Loading...
HomeMy WebLinkAboutExhibit4of a i PEDRO G. HERNANDEZ, N.E. City Manager January 3, 2007 Mr. Miguel Ocana, President MEF Construction, Inc. 782 N.W. LeJeune Road Suite 640 Miami, Florida 33126 (305) 461- 0660 Fax RE: Citywide Sidewalk Repair Project, B-43114A NOTICE TO PROCEED Dear Mr. Ocana: You are hereby authorized to proceed starting January 3, 2007, with the construction work and supplies necessary for the maintenance and miscellaneous repairs of the sidewalk, curb and roadway infrastructure within the City of Miami, Florida, according to the specifications for the above referenced project. The estimated completion time for this project is one year with the option to rCi'IC v for four additional one year periods pending on the availability of funding and contractor's performance. The project cost is $917,000 per year. If you have any questions regarding this notice to proceed, please contact Genady Beylin, Engineer I1 of my staff at either (305) 416-1755. Respectfully, Stephanie N. Grindell, P.E. Director EE/ee c: Francis ,Mitchell, P.E., Assistant Director Public Works Genady Beylin, Engineer II, Public Works Omar Fernandez, ET 111, Public Works Elyrosa Estevez, P.E. I11 DEPARTMENT OF PUBLIC WORKS 444 S.W. Znd Avenue / Miami, Florida 331301 r305) 416-120C / Fax: (305) 415-1278 January 8, 2008 Mr. Miguel Ocana, President MEF Construction, Inc. 782 N.W. LeJeune Road Suite 640 Miami, Florida 33126 (305) 461- 0660 Fax RE: Citywide Sidewalk Repair Project, B-43114A NOTICE TO PROCEED — SECOND YEAR Dear Mr. Ocana: You are hereby authorized to proceed starting January 10, 2008, with the construction work and supplies necessary for the maintenance and miscellaneous repairs of the sidewalk, curb and roadway infrastructure within the City of Miami, Florida, according to the specifications for the above referenced project. The estimated completion time for this renewal term is for one year period pending on the availability of funding and contractor's performance. The project cost is $917,000 for this year. If you have any questions regarding this notice to proceed, please contact Genady Beylin, Engineer [1 of my staff at either (305) 416-1755. Respectfully, `Tr.ancis Mitchel!, P.E. Assistant Director FM/EE/GB/ee c: Stephanie N. Grindell, P.E., Director Public Works Genady Beylin, Engineer II, Public Works Omar Fernandez, ET III, Public Works Elyrosa Estevez, P.E. 1II