Loading...
HomeMy WebLinkAboutExhibit4mown) Roadway Impt+avenwnts Roadway Improvements. All wads will be designed and constructed in accordance with all applicable jurisdictional agency standards. (i.e. Miami -Dade County, City of Miami or Florida Department of Transportation (FOOT). Roadway construction will include sub -grade base, curbing, sidewalks, signage and striping. Roadway lighting will be constructed along t e roads within the District. Roadways outside the Boundary of the District (Off -site) N. Miami Ave. The improvements consist of reconstructing approximately 2,350 ft, of existing, 4-lane urban roadway. The proposed center medians will be located between NE 32 street and NE 34 street. There will be sections of on -road, municipal parallel parking on the East aide unite right-of-way located: between NE 32th St. and NE 35`1 St. with a cleaner* of approximately 50 ft. Isom each respective intersection. There will be dedicated left turn lanes where feasible from NE 29s' street to NE 36" street. NE 36" St. This is a state road. The improvements consist of reconstructing approximately 2,100 ft. of existing, 4-lane urban roadway. The proposed center medians will be located between where feasible. NE 29' St. (West of RIR). The improvements consist of reconstructing approximately 875 ft. of existing, 4-lane urban roadway. Where feasible there will be nnu icipal parallel parking on both sides of the road. Roadways inside the Boundary of the District (On -site) Buena Vista Ave. The improvements consist of constructing approximately 1400 ft. of new 2- lane, urban roadway. The mad, which runs from NE 32" a St. to NE 36a St., will have on -road, municipal parallel parking on both its East and West sides, The parallel parking on both sides wr7E run on the entirety of the street, but will provide approximately 50-100 It of clearance as Exhibit B-1 needed at the moons: North: side ofNE 32°1 St, both the north and south sides ofNE 34 St and the South side ofNE 36m St, respectively. Midtown Blvd. The improvements consist of constructing approximately 2,450 it. of new 2- lane, urban roadway from NE 29th St. to NE 36th St. The roadway will have omitted, municipal parallel parking on both its east and west sides excluding approximately 50-100 ft. of clearance as needed on both sides of each of the respective intersections as needed: NE 29°i St. (North side only), NE 31' St., NE 32" St., NB 34°i St and NE 36th St (South side only). East Coast Ave. The improvements consist of constructing approximately 1,800 $. of 2-Inure urban, roadway from NE 30th St to NE 35th St. The roadway will include on -mad, private/Ioeding paratlel parking on the West side only. The parallel parking will run along the entire length of the avenue, and will provide approximately 50-100 It. of clearance as needed on both sides of each respective street as needed: NE 30th St. (North side only), NE 32" St, NE 34th St. and NE 35°i St. (South side only). NE 30th St The improvements will consist of constmeting approximately 350 & of urban, 2- lane roadway from NE 1" Pi. to E. Coast Ave. The roadway will include mined, municipal parallel parking on both its north and south sides, providing approximately 75-100 ft. of clearance as needed at each of the respective intersections: NE Iae PI and E. Coast Ave. NE 31" St The improvements mill consist of most -actin approximately 600 ft. of urban, 2- lane roadway from N. Mani Ave. to NE Pl. The roadway will include on -road, nwnicipaI parallel parking on both its north and south sides, providing approximately 50-100 lt. of clearance as needed at each of the respective intersections: N. Miami Ave. and NE 1a PI. NE 35°b St. The mprovem eats will consist of constructing approximately 375 ft. of urban, 2- lane roadway from NE 1' Pl. to E. Coast Ave. The roadway will include on -mad, municipal parallel parking on both its north and mouth sides, providing approximately 75 ft of elearance at each of the respective intersections: NE is P1 and E. Coast Ave. NE 32rd St. The improvements will consist of oonstructing approxinutely 1,050 it of urban, 2- lane roadway from N. Miami Ave. to E. Coast Ave. The roadway will include on -road, Exhibit B-2 municipal parallel parking on both its north and south sides, providing approxinuttely 50-100 ft. of clearance as needed at each of the respective intersections: Past side of N. Miami Avaa, East and West sides of Market St. and NE 1'd P1., and West side of E. Coast Ave. NE346 St. The improvements will consist of constructing approximately 1,175 it of urban, 2- lane roadway from N. Miami Ave. to E. Coast Ave. The roadway will include on -road, municipal parallel parking on boot its north and south sides along its length, providing approximately 50-100 ft. of clearance es needed at each of the Impactive interactions: East side of N. Miami Ave., East and West sides of Market Stand NB l's PI., and West side of B. Coast Ave. In the center of the right-of-way tlheae will be medians along the length of the roadway, providing approximately 50-75 ft. of clearance as needed at each of the respective intersections: Fast side ofN. Miami Ave., East and West sides of Market St. and NE t'a Pl., and West side of E. Coast Ave. Exhibit 8-3