HomeMy WebLinkAboutcorrespondence-3OCT 20 2000 6:05PM MIAMI RIVER COMMISSION
305 361 4755
Policy Committee:
Governor of State of Florida
Mr. leb Bush
Designee: Dr. Famella Dana
Chair of Miami -Dade Delegation
Representative Rene Garcia
Designee: Ms. Debra Owens
Chair of Governing Board of
South Florida Water Management
District
Mr. Nicolas J. Gutierrez, Jr.
Designee: Ms. ;relit Bague
Miami -Dade State Attorney
Ms. Katherine Fernandez -Rundle
Designee: Mr. Gary Winston
Mayor of Miami -Dude County
Mayor Alex Penelas
Designee: Mr. Henry F. Sori
Mayor of Miami
Mayor Manuel A. Diaz
Designee: Mr. Otto Boudet-Murlas
City of Miami Commissioner
Commissioner Joe Sanchez
Designee: Mr. Steve Wright
Miami -Dade County
Commissioner
Commissioner Bruno Barreiro
Designee: Mr. Alfredo Gonzalez
Chair of Miami River Marine
Group
Mr. Charles "Bud" Morton
Designee: Mr. Richard Bunnell
Chair of Marine Council
Mr. Michael Karcher
Designee: Mr. Phil Everingham
Executive Director of Downtown
Development Authority
Mr. Dana A. Nottingham
Designee: tvlr. Adam Lukin
Chair of Greater Miami Chamber
of Commerce
Mr. William O. Cullom
Designee: Ms. Megan Kelly
Neighborhood Representative
Appointed by City of Miami
Commission
Dr. Ernest Martin
Designee: Mr. Michael Cox
Neighborhood Representative
Appointed by Miami -Dade
Commission
Ms. Sallye Jude
Designee: Ms. Jane Caporelli
Representative from
Environmental or Civic
Organization Appointed by the
Governor
Ms. Janet McAliley
Designee: Ms. Theo Long
Member at Large Appointed by
the Governor
Mr. Robert Parks
Member at Large Appointed by
Miami -Dade Commission
Ms. Sara Babun
Designee: Mr. Tom Parker
Member at Large Appointed by
City of Miami Commission
Mr. Cleve Jones, Jr.
Designee: Captain Beau Payne
Managing Director
Captain David Miller
Miami River Commission
c/o Rosenstiel School
4600 Rickenbacker Causeway
Miami, Florida 33149
Office: (305) 361-4850
Fax: (305) 361-4755
email: mrc@rsmas.miami.edu
October 22, 2003
Honorable Chairman Johnny L. Winton
3500 Pan American Drive
Miami, FL 33133
Re: Recommendation for Exempting the Miami River Dredging
Project and the Marine Industry from the Proposed "Noise
Ordinance"; 10/23/03 City Commission Agenda Item SR.1
Dear Chairman Winton:
This letter serves as the Miami River Commission's (MRC)
"official statement" to all City Commissioners, requested in City
Resolution 00-320, regarding October 23, 2003 City Commission
Agenda Item SR.1, which impacts the Miami River.
The MRC strongly recommends amending the proposed "Noise
Ordinance" to provide for an exemption for the Miami River Dredging
project. The proposed ordinance prohibits dredging between the hours
of 6 p.m. and 7:30 a,m. on any day of the week. Mr. David Miller,
Managing Director of the MRC, stated on the record at the first
reading of the ordinance, that this provision will negatively impact the
project. To be more specific, the Army Corps' project officer stated
this provision would double the cost of the project and most likely
make the project fiscally unfeasible. For your information, on August
29, 2003 the U.S. Army Corps of Engineers released a "Request for
Proposal" for contractors to bid on the project. The proposal allows
for dredging to occur 24 hours per day, 7 days per week. This is
standard operating procedure for all Corps dredging projects.
On October 14, 2003, MRC staff and others met with the City
Attorney and reviewed a revised "draft Noise Ordinance". The MRC
fully supports the attached draft proposal to exempt Marine Industrial
uses from the ordinance, under section 36-6 (m).
Sincerely,
Robert L. Parks,
Chair,
Miami River Commission
Cc: Honorable Mayor Manuel A. Diaz
City Manager Joe Arriola
City Clerk Priscilla Thompson
City Attorney Alex Vilarello
OCT 20 2000 6:05PM
MIAMI RIVER COMMISSION
305 361 4755
TABLE I
Use Occupancy
Time
Sound Level
(a)DBA
Category
Limit
above
(a)dBA Max
ambient
Residential
6 a.m.--10 p.m.
60
10
(Non -holiday
10 p.m.--6 a.m.
weekends)
Residential
6 a.m.--12 a.m.
60
15
(Holiday weekends)
12 a.m.--6 a.m.
Commercial or
6 a.m.--10 p.m.
70
15
Tourist
10 p.m.--6 a.m.
(Weekdays)
Commercial or
6 a.m.-12 a.m.
70
70
70
15
Tourist
12 a.m.-2 a.m.
(Weekends)
2 a.m.--6 a.m.
Manufacturing
At all times --no sound that is
.
generated by a source facility
shall be audible at the
property line of the said
source facility.
Sec. 36-6.
Exemptions.
The following uses and activities shall be exempt
from noise level regulations in this Chapter:
(a) Air
equipment is
manufacturer's
manufacturer's
conditioners are
functioning in
specifications
standard mufflers
exempt when this
accord with the
and with all
and noise -reducing
equipment in use and in proper operating condition
according to standards promulgated by the American
Refrigeration Institute. The same exception shall
apply to lawn mowers, agricultural equipment and
homeowners' mechanized tools during daylight hours
(between sunrise and sundown).
(b) Nonamplified crowd noises.
Page 12 of 16
OCT 20 2000 6:05PM
MIAMI RIVER COMMISSION
305 361 4755
(c) Construction operations for which building
permits have been issued, or construction operations
not requiring permits due to ownership of the project
by an agency of government; providing all equipment is
operated in accord with the manufacturers'
specifications and with all standard equipment,
manufacturers' mufflers and noise -reducing equipment
in use and in proper operating condition; and
providing construction operations are limited to the
hours and in accordance with the requirements set
forth in Sections 10-6, 10-7 and 36-8 of this code.
(d)
emergency
of churche
(e)
emergency
or acting
Noises of safety signals,
pressure relief valves and
s.
Noises resulting from
vehicle when responding to
in time of emergency.
warning devices,
bells and chimes
any authorized
an emergency call
(f) Noises resulting from emergency work as
defined in section 10-6(a) of this code.
(g) Any other noise resulting from activities of
a temporary duration permitted by law and for which a
license or permit therefore has been granted by the
City. Regulation of noises emanating from operations
under permit shall be according to the conditions and
limits stated on the permit.
(h) Noises made by persons having obtained a
permit to use the streets.
(i) All noises coming from the normal operations
of aircraft (not including scale model aircraft).
(j) Those motor vehicles controlled by Florida
Statutes, Section 316.293, but not those motor
vehicles exempted from coverage.
(k) Vessels operated on the waters of the city
muffled pursuant to Section 327.65, Florida Statutes.
Page 13 of 16
OCT 20 2000 6:05PM
MIRMI RIVER COMMISSION
305 361 4755
(1) Activities and events held in or upon any
City -owned facility or City -owned property.
(m) Marine Industrial use specifically permitted
by law.
Sec. 36-7. Violations enforcement and penalties.
Enforcement of violation of this section shall at
the City's option be performed by police and
punishable as a crime (third degree misdemeanor) as
provided for in Section 1-13 of this Code and/or as a
civil infraction in accordance with the City's Civil
Infraction Enforcement Procedures set forth in Section
2-823 through 2-829 of this code. Ae set forth in the
City's Schedule of Civil Penalties, Section 2-829 of
this Code, a fine of $100 shall be imposed for the
first violation of any provision of this section;
$250.00 for the second violation; and $500.00 for the
third violation and each violation thereafter. Each
24-hour day is to be considered a separate violation.
Sec. 36-8. Construction noise - Prohibitions and
limitations.
(a) Prohibitions. Construction, alteration or
general repair of any building, structure or other
item for which a permit to construct, alter or repair
is required by ordinance of the City including but not
limited to persons and vehicles shall be prohibited at
all times other than that permitted in Section 10-6 of
this code. 'No tools, equipment or vehicles, of any
kind, used in construction, dredging, land filling or
demolition work shall be used, brought to the site or
taken from the site before or after the times
permitted in Section 10-6 of this code. If the tools,
equipment or vehicles, of any kind, used in
construction, dredging, land filling or demolition
work are left on -site then their use and operation is
prohibited' except during the times permitted by
Section 10-6 of this code. Additionally, a Certificate
is required for the construction of any principal
building/structure pursuant to Section 10-7 of this
code.
Sec. 36-9. Additional remedies.
Page 14 of 16