HomeMy WebLinkAboutType B Section FR/SRGREENWAY TYPE 'B'
SECTION
The section shows two 10 foot
lanes of vehicular traffic with
parking on both sides of the
R.O.W. On one side of the
R.O.W. is a 5 foot wide sidewalk.
On the riverside is a 9 foot wide
Greenway.
In the event that the River side
parking can be removed in the
future, the section of the road is
such that the river side parking
can be removed and the 15 foot
Greenway section installed. It
is designed in such a way that
the storm water drainage will be
unaffected by the removal of the
parking.
This cross section has been
reviewed, and approved, by the
City of Miami Department of Public
Works. To accomplish this section
will require the reconstruction of all
roadways, curbs, sidewalks, and
storm drainage and the elimination
of some on street parking.
n
THE GREENWAY
DECORATIVE
CONCRETE
PAVEMENT
UROAN RESOURCE. GROUP
TO RIVER
PARKING REMOVED
TREES PLANTED AT
INTERSECTIONS AND
WHEN SPACE PERMITS
L L
TRAVEL LANE PARKING
STREET LIGHTS
OVERHEAD WIRES
1-TRUST
U K
TYPE B SECTION rum
THE MIAMI RIVER GREENWAY - PHASE 1 9