HomeMy WebLinkAboutexhibit1AAttachment "A"
The additional scope of work required to be performed under this contract is for
furnishing all labor, equipment and materials necessary for the complete cleaning of the
stormwater infrastructure citywide adjacent to the outfall systems. The work includes the
cleaning of all pipes with a minimum of 6" to 64" interior diameter outfall pipes, cross
pipes, French drain systems, shallow inlets, manhole structures, major control structures,
etc., as directed by the City Engineer. The contractor shall also report any failure or
disruption to the existing storm water infrastructure for future repairs of the system and
annual report to the Department of Environmental Protection.