4' 6. 2x8 substringer with (2) i x 8 log bolts into drop hunger. YLw. -0.1 1VLY0 Dock Section (East Pier) Pee 12 e12 Concrete Res, LFhen to 10 Tin Dewing Capacity Dock/Boat Lifts Ken 1A 921 N Venetian May Worn( Beach, Florida 33139 Contractor to Wain uhTity clearance prior to pile drivel . calk -1-800-432-4770 ewn WRRT we: MHO f.s lianuerm 11•1101VM111%11AlnilISIMIFIN•"" 1.11111 leMdinin FI, ilirl i Section man inimm W•Mr. 1 t.11111111111111110... 112 ; 40,000 Us Capcoly Plan View Section Section "X-X" 40.000 the Capacity 17' (outside to outside) [6' (MS) RECFP JUN 22 2010 DE RM Coas.a, R,,curces Natural Reso_urr,viess,oegQlatiol isorniD0:21:achi /NIL veneuan,Oriomaalat 1.1::39 UR 11.14/0 Rr UM Pa utiliqo clearance c:17.7n. rtIrde_800totorpa.2.43todff2o_47:;: 121-19=1•F MIN 7 D tion sloration Elm NI1 _ 19' (nts) Elevation View 40,000 Lie Capacily AO A AL Dock/Boat Lifts Ken rom 921 N *NOW/ RV kiami Beach, nod* 33139 Contractor to obtain Wilily clearance prior to pile drivisE cog; 1 —WO-432-1770 ILMO, ft07 ao Ido. IA 8 -IM_1111N/0(.f/)1 11, Section MX—X" 24,000 16s Col oaly 16' (outside to outside) MOW ME■ MatWYYMII�'V: on 'oration Dock/Boat lifts Ken Nilf 92f N Venetian lay Waal Beach. none) 33139 Al fsi4al Pier 41 Contractor to obtain ova a. utility cleoronco prior to pile dridagg. coil: 1-000-432-4770 mialeal I, 0 / /IINNELIN WIN/ IN NMI_ 9' (rtts) 5' Elevation View 40,C00 L1 Capacity A h,1 " EiVED JUN 2 2 2010 S.":cUon Restoratio Dock/Boat Lifts 0511 1 OM NATI Ken HN DAII 921 N Vatefklfl Say littell Mani Beach, Florida JJ139 rim a Contractor to obtain tuti N. utility d'art/Me UP-itemq pflOr to pile driving, call: 1-800-432-4770 mom In ID PIE DRMhG NOTES E) Pb driving operations she, be observed by a specie, inspector, including test piles auffderd to determine the approximate length required la meet design capacity. 2) Pries shall be driven using on oppro ed cushion block mnsiltiig of material St) arronged so as to provide the transmission of the hammer energy. 3) Pies shot be driven to requied capacity a mkumum of 12 feet into born. 4) Plies shall be driron with a drop hammer or gravity hammer provided the hammer shot weigh rio less Man J000 pounds and The fall of the hammer shop not exceed six feet. 5) Ples shop be dAnen nits a variation d not more than f/4 inch per foot horn the ver6cat or from the batter Fine indicated, with a maahmrm variation of the head of the pile from the position shown on the pions of not more Man three inches. 8) Mere ping must penetrate strata offering high resistance to . a(hirg, the structural engineer of record or special inspector rnoy require that the piles be set in pre--dndkd or punched hales. The pies shod rwoch their Foal penetration by drhig. 1 CONCF1E7E PIE NOTE 1) Prestressed concrete 7/161, strands, fc= 12x12wdh(4)bhar , kni21h 20 STRUCTURAL RAWER NOTES 1) Southern Pin Soout framing dnae be 2 (rode, pressure treated GENERAL MOTES 1) Construction to folio, Florio 8utd g Cade 2007 edition and amendments as app!cobk and all Lncol, State, and Federal lows. 2) Licensed Contractor shod reify the existing conditions prior to cammencemerd of the work Are, conflicts or 'omissions between existing aonditkns or the wrioua elements of the working drawings shot be brought to the attention of the Engineer prior b the commencement of the work The licensed Contractor and el sub— contractors are responside for all lines, *Mims, and measurements in connection with their work 3) Do not scale drawings for dimensions. 4) Any deviation and/or substitution from the W npation provded heroin shah be =Mulled to the Erne, for their approval price to commencement of work 5) M unotkgnated or unforeseen demoM1Tion and/or new construction concptkvn9 which require deviation horn the plans and notes herein shad be reported to the Engineer prior to commencement of wart. 6) Ali new work and/or materials shot conform to at requirements of each administrative body having /trisection in each pertaining dravmteace. 7) At new materials and/or patchwork shad be provided to match existing malenab and/or oddoniing work where practical except as • Epee** noted herein. 8) Licensed Contactor to drop use all possible core to protect at etching materiah, surfaces, and hunk Nags from damage duig as phases of construction. • 9) licensed Contractor 10 verify location of existing ublitks prior to commencing work 10) The Licensed contractor to install and remove at shoring and bracing as requied far the proper execution of Um work. 11) licensed Contractor to obtain all permits as necessary form ot last Slate, and Fedora agencies 2x6 top roil n)h (2) /12 x 3' strews 0 eoch post at each joist 2x8 Side Rai To 4x4 Post .4ih (3) /8 SS Screws (2) 4x4 RolAPorf° Post 8' kneel Note; Al mafcviok to be pressure treated pine. (unless otherwise noted). Al frame work materials to be grade f2. Ali Deckbi materials to be grade /f. (urilass oller,in noted). As hordware to be Stainless Sleet (unless otherwise noted). Design In acoordonce m'M 2007 edition of the Florida BOON Code (2009 supplement). Devotions shown hereon am based on the Notional Geodetic Vertical Datum of 1929. Approved cantroctar to determine the sritobihly of existing ures and all dimensions, the approved troclor iresponsible for al methods, moonk sequencesaol procedre of wok tl WOOD RAIL DETAIL 42' ram Center Lore CY Pile a11 1202 Concrete Dock tiles To Be Cut Below Deck 5/8e Bolt lik9MC JUN212010 DERM Ccaslat (?:::-ounce: EsxtOn Natural Resources Reg,iaa 1 Restoration Divisor. Dock/Boat lifts Ken FM 921 N Venetian Pay Lpam Stock, Florida 33139 a} "' NW aeons PLOT Contractor to obtain ewe iK Wally cieorana prior to drrvkp cal—800-432-4770 11a