HomeMy WebLinkAboutSubmittal-PowerPoint Presentation-SasakiCOCONUT GROVE WATERFRONT MASTER PLAN
SASAKI ERA/ Curtis Rogers / ConsulTech / Paul George Ph.D.
J U LY 2008
• Strengthen connection
between Center Grove and
waterfront
• Concentrate waterfront uses
• Transform underutilized parks
and surface parking lots
• Create spaces for boating and
non -boating community
• Enhance identity as world class
sailing destination
Ln
0
0
N
O
O
N
0
0
Kick -Off and Open House
Stakeholder Input
• Waterfront Activities
• Residential Community
• Business Community
• Staff Meeting including CGWWC
• Walking Tour
• Residential Community - Expo Center
• Business Improvement Committee - City Hall
• Hoteliers
• Village West and South Grove - Frank Rolle Center
• North Grove Residents - Science Museum
Community Presentation and Feedback (Dots Exercise)
Alternatives Presentation
• Community Meeting
• Presentation to WAB
• Meeting with CGSC
Meeting/Conference Calls
• Sailing Activities
• Shakespeare in the Park
• Hoteliers
• Business Improvement Committee
• Dinner Key Tenants
• Condo Owners Meeting at Grove Hill Condominium
Draft Final Plan Presentation
• Open House
• Waterfront Advisory Board
Draft Final Plan Presentation to PAB
Draft Final Plan Presentation to WAB
O
O
N
SEPTEMBER
Stakeholder Meetings
• Coconut Grove Sailing Club
• US Sailing Center
• DERM
• Marine Council
• Village Council's Waterfront Working Committee
• City Depts: Public Facilities, Parks & Rec, Grants
OCTOBER
Draft Final Plan Update to the Waterfront Advisory
Board (City Planning)
JANUARY
'Meeting/Conference Call
• Coconut Grove Sailing Club
US Sailing Center
FEBRUARY
"Meeting/Conference Call w/Public Facilities
rvleeting/Conference Call w/Public Facilities re:
Dockmaster Facility
IA, MAY
Meeting with Regulatory Agencies
• Army Corps of Engineers
• Miami Dept of Public Works
Biscayne Bay Aquatic Preserve
• Florida Dept of Environmental Protection
DERM
Meeting with US Olympic Sailing Center / Tour of
facility with Executive Director Pat Downey
ommissioner Sarnoff and City Manager Update (City
Planning)
JUNE
onference Calls
Public Facilities, CGSC, USOSC, and Village Council
• Mayor, City Manager, and Commissioner Sarnoff
GREEN THE WATERFRONT
STRENGTHEN CENTER GROVE
ENHANCE CONNECTIONS
CAPITALIZE ON VIEWS
LEN' THE BAYIA"
SOFTBALL
MCFAR
PLAZA
SHAKESPEARE
IN THE PARK
McFarlane Plaza
-11
MARY
STREET
PIER
•ra esdeprAP.Z. ',AMA zfze,
Mary Street Pier
27th Avenue Pier
27th Avenue Pier
.• ...-- .... _
N ..-
..-
-1-*\';---. '--
27th Avenue Pier
ti
BOAT
RAMP
DINGHY
TIE-UP
US SAILING CENTER
114
COCONUT GROVE
SAILING CLUB
D. t
•
11 •
•
LAUNCH/
PUMP -OUT
1
. .•e on South Ba shore
GROVE KEY
adidbar2ii
•
- •AC;Irark
PARKING GARAGE WITH GREEN ROOF RETAIL/OFFICE SOUTH BAYSHORE DRIVE
GRAND BAY
P.n Am»ri .n Driv
Pan Am Drive
Ill
b. II I,+•
•
i ••• i i .. lb
• - i • ' i lb l" i
ea v. i _ 1 CIi • .i 'f•• i i i •
i i lib i i% Ili1 v.•i? • • ■
-
i • i i �• i •i i% %
lb
1
SOUTH BAYSHORE - North of Awlation: -
SOUTH BAYSHORE - South of Aviation _
MCFARLANE ROAD
__-
-- -
.___--
_ __.
South Ba shore Drive - North of Aviation Ave
EXISTING
soft shoulder
55" Existing Pedestrian Crossing
droving lane
driving lane
55' Existing Pedestrian Crossing
2T Proposed Pedestrian Crossing
PROPOSED
(pedestrian walk
bike trail)
driving lame
driving lane
7S E mrs__Pecrtarian C Isis
75 Pr imyi Pmxsmen Canintq
PROPOSED
68' Existing Pedestrian Crossing
parking fans
driving lane
driviniano
driving lane
dnving lane
parking lane
EXISTING
Exist njPedestran Crossing
58' Proposed Pedestrian Crossin
BLAINE
parking lane driving lane
driving lane driving lane
parking lane
PROPOSED
Commodore Bike Trail diverted thru Peacock Park
1
r`-
14
r r+ "
• • r w ■ AM
r ■ • lb ; , _ .
w alp
v. •'' `+.r r r r`
r ■ ■ ■ a ▪ rith
1 r v." rt ` w ■
w
Commodore Bike trail and Mixed Use Pat
Baywalk and Major Pedestrian, Routes
_ _ _ _ + _
S S - _ _
r - f w ~
•
1•
s a
a •
a ♦ A
♦ ♦ ♦
i a a ♦
i .a MS 1, M.
a
% ♦
a
11.
PHASE 1
• Demo Expo Center
• Build Grove Key Pier and
restaurant, relocate shrimpers
and charters to pier
• South Bayshore Drive
improvements, north of Aviation
• Build parking garage and
associated Pan Am Drive
improvements
Total Cost $45.4 Million
1•
0
? /1
a 1 a
a a ,
a s i I. 7 a
a
a a 1 i a
a a 1
i
a a
a
A
1 a a
16
lb
1 1
16
• . a '► a s `a
a a
a a a a lb a
1 } 1 1 1
a T. 1 *. 1
b g
Is a
_ _ a
53,n_ C3--q%) C/VE"j
El
ado -100.00 1.
■
" ,rGti
eft
r � 11 7
PHASE 2
• Expand Dockmaster Facility,
redesign DKM Parking, build CG
Sailing Center (CGSC and
USOSC)
• Regatta Park
• City Hall landscape
improvements
Total Cost $63.0 Million
1•
0
? /1
a a �
s a i s a
a
a s
' i a ▪ A
i lb g
a a
a a
a a
s s s
a a ▪ lb
a' ., s a '► a a a
a•a a s s'� s a
i • s ss? " a a
s a a . .•••
•
i g
a la
▪ g
_ a "a
g-g%3 C/VL-j
El
at7 ❑
PHASE
• Myers Park improvements
• McFarlane Road improvements
• Lower Peacock Park
improvements
• South Bayshore Drive
improvements, south of Aviation
Total Cost $6.6 Million
1•
I
? /1
a a ♦ ,a
a a ♦
s i♦ a s
a a i
a a
a a
a a a
a 1 a
a a i
♦ as a 1 a
1 .• a .1 a a A a
♦ a a•a a 1
a a • a a 1 a a a i
i s a 1a •� a a 1
Mb
a
♦ a a *. 1 .1 a s a i a a
a .a
▪ Ta
MD MI.
-i
0
EIVP
looKa• im
PHASE 4
• Upper Peacock Park
improvements
• Kennedy Park improvements
Total Cost $11.0 Million
0
1 � i
? /1
i za
1 by
a 1 •
1 1 la e
♦ 4 1 1
i „r 1 • 11 •1p, 1 1 1
Mb
♦ .11 7.1 .1 11 ♦ i a T.
1lb
-11
•44.0.11%;,1•41144, •
<ftf -ft•
�`a V
%3 ❑❑ �
O
{
-017
Market Phase - Cultural Center
• City issues RFP
• Site driven by market
Total Cost $35.4 Million
• Miami City Commission
Approval
• Final Documentation
• Phased Implementation
,V4r
'OW
1r-
12? q315'
AN
At.
/ •
- • ' -
*41*
e —