Loading...
HomeMy WebLinkAboutNarrativeWork Program Tarpun Bay USA 4400 NW 2"d Avenue Miami, Florida 33137 Philip Ingraham, President Narrative • The Work Program is for major capital improvements to the building located at 4400 NW 2"d Avenue, where the Tarpun Bay Restaurant will be located. • The City of Miami is providing Community Development Block Grant funds (CDBG) in the amount of $90,000 for equipment and furnishings. Tarpun Bay is providing 36% in matchings funds for a total of $34,616. Tarpun Bay's contribution will be used for interior renovations, repairs and to upgrade and improve the building so it will be a state of the arts professional kitchen and restaurant. • The owner of the restaurant is using his real estate holdings to develop the concept of a Bahamian Connection Village to connect Tarpun Bay Restaurant to the family owned restaurant, Bahamian Connection which is located beside Tarpun Bay. The restaurant will provide a fine dining experience with Bahamian Cuisine and live entertainment. A pathway and canopy will connect the two restaurants together and provide a Terrace and outdoor seating . The Terrace will have a Barbeque / Jerk Pit, Daiquiri Bar, Stage and Tiki Huts. The restaurant will also promote fine artists by showcasing their art on the walls in the restaurant. The art connection is a natural extension to the Design District and Wynwood Art District and will attract patrons who frequent these neighborhoods because of its close proximity. • Regular outdoor events will be held outside on the Terrace to attract customers and generate additional income . Reggae, Calypso and Jazz bands will be contracted to create a following. • Happy Hour with drink and menu specials will be featured to attract people going home from work. • The adjacent Bahamian Connection Restaurant will be used primarily as a Banquet hall for .rivate functions. Phi 'ip Ing • ha , Pre nt,Tarpun BayUSA,Inc. 2 26, Date Tarpun Bay USA Time of Completion • 10/13/ 2006 completed, Miami Dade County, Dept. of Environmental Resources Management, Plan Review/ Derm, Sewer Connection Approval $320. • 11/ 16/ 2006 completed, Miami -Dade Water and Sewer Dept. Existing Sewer and Existing Water Verification Forms, $150. • 12/12/2006 completed, Burton, Design and Development design, development and drawings, $1,600. • 1/18/ 2007 completed, State of Florida, Dept. of Business and Professional Regulation, Division of Hotels and Restaurants Plan Review Application, $150. • 4/26/07 completed, Miami Times Advertisement, $443.20. • 1/24/08 completed, City of Miami, Tarpun Bay Advertisement, $5,440. • 3 / 31/08, Submit to City of Miami, Department of Community Development, Request for Approval of Equipment/furnishings to be procured with CDBG Funds Purchase of equipment will commence upon approval of request. • 3/31/08 to be completed, electrical work and final permit inspection, $500. • 4/4/08 to be completed, door installation and final inspection of door, $2,500. • 4/30/08 to be completed, tile installation, $5,000. • 5/30/ 08 to be completed, interior painting, $3,000. • 6/13/ 08 to be completed, Certificate of Occupancy • 7/7/08 to by completed, installation of all equipment/ furnishings provided with CDBG Fu ds (see Attachment 1), $84,560. Phtpi . I grahm, resident, TarpunBay USA, Inc. Z� zg .og Date Tarpun Bay Work Program Specifications include the following: • Design/ Development and drawings were developed by Burton Design and Development. • Tarpun Bay shall complete all construction and install all equipment by 7/ 7/ 08 • Work completed or to be completed includes electrical, sheet rock installation, engineering, secure permits, environmental (DERM),water and sewer, Business and Professional Regulation Plan Review, Survey /Elevation Certification, toilet installation, door installation, tile installation and paint interior. • Submit to City of Miami, Department of Community Development, Request for Approval of Equipment/ furnishings to be procured with CDBG Funds. Purchase of equipment will commence upon approval of request. • Purchase equipment and furnishings with City of Miami CDBG funds. Total budget for equipment and furnishings is $84,560. D2 - 6d ► P fillip I , grah. P ( '• ent, Tarpun Bay USA, Inc. Date