Loading...
HomeMy WebLinkAboutExhibitBID NO.: 07-08-012 TAMIAMI STORM SEWER IMPROVEMENTS CIP PROJECT NO.: B-50706 Due Date: Monday, March 24, 2008 Due Time: 2:00 P.M. Mayor Manuel A. Diaz Commissioner Angel Gonzalez, District 1 Commissioner Marc Sarnoff, District 2 Commissioner Joe M. Sanchez, District 3 Commissioner Tomas P. Regalado, District 4 Commissioner Michelle Spence -Jones, District 5 City Manager, Pedro G. Hernandez, P.E. Issued By: City of Miami Department of Capital Improvements Program 444 SW 2nd Avenue, 8th Floor Miami, FL 33130 ft N-9(2 Project Name: Tamiami Storm Sewer Improvements Bid No.: 07-08-012 CITY OF MIAMI ADDENDUM NO. 2 March 20, 2008 TAMIAMI STORM SEWER IMPROVEMENTS PROJECT, B-50706 BID PJO. 07-08-012 TO: ALL PROSPECTIVE BIDDERS: The following changes, additions, clarifications, and deletions amend the above -captioned Bid/Contract documents, and shall become an integral part of the bid responses and the subsequent contract.= -Please note the contents herein and affix same to the documents you have on hand. Requests for Information: Question No. 1 Answer No. 1 Conflict manholes show a ductile iron pipe sleeve to be installed over an existing sanitary sewer tine in service. Is it the irdentlon of the City to have the sanitary sewer service interrupted to allow for the instalatlon of the manhole sleeve; or is it acceptable to cut the pipe sleeve to had and sandwich existing sanitary service between manhole sections and associated pipe sleeves? There are 4 conflict manholes that require the ductile Iron pipe sleeve to encase existing 8' sanitary sew tines. In all 4 crossings the fr sanitary is well below the avg. October ground water elevation. Therefore, cutting the pipe sleeve in half to enclose the existing sanitary sew lines would be preferable, as long as they can insure water tightness of the sleeve within each structure, than cutting the existing sewer mains and dealing with extensive de -watering at each location. Question No. 2 Pay Item 19 as noted on Sheet No.4 of the plans differs from the Pay Item noted on the Bid Form. Please clarify. Answer No. 2 On page 85 of the Bid Forms, Item 19, replace the word 'Manhole' with the word "Catch Basin". AND SHALL BE MADE A PART THEREOF. /AO THIS ADDENDUM IS AN ESSENTIAL PORTION OF T. CONTRACT DOCUMENT rfre .41) Di kant Capital Improvements Program This addendum should be signed and dated by bidder and submitted as proof of Receipt with the submission of bids. The bidder by identifying the addendum number in their bid proposal and by the signing and submission of their bid shall serve as proof of receipt of this addendum. NAME OF FIRM: SIGNATURE: DATE