AWARD SHEET
BID NO, 04.05.116
GROUNDS MAINTENANCE SERVICES - CITYWIDE
(REVISED • 2/19/08)
Prices include all labor, supervision, transportation, equipment,
supplies and oUwr products to provide all work In aecorde se
with Specifications.
Locations:
Monthly Cos l Extended Amount
GROUP 1: Miami Riverside Center
Traci 1
Tract 2
Traci 3
$410,00 /mo
$480.00 imp
$480.00/Fro
TOTAL FOR GROUP 1:
Vendor
Sanchez Mango Construction •
8651 NW 70 St.
$4,920.00 Miami, FL 3316E
$5,520.00 Dade/Hispanic
$5.520.00
$15,960.00
GROUP 2: POLICE DEPARTMENT
HEADQUARTERS AND SUBSTATIONS
Locations: Monthly Cost
Headquarters - Central District
a. Inside the Building Perimeter and Parking Garage $425.00 /mo
b. Under 1-95 Between NW 4m Street and NW Bill Street
c. `Dust Bowl- and outside perimeter
North District & Perimeter
South Disidci & Perimeter
David Herring Center & Perimeter
Police S.O.S. Substation & Perimeter 1701 NW 30 Ave.
a. Initial Blitz of Grounds (One Time Only)
$360.00 /mo
$400.00 Imo
Extended Amount
$5,100.00 /yr
$9,320.00 1yr
$4,800.00 /yr
TOTAL HEADQUARTERS
COST; $14,220.00 /yr
$450,00 Imo
$360.00 /mo
$360.00 /mo
$5,400.00 /yr
$4,320.00 /yr
$4,320.00 /yr
$937.50 /mo $11,250.00
$1,920,00 $1,920.00
TOTAL FOR GROUP 2: $41,430.00 /yr
GROUP 3: FIRE DEPARTMENT
HEADQUARTERS, DISTRICT CENTERS AND
FIRE STATIONS:
Locations:
Fire Station 62, 1901 N. Miami Ave.
2 Fire Station 63, 1103 NW 7th St. (including Shop/Credit Union)
3 Fire Station 114, 1105 SW 2i° Ave.
4 Fire Station 65, 1200 NW 2d" St.
5 Fire Station 66, 701 NW 36 St.
6 Fire Station 67, 314 Beacon Blvd.
7 Fire Station #8. 2075 Oak Ave.
8 Fire Station 60, B9 NE 62 St,
9 Fire Station 610 and Parking Lot, 4101 NW 1" St.
10 Fire Station II 11, 5920 W. Hagler SL
11 Fire Station #12, 14" St. NW 46 St.
12 Fire Station #13, 185 NE 82' Terrace
13 Fire Station#14, 2114 SW 191h Terrace
14 Fire College, 3425 Jefferson Street
Monthly Cost ?mended Amount
$120.00 into $1,440.00 /yr
$120.00/mo
8120.00 Imo
$120.00 /mo
$120.00 /nra
$120.00 Imo
$120.00 into
$160.00 /mo
$120.00 /m0
$120,00/mo
$120.00/mo
$120.00 /mo
$120.00 /mo
$230.00 /mo
$1,440.00 /yr
$1,440.00 /yr
$1,440.00 /yr
$1,440.00 /yr
$1,440.00 /yr
$1,440.00 /yr
$1,920.00 /yr
$1,440.00 /yr
$1,440.00 /yr
$1,440.00 /yr
$1,440.00 /yr
$1,440.00 /yr
$2.780.00 /yr
TOTAL FOR GROUP 3: $21,980.00 /yr
(REVISED • 9/29/06)
EFFECTIVE • 10/01/2006
Vendor
Sanchez Mango Construction
8651 NW70 St.
Miami, FL 33186
Dade/Hispanic
(REVISED • 9/14/06)
EFFECTIVE • 10/01/2006
(REVISED • 2/19/08)
Vendor
Sanchez Mango Construction
8651 NW 70 St.
Miami, FL 33166
DadeMisparc
Prepared By:
Terry Byrnes, CPPB
4/14/06
Item
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
AWARD SHEET
BID NO. 04-05-116
GROUNDS MAINTENANCE SERVICES - CITYWIDE
(REVISED - 2/19/08)
Prices include all labor, supervision, transportation, equipment,
supplies and other products to provide all work In accordance
with Spectficelions.
GROUP 4: PARKS AND RECREATION
Locations:
Belle Meade, NE 6" AveJ77'" St.
Jackson House, 190 SE 12" Torr.
Little River Comm., 181-85 NE ed" Ten.
Patel (Magnolia), NW 6AveJ3839" St.
Stems, NW Est of Turtle Cswy.
Southside", 100 SW 11" St.
East Bay Vista, NW 6" Avel47-48" St.
North Bay Vista. NW 6 Ave./4849" St.
Pullman Mini, NW 49' StJ1 N. Miami Ave.
Simenhoff • 54th St., NW 54' St./18-1d" Ave.
West Buena Vista, NW 45" S1111
12th Ave. Mini, NW 12' AveJ62n° St.
South Bay Vista. NW 6 Ave./46 8 47" St.
Miami Riverwalk, NE 2n4 Ave./Brickell Bridge
Miami Rivedront Dev. , 234 SW North River Dr.
Martell, NW 310 AveJ7'° Ave.
Second Ave. Mini'. NW 2i° AveJ10-11' St.
Towne", NW 4" AveJ17° St. at 1-95
Flagami, 7121 SW 3i° St.
Flagler Terrace, SW 56 AveJ31O St.
Grove Circle. NW So. River DrJ15" Ave.
Blanche", Virginia 8 Mary St.
Coconut Grove Mini', Grand Ave./Elizabeth
Coconut Grove Tennis Cl Approz. 2975 Oak Ave.
Serer Blur, 2901 SW 22n0 Ave.
Triangle", SW 15" Rd. 8 11' St
Higtdand Circle Mini, NW 8' Ave./13' St.
Melrose". NW 3e St./25" Ave.
Range #1", NW 4'" Ave./10-11' StJI-95
Rainbow Village', NW 4' CIJ21" St.
Grove Mini, NW 8" StJ1510 17" Ave
Riverside ", SW 8th AveJ3rd SL
Buena Vista ". 5250 NW 2nd Ave.
Henderson', NW 9th AveJ2 St.
City Cemetery, 1800 NE 2nd Ave.
Baywood. NE 71 Stilth PL.
(') 7 - Day per week service
(") 2 - Day per week service
Monthly Cost Extended Amount
$120.00 Imo $1,440.00 /yr
$77.00 /nro $924.00 /yr
$90.00 /mo $1,080.00 /yr
$165.00 /mo $1,980.00 /yr
$135.00 /mo $1,620.00 /yr
$200.00 /mo $2,400.00 /yr
$135.00 /mo $1,620.00 /yr
$135.00 /mo $1,620.00 /yr
$105.00 /mo $1,280.00 /yr
$155.00/mo $1,860.00/yr
$155.00 /mo $1,860.00 /yr
$200.00 /mo $2,400.00 /yr
$90.00 /mo 81,080.00 /yr
$155.00/mo $1,860.00/yr
$155.00 /mo $1,860.00 /yr
$240.00 Imo $2,880.00 /yr
$200.00 /mo $2,400.00 /yr
$90.00 /mo $1,080.00 /yr
S135.00 /mo $1,620.00 /yr
$155.00 /mo $1.860.00 /yr
$90.00/mo $1,080.00/yr
$185.00 /mo $2.220.00 /yr
$260.00 /mo $3,120.00 /yr
S230.00 /mo $2,760.00 /yr
$185.00 /mo $2,220.00 /yr
$185.00 /mo $2,220.00 /yr
$90.00 /mo $1,080.00 /yr
$430.00 /mo 85,160.00 /yr
$185.00 /mo $2,220.0p /yr
$185.00 /mo $2.220.00 /yr
$155.00 Into $1,860.00 /yr
$135.00 Into 81.620.00 yr
$245.00 /mo $2,940.00 /yr
$245.00 /mo $2,940.00 /yr
$510.00 Imo $6,120.00 /yr
$400.00 /mo $4,800.00 /yr
TOTAL FOR GROUP 4: 79 284A0 /yr
Prepared By
Terry Byrnes. CPPB
4/14/06
I
2
Vendor
Sanchez Arango Construction
8651 NW 70 St.
Miami, FL 33166
Dade/Hispanic
Item
1
2
3
Item
AWARD SHEET
BID NO.04.05.116
GROUNDS MAINTENANCE SERVICES - CITYWIDE
(REVISED • 2/19/0C
Priors include all labor, supervision, transportation, equipment,
supplies and other products to provide all work In accordance
with Specifications.
GROUP 5: PUBLIC FACILITIES
Locations: Monthly Cost Extended Amount
Coconut Grove Exhibition Center - 51,725.00 /mo $20,700.00 /yr
Dinner Key Marina $705.00 /mo 58,460.00 /yr
Orange Bowl Stadium
$800.00 •
• For evaluation purposes only
$11,200.00 /yr
TOTAL FOR GROUP 5: 40 360.00 /yr
NEW ADDITION: POLICE DEPARTMENT
MOUNTED STABLES (LOOMIS PARK)
Locations:
1 MOUNTED STABLES
Monthly Cost Extended Amount
$514.00/mo $6,168.00 /yr
•
Vendor
Vendor
Sanchez Arango Construction
8651 NW 70 St.
Miami, FL 33186
DadeMtspanic
Vendor
Weed-A•Way, Inc.
18520 NW 67 Ave.
Miami, FL 33015
Dade/Female
(REVISED - 9/29/06)
EFFECTIVE - 10/01/2006
Prepared By:
Terry Byrnes, CPPB
4/14/06
3