Loading...
HomeMy WebLinkAboutPre-AttachmentExhibit A Lawrence Storm Water Pump Station Upgrades IProiect Scope of Work Electrical changes: - Relocation of electrical control center Removal of existing diesel engine drives for pumps 4 and 5 consists of: - Removal of the existing exhaust shrouds - Removal of the existing fuel piping to the day tank - Removal of the existing housekeeping pad - Removal of the existing exhaust/silencer and associated piping - Removal of electrical conduit and cables that are no longer require Block up opening of engine No. 5 shroud and exhaust pipe opening Cut masonry wall to allow installation of generator. Contractor will install shroud where masonry wall was cut.