HomeMy WebLinkAboutExhibitBID NO.: 07-08-012
TAMIAMI STORM SEWER IMPROVEMENTS
CIP PROJECT NO.: B-50706
Due Date: Monday, March 24, 2008
Due Time: 2:00 P.M.
Mayor Manuel A. Diaz
Commissioner Angel Gonzalez, District 1
Commissioner Marc Sarnoff, District 2
Commissioner Joe M. Sanchez, District 3
Commissioner Tomas P. Regalado, District 4
Commissioner Michelle Spence -Jones, District 5
City Manager, Pedro G. Hernandez, P.E.
Issued By:
City of Miami
Department of Capital Improvements Program
444 SW 2nd Avenue, 8th Floor
Miami, FL 33130
ft N-9(2
Project Name: Tamiami Storm Sewer Improvements Bid No.: 07-08-012
CITY OF MIAMI
ADDENDUM NO. 2
March 20, 2008
TAMIAMI STORM SEWER IMPROVEMENTS PROJECT, B-50706
BID PJO. 07-08-012
TO: ALL PROSPECTIVE BIDDERS:
The following changes, additions, clarifications, and deletions amend the above -captioned
Bid/Contract documents, and shall become an integral part of the bid responses and the
subsequent contract.= -Please note the contents herein and affix same to the documents you have
on hand.
Requests for Information:
Question No. 1
Answer No. 1
Conflict manholes show a ductile iron pipe sleeve to be installed over an
existing sanitary sewer tine in service. Is it the irdentlon of the City to have
the sanitary sewer service interrupted to allow for the instalatlon of the
manhole sleeve; or is it acceptable to cut the pipe sleeve to had and
sandwich existing sanitary service between manhole sections and
associated pipe sleeves?
There are 4 conflict manholes that require the ductile Iron pipe sleeve to
encase existing 8' sanitary sew tines. In all 4 crossings the fr sanitary is
well below the avg. October ground water elevation. Therefore, cutting the
pipe sleeve in half to enclose the existing sanitary sew lines would be
preferable, as long as they can insure water tightness of the sleeve within
each structure, than cutting the existing sewer mains and dealing with
extensive de -watering at each location.
Question No. 2 Pay Item 19 as noted on Sheet No.4 of the plans differs from the Pay Item
noted on the Bid Form. Please clarify.
Answer No. 2 On page 85 of the Bid Forms, Item 19, replace the word 'Manhole' with the
word "Catch Basin".
AND SHALL BE MADE A PART THEREOF.
/AO
THIS ADDENDUM IS AN ESSENTIAL PORTION OF T. CONTRACT DOCUMENT
rfre .41)
Di
kant
Capital Improvements Program
This addendum should be signed and dated by bidder and submitted as proof of
Receipt with the submission of bids. The bidder by identifying the addendum
number in their bid proposal and by the signing and submission of their bid shall serve
as proof of receipt of this addendum.
NAME OF FIRM:
SIGNATURE:
DATE