HomeMy WebLinkAboutPre-AttachmentExhibit A
Lawrence Storm Water Pump Station Upgrades IProiect
Scope of Work
Electrical changes:
- Relocation of electrical control center
Removal of existing diesel engine drives for pumps 4 and 5 consists of:
- Removal of the existing exhaust shrouds
- Removal of the existing fuel piping to the day tank
- Removal of the existing housekeeping pad
- Removal of the existing exhaust/silencer and associated piping
- Removal of electrical conduit and cables that are no longer require
Block up opening of engine No. 5 shroud and exhaust pipe opening
Cut masonry wall to allow installation of generator. Contractor will install shroud
where masonry wall was cut.