HomeMy WebLinkAboutExhibit' AMENDMENT NO.3 TO CONSTRUCTION CONTRACT
ORANGE BOWL STORM WATER PUMP STATION UPGRADES (3/1D) BIDDING,
PROJECT B-50653
This Amendment No. 3 to the Contract dated June 11, 2004 (the "Contract")
between the City of Miami, a municipal corporation of the State of Florida ("CITY"), and
NCI Construction Co. ("CONTRACTOR") for the project entitled "Orange Bowl Storm
Water Pump Station Upgrades (314 Bidding)", Project No. B-50653, ("PROJECT") is
entered into this day of , 2008.
RECITALS
WHEREAS, the Contract was entered into pursuant to the approval of the City
Commission by Resolution No. 04-0260 in the total amount of $278,127 for the Scope of
Work included in the original Contract Documents for the PROJECT; and
WHEREAS, by Resolution No. 05-0179, the City Commission approved
Amendment No.1 which increased the Contractor's scope of work to include building
code required revisions and increased the Contractor's fee by $20,000 from $278,127 to
$298,127; and
WHEREAS, by Resolution No. 07-0398, the City Commission approved
Amendment, No.2 which addressed the need to improve the existing roof in order to
support new equipment increased the Contractor's scope of work to include the
additional work and increased the Contractor's fee by $80,000 from $298,127, to an
amount not to exceed $378,127; and
WHEREAS, it is now necessary to amend the Scope of Work to provide
additional work for the installation of a 40 linear feet handrail to the building roof for fall
protection around roof top mounted equipment, as required by the City's Mechanical
Building Inspector; and
NOW THEREFORE, for the considerations hereinafter set forth:
The Agreement dated June 11, 2004, as amended by Amendment No. 1 and No.
2, is hereby amended as follows:
1. Scope of Work is hereby revised to include all labor, materials and equipment
required to perform the work for the installation of a 40 linear feet handrail to
the building roof for fall protection around roof top mounted equipment. The
Additional Work shall be performed in a manner consistent will all applicable
terms and conditions of the Contract Documents.
2. CONTRACT SUM is hereby increased by an amount not to exceed $4,730,
thereby increasing the total Contract Sum to Three Hundred Eighty Two
Thousand Eight Hundred fifty Seven Dollars and No Cents ($382,857).
All other terms and conditions of the Contract are in effect and remain unchanged.
!jX c` -'0
CITY OF MIAMI,
ATTEST
By: By:
Priscilla A. Thompson, City Clerk Pedro G. Hernandez, City Manager
APPROVED AS TO LEGAL FORM AND APPROVED AS TO INSURANCE
CORRECTNESS REQUIREMENTS:
By: By:
Julie O. Bru, City Attorney LeeAnn Brehm,
Risk Management Director
CONTRACTOR
ATTEST: NCI Construction Co.
By: By:
Corporate Secretary Allen J. Thompson, President
NCI Construction, Co.
(Affix Corporate Seal)
2