Loading...
HomeMy WebLinkAboutSummary Form SRDate: 1/25/2008 Second Reading Ordinance AGENDA 11 tPR. FILE ID: CS — t^ } . 2 Requesting Department: Public Works Commission Meeting Date: 3/13/2008 District Impacted: 2 Type: ❑ Resolution ® Ordinance 1 Emergency Ordinance ❑ Discussion Item 0 Other Subject: Ordinance amending Chapter 54 of the City Code - Base Building Lines to reduce the zoned right of way width along portions of S.W. and N.W. North River Drive. Purpose of Item: An Ordinance amending Chapter 54 of the Code of the City of Miami, Florida, entitled "Streets and Sidewalks" by amending Section 54-190 entitled "Nonstandard Street Widths" to reduce the zoned street right of way width of S.W. and N.W. North River Drive between S.W. 3 Street and N.W. 5 Street. Background Information: In response to property owners' concerns about the impact of the additional right of way dedication on the narrow depth property along the riverfront and the implementation of the Miami River Greenway plan, the Public Works Department has evaluated the current right of way along S.W. and N.W. North River Drive and has prepared the following analysis and recommendation. SEE ATTACHED SUPPLEMENT AND LOCATION MAP Budget Impact Analysis NO Is this item related to revenue? NO Is this item an expenditure? If so, please identify funding source below. General Account No: 000 Special Revenue Account No: 000 CIP Project No: 000 Is this item funded by Homeland Defense/Neighborhood Improvement Bonds? Start Up Capital Cost: Maintenance Cost: Total Fiscal Impact: $0.00 $0.00 $0.00 Final Approvals (SIGN AND AT.E CIP Budget If using or recei\'ing capital funds Grants Risk Management Purchasing Dept. Director j Chief City Manager % f 1 SUPPLEMENT TO AGENDA ITEM SUMMARY FORM ORDINANCE AMENDING CHAPTER 54 OF THE CITY CODE BASE BUILDING LINES — S.W. AND N.W. NORTH RIVER DRIVE The privately owned properties along North River Drive between S.W. 3 Street and N.W. 5 Street have not dedicated the full 60 feet of right of way width. Those properties where the dedication has been made are State, County or City controlled. The Miami Greenway Concept Plan and the Capital Improvement construction plans for North River Drive develop the Greenway within the existing 50 foot wide dedicated portion of the right of way. There are numerous impediments to widen the roadway to the full 60 feet of width. All of the private properties along the river are very narrow and would be adversely affected by the additional dedication. The "East Coast Fisheries" building encroaches beyond the base building line and it has a historic designation. The S.W. 1 Street bridge support columns preclude widening. The reduction in the right of way width of the roadway will not affect the continuity of the Greenway or public access to the waterfront. The Miami River Commission has evaluated the effect of the zoned street width reduction of this roadway with respect to the preservation and function of the Miami River corridor and has no substantial objections. For these reasons, the Public Works Department recommends that the zoned width of North River Drive between S.W. 3 Street and N.W. 5 Street be reduced from 60 feet to the existing and developed 50 foot right of way width. The Departments of Police. Fire -Rescue, Solid Waste and Transportation have been notified of the proposed reduction of the zoned width of this right of way.