Loading...
HomeMy WebLinkAboutExhibitCITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM Arthur Noriega V, DATE: May 30, 2024 City Manager Annie Perez, CPPO SUBJECT: Recommendation for Award of a Director/Chief Procurement Officer Construction Contract for South Bayshore Department of Procurement Lane/Fairview Pump Station - Project No. B-30737 REFERENCES: Invitation to Bid ("ITB") No. 23- 24-008 ENCLOSURES: Bid Security List, Contractor's Price Proposal RECOMMENDATION: Based on the findings below, the City of Miami ("City") Department of Procurement ("Procurement") hereby recommends that the referenced contract be awarded to Ric -Man International, Inc. ("RMI"), who has been deemed the lowest responsive and responsible Bidder for ITB No. 23-24-008, South Bayshore Lane/Fairview Pump Station - Project No. 30737 ("Project"). BACKGROUND: On November 30, 2023, Procurement issued an ITB solicitation through the Periscope (BidSync) System under full and open competition to obtain bids from qualified firms. On January 10, 2024, Procurement received two (2) bids in response to the solicitation (see attached Bid Security List). Pursuant to the solicitation, Bidders were required to have 1) a current Certified General Contractor ("CGC") license from the State of Florida AND have a current Florida Water Well Contractor License OR have a subcontractor with a current Florida Water Well Contractor License AND have a minimum of five (5) years' experience under its current business name; and 2) Have experience as the Prime Contractor for at least three (3) ongoing or completed pump station projects of comparable scope, scale, and complexity as the Project within the last seven (7) years; one (1) of the submitted projects must have included construction of a stormwater pump station of comparable scope, scale, and complexity and one (1) of the submitted projects must have included right-of-way ("ROW') paving and drainage. The CGC must have a proven track record of coordination with and between all applicable trades including, but not limited to, structural, mechanical, plumbing, and electrical, as it may be required during the construction of the Project; and 3) the submitted reference projects had to demonstrate that i) the CGC was the General Contractor for the project; and ii) the CGC self -performed at least thirty percent (30%) of the physical labor construction work for the project. FINDINGS: Procurement conducted a due diligence on the bids received, following the guidelines published in the solicitation. As a result of such effort, the apparent lowest bidder, RMI was deemed responsive and compliant with the minimum requirements stipulated in the "Notice to Contractors," and demonstrated the required prior experience in projects of comparable scope, scale, and complexity similar to the ones to be completed for the Project. Accordingly, RMI was deemed the lowest responsive and responsible Bidder. The City's Resilience and Public Works ("RPW") reviewed and evaluated RMI's bid and compared it with the probable construction cost estimate prepared by A.D.A. Engineering, Inc., the Engineer of Record ("EOR"). On March 1, 2024, a Best and Final Offer (BAFO) Letter was sent to RMI, and a response was received on March 4, 2024. At the Negotiation Meeting on March 21, 2024, RPW discussed with RMI PR24111 Page 2 - Recommendation of Award of ITB No. 23-24-008, South Bayshore Lane/Fairview Pump Station Arthur Noriega V, City Manager certain line items that exceeded the construction cost estimate, although the bid proffered by RMI remained unchanged. On April 16, 2024, RPW accepted RMI's bid proposal as reasonable based on current market conditions in the construction industry and recommended to award the Project to RMI, pending outcome of a Community Outreach meeting scheduled for May 16, 2024. On May 20, 2024, RPW cleared the contract award to move forward. Based on the above findings, Procurement hereby recommends that the Project be awarded to RMI as shown below: RIC-MAN INTERNATIONAL, INC. BID ITEMS SOUTH BAYSHORE LANE/FAIRVIEW PUMP STATION — PROJECT NO. B-30737 Total Lump Sum Bid $8,776,415,95 Ten Percent (10%) Owner's Contingency $877,641.60 TOTAL CONTRACT AWARD VALUE $9,654,057.55 CONTRACT EXECUTION: Accordingly, Procurement hereby requests authorization to prepare a contract with RMI upon approval by the City Commission. The contract amount is $8,776,415,95 for the Scope of Work, plus an Owner's Contingency Allowance in the amount of $877,641.60 for a total contract value of $9,654,057.55. Your signature below indicates your approval of Procurement's recommendation. Approved: Date: Arthur Noriega V, City Manager c: Natasha Colebrook -Williams, Deputy City Manager Larry Spring, CPA, Assistant City Manager/Chief Financial Officer Asael "Ace" Marrero, AIA, Assistant City Manager/Chief of Infrastructure Pablo R. Velez, Sr. Assistant City Attorney Juvenal Santana, PE, CFM, Director, RPW Fernando V. Ponassi, MA Arch., MA PPA, LEED®AP, Assistant Director, Procurement PR24111