HomeMy WebLinkAboutExhibit 2ci±t .ITE FtM1Zit
June 11, 2008
City of Miami
Department of Off -Street Parking
190 NE Third Street
Miami, FL•33132
Dear Ladies and Gentlemen:
PEDRO G. HERNANDEZ, P.E.
City Manager
ee-y46if
CANNER (THIRD RESUBMITTAL)
TENTATIVE PLAT # 1583-C
LOCATED AT THE NORTHWEST CORNER OF
NORTH MIAMI AVENUE AND N.W. 2 STREET
The City of Miami Plat and Street -Committee, at its meeting of June 5, 2008, approved7
the above tentative plat subject to the following revisions being made to the tentative
plat, additional information being provided and/or variances being granted. Please be
advised that the processing of your tentative plat cannot proceed until these conditions
have been satisfied;
1. Provide an Opinion of Title for the remnant portion of Lots 1 and 2 at the time of
final plat submittal. •
2. Verify if there are any utilities in ttie portion of the alley to be closed and vacated. If there are utilities, they must be relocated or an easement must be provided.
3. An updated Opinion of Title will be required at the time .of final plat submittal.
4. A copy of the alley closure resolution must be provided to the Public Works
Department.. Verify with the -Zoning Board that an Exhibit "A'. is attached to the
resolution.
5. All property 'owners abutting the alley between the two streets shall join in the
plat abandoning and disclaiming all rights, title, and interest in the portion of the
alley closed.
6. An Opinion of Title in the City of Miami Opinion of Title form must be provided at
the time of final plat submittal.
7. All encroachments across lot lines must be removed prior to the final plat.
8. Be advised that backup documentation will be required for all who execute the
final plat.
9. An Opinion of Title for the Right -of -Way to be closed and vacated will be required
by the Zoning Board. This Opinion of Title must also address whether or. not
there are individuals, in_the addition to the abutting property owners, having an
interest in the Right -of -Way to be closed and vacated. A copy of the Opinion of
Title must be provided to the Public Works Department.
10. A sketch and legal description, with a square footage, on an 81/ X 11".paper, for
the proposed closure will be required by the Zoning Board. Contact Teresita
CANNER (THIRD RESUBMITTAL)
TENTATIVE PLAT # 1583-C
June 11, 2008
Page 2 of 3
Fernandez, Chief of the Hearing Boards, at (305) 416-2030. Provide a copy to
the Department of Public Works,
11. Show the fire access easement on the final plat as agreed in the May 17, 2005
letter prepared by the Miami Parking Authority.
12. Be advised.that an incomplete final plat package will not be accepted .by the City .
of Miami. It is the Owner's responsibility to work with his/ her attorney and
surveyorto ensure that everything is in order before submitting the final plat
package.
13. The Plat and Street Committee has reviewed the tentative plat of "Canner" and
determined that all technical requirements contained in the Miami City Code
Subdivision Regulations have been met and has approved the tentative plat. The
members' of the Plat and .Street Committee have further considered .the request
for• vacation and .closure of the alley and easement with respect to Miami. City
Code requirements and have voted 7 in favor and 0 in denial of his vacation and
closure request. 0
14. A letter from Cor tcast is required to determine if any adjustments to their facilities
or easements are required. -
15. Be advised that if -all the requirements for scheduling the' final plat for City
Commission action are not in order, the final plat will not be scheduled for a City
Commission meeting.. 0
In addition to the above requirements, you should be aware of the following:
1 _ State and local laws require the installation of various physical improvements
in the public rights -of -way when property is platted. These subdivision
improvements include paving, drainage, landscaping, sidewalks, etc. In some
cases this could represent a substantial investment on your part. .OPTION:
The submission ofan electronic copy of the tentative plat, in an AutoCAD
version, to the City, of Miami Public Works Development and Roadway Plans
Section will EXPEDITE the preparation and enhance the ACCURACY of the
subdivision improvement estimate letter required for final plat approval.
2. The alteration, relocation or installation of utilities such as storm and sanitary
sewers, electric, telephone, water, etc., caused by this plat will be at the
property owner's expense. Also,. utility easements may be required on the
property being platted.
3. A building permit will not be issued on the property being platted until the
final plat is recorded or as authorized by City of Miami Code Section 55-10
(h). Also, the Certificate of Occupancy for any building construction • will be
issued only after all the required subdivision improvements have been
completed.
4. Approval for fire flow requirements must be obtained from the Fire -Rescue
Department prior to the issuance of a building permit.
5. Additional items must be provided to the City of Miami Department of Public
Works before the final plat is submitted to the City Commission for approvat.
CANNER (THIRD RESUBMITTAL)
TENTATIVE PLAT # 1583-C
June 11, 2008
Page 3 of 3
You will be notified in writing as to what these items are after the amount of
the bond has been determined for the necessary subdivision improvements.
6. Tentative plat approval is only valid for two (2) years' from the date of the Plat
and Street Committee meeting at .which time is was approved.
If you have any questions concerning these requirements, please refer to the attached
sheet for the appropriate person to contact.
Sincerely,
Stephanie N. Grindell, P.E.
Chairman, Plat and Street Committee
S NG/LJHldb
014cs.
Enlosure: Contact Sheet
C: F.R. Alernan 8 Assoc., Inc.
10305 NW 41 Street
Miami; FL 33178
Plat and Street Committee Members
Surveys
Development and Roadway Plans