Loading...
HomeMy WebLinkAboutII.A. Project Descriptionscayne .ark 11 Substantial Modification to Biscayne Park MUSP a Mixed Use Project MAJOR USE SPECIAL PERMIT PROJECT DESCRIPTION Zoning Ordinance No. 11000 11, Section 1304.2.1 Application forms; supplementary materials (a) Statement of ownership and control of the proposed development of activity. The Disclosure of Ownership and Ownership Affidavit are provided in Article I. (b) Statement describing in detail the character and intended use of the development of activity.. The original Biscayne Park ("Biscayne Park I") Major Use Special Permit ("MUSP") permitted a mixed -use project consisting of a residential high-rise tower over a parking pedestal. The parking pedestal is covered with ground floor retail fronting Biscayne Boulevard and N.E. 25 Street. Upper floors of the pedestal are lined with residential units fronting Biscayne Boulevard and N.E. 25 Street while the south side (along N.E. 24 Street) is covered with 12,502 square feet of office space. Biscayne Park I responded to the needs and desires of the community for improved quality of life by making available work/live space. The project includes a large amenities package with ground floor greenspace, pool and barbeque area, exercise club, etc. The parking pedestal currently provides 331 parking spaces. Biscayne Park I is sensitive to its neighbors and surrounding historical buildings across Biscayne Boulevard and north of N.E. 25 Street by continuing the scale of the neighborhood along the Biscayne Boulevard corridor. The project is 95% complete at the time of this submission, and should be 100% complete by the end of this summer. Biscayne Park II is a substantial modification to the approved MUSP that permitted the construction of Biscayne Park I. The purpose of this substantial modification is to add an additional .93 gross acres of property to the overall development, and to provide for a new development that will serve to activate the pedestrian realm on approximately three fourths of the subject block, including the activation of all of the portion of said block that fronts NE 2n Avenue. Biscayne Park II will provide for the development of an additional office tower of approximately 122,100 square feet, an additional parking pedestal providing 434 spaces and additional 9,952 square feet of retail. While Biscayne Park I and Biscayne Park 11 are part and parcel of the same project, and have the same MIAMI 1308882.1 7604424899 developer, the structures are being developed in such a way where the parking and other common facilities are separated, allowing the greatest level of privacy to those occupying the residential components of Biscayne Park (c) General location map, showing relation of the site or activity for which special permit is sought to major streets, schools, existing utilities, shopping areas, important physical features in and adjoining the project or activity and the like:. The following exhibits are included with the Major Use Special Permit Application and are located under Tab 6 of the Supporting Documents. (i) Location Map: Map of the surrounding street system indicating the project location. (ii) Area Context Map: Map of the project area indicating buildup in the surrounding area. (iii) Aerial: Aerial Photograph of the surrounding area indicating the project site. (d) A site plan containing the title of the project and the names of the project planner and developer, date, and north arrow and, based on an exact survey of the property drawn to a scale of sufficient size to show: The Site plan is located under Tab 6 of the Supporting Documents. 1. Boundaries of the project, any existing streets, building, watercourses, easements and section lines; The boundaries of the project and the location of existing streets are shown on the survey located under Tab 5 of the Supporting Documents. Exact location of all buildings and structures; The exact location of all existing buildings located on the Property is shown on the survey located under Tab 5 of the Supporting Documents. The location of the building to be constructed are shown on the Site Plan, under Tab 6 of the Supporting Documents. ili. Access and traffic flow and how vehicular traffic will be separated from pedestrian and other types of traffic; Service vehicles will access the loading docks from the service entrance. (I) Off-street parking and off-street loading area; Off-street parking will be provided in the parking garage located in the podium of the building. AU parking levels will MIAM11308882.1 7604424899 have access from ground floor ramps. The parking garage will consist of six (6) levels of parking decks. The loading berths are internally located within the parking pedestal. (2) Recreational Facilities; Location and access to recreational facilities can be found under Tab 6 of the supporting documents. (3) Screens and buffers; Landscaping areas indicated in the landscape plans under Tab 6 of the supporting documents. (4) Refuse collections areas; Waste collection will be provided by a containerized compactor system located in the parking pedestal. These facilities are shown on the Site Plan under Tab 6 of the Supporting Documents. (5) Access to utilities and points of utilities hookups. Access and connections to site utilities are discussed in the Site Utility Study located under Tab 3 of the Supporting Documents. (e) Tabulations of total gross acreage in the project and the percentages thereof proposed to be devoted to the permitted uses and ground coverage. Percentage of the allowable total FAR is 99.99% The various permitted uses. Maximum permitted footprint: 74,469 gross square feet Building Footprint: 67,357 gross square feet ii. Ground coverage by structures. Ground coverage by the structures is 90.44% of the total gross lot area. (f) Tabulation showing: i, The derivation of numbers of off-street parking and off-street loading spaces shown in (d) above: 1 space per 1 and 2 bedroom units = 170 spaces MIAMI 1308882.1 7604424899 2 space per 3 and 4 bedroom units x 2 88 spa s Cornmercial Spaces (Phase I) Commercial Spaces (Phase II) 54 spaces 434 spaces Total Required Parking Spaces (Phases I & II) = 737 spaces Total Provided Parking Spaces (Phases I & II) = 765 spaces ii Total project density in dwelling units per acre. Allowed: 2.02 acres x 150 units per acre = 303 units Provided in Phase I: 214 residential units Proposed in Phase II: 0 residential units Total: 214 units Percentage of Allowed Density: 70% (g) If common facilities (such as recreation areas of structures, private streets, common open space, etc.) are to be provided for the development, statements as to how such common facilities are to be provided and permanently maintained. (h) Storm drainage and sanitary sewerage plans. Storm drainage, water distribution, wastewater and solid waste generation provisions are discussed in the Site Utility Study located under Tab 3 of the Supporting Documents. (i) Architectural definitions for buildings in the development; The design plans are included under Tab 6 of the Supporting Documents. (j) Landscaping plan, including types, sizes and locations of vegetation and decorative shrubbery, and showing provisions for irrigation and future maintenance. The Landscaping Plan located under Tab 6 of the Supporting Documents, specify the plant types, sizes and locations, as well as indications that all planted areas will be fully irrigated and maintained by the project. (k) Plans for recreation facilities, if any, including location and general description of buildings for such use. Recreational facilities are located under Tab 6, M I AM 11308882.1 7604424899 (I) Such additional data, maps, plans, or statements as may be required for the particular use or activity involved. Recreational facilities are located under Tab 6. The Drawings submitted with this Application are located under Tab 6 of the Supporting Documents. (m) Such additional data as the applicant may believe is pertinent to the proper consideration of the site and development plan. Elevations depicting the architectural character of the project are included under Tab 6 of the Supporting Documents, 12. Section 1702.2.1 General Report. (a) Property ownership or ownerships and beneficial interest within the boundaries of the area proposed for Major Use Special Permit, Statement of Ownership and beneficial interest within the boundaries of the area proposed for Major Use Special Permit are provided in Article I. (b) The nature of the unified interest or control. The nature of unified interest or control is indicated in Article I. (c) Survey of the proposed area showing property lines and ownership. A copy of the survey of the Property is included under Tab 5 of the Supporting Documents. (d) Map of existing features, including streets, alleys, easements, utilities lines, existing land use, general topography and physical features. The existing site features and utility lines are shown on the survey of Property located under Tab 5 and the Site Utility Study located under Tab 3 of the Supporting Documents. In addition, the surrounding street systems are included under Tab 2, Traffic Impact Study. (e) Materials to demonstrate the relationship of the elements listed in (d) preceding to surrounding area characteristics. The Drawings Submitted with this Application are located under Tab 6 of the Supporting Documents. Materials shall be provided to the Urban Design Review Board for review. (f) Existing Zoning and adopted Land Use Designations for the area on and around the lands proposed for Major Use Special Permit. Land Use Designation and Zoning Designation are consistent with one another. The current Land Use Designation is High Density Multifamily and the MIAMi 1305582.1 7604424899 Zoning District is Restricted Commercial, which also allows residential development equivalent to Nigh Density Multifamily Residential, 13, Section 1702.2.2 Major Use Special Permit Concept Plan. (a) Relationships of the concept plan to surrounding, existing and proposed future uses, Activities, systems and facilities (transportation, recreation, view corridors, pedestrian systems, services systems and similar uses). Article ll contains a written narrative of the Project outlining proposed uses, activities and architectural character. This narrative also contains descriptions of the Project's relationship to traffic, pedestrian movements, and transportation access. Maps located on Tab 6 indicate the Project's relationship to surrounding streets, land uses and functions. Building elevations, sections and perspectives showing the proposed materials, vertical profile and height, and orientation to streets is included in the Drawings Submitted with this Application. The list of Drawings Submitted is found under Tab 6 of the Supporting Documents. (b) Existing Zoning and adopted Land Use Principles and Designations. The Project conforms to the current Land Use and Zoning Designations. Set back requirements under the Code are satisfied or superseded for the proposed project. 14, Section 1702.2.3 Developmental Impact Study. (a) A traffic analysis shall be submitted for an area within approximately 1/4 mile of the site, or an area including the major intersections to be impacted by the site, whichever is larger. The Traffic Impact Analysis is included under Tab 2 of the Supporting Documents. (b) Economic impact data shall be provided, including estimates for construction costs, construction employment, and permanent employment. The Economic Impact Study is included under Tab 4 of the Supporting Documents. (c) A housing impact assessment. The project satisfies the need for market rate housing in the re- development of the Central Commercial Residential District. (d) A description of proposed energy conservation measures shall be provided, including only those measures that are proposed in addition to the minimum requirements in State Energy Code. M IAM 11308882.1 7604424899 spa if%N SEMCZS • CHEWi3+STS- a R[ ;# G ENVIRONMENTAL SERVtCfS ENVIRONMENTAL IMPACT ASSESSMENT (EIA) For 25 Plaza Corp Suite 101 615 NE. 22nd street Miami, Florida. 33137 Project Biscayne Park II Location 250 NE. 25th street East of NE. 2nd Avenue between NE 25 Street and NE. 24th street Miami Dade, Florida 33137 Prepared By All State Engineering & Testing Consultants, Inc. 2380 West 78th Street, Hialeah, Florida 33016 Phone. 305-888.3373 FAX:305.888.7443 December 4, 2007 TAB ,E .OF CONTENTS 1.0- INTRODUCTION: 2.0- SITE VISIT AND PROJECT DESCRIPTION 10. ENVIRONMENTAL CONCERNS 4.0- REVIEW OFBICAYNE PARK II SUBSTATTIAL MODIFICATION TO BISCAYNE PARK MUSP 5.0- CONCLUSION ATTACHMENTS: 1. m Attachment 1.0: Photographs 2. - Attachment 2.0: Site location map and Related Maps 3, - Attachment 3.0: Documents from the ESA Phase I Report. 4. - Attachment 4.0: Documents from the Biscayne Park MUSP Report. 5. -Attachment 5.0: Other related documents 1 PO INTRODUCTION In response to the request of Mr. Carlos de Melo of 25 Plaza Corp, All State Engineering and Testing Consultants, Inc. (ASETC) prepared an Environmental impact Assessment (EIA) Report for the a parcel located in the vicinity of 250 NE, 25th street, Miami Dade, Florida 33137. The property in its entirety (Biscayne Park l and II) consists of the following physical addresses and folio numbers: Addresses & Folio ADDRESS FOLIO 2540 Biscayne Blvd 01-3230-023-0220 258 NE, 25th street 01-3230-023-0250 250 NE. 25th street 01-3230-023-0260 242 NE. 25th street 01-3230-023-0270 234 NE, 25th street 01-3230-023-0280 226 NE. 25th street 01-3230-023-0290 218 NE. 251h street 01-3230-023-0300 202 NE. 25th street 01-3230-023-0310 2403 NE. 2N0 Avenue 01-3230-026-0950 219 NE. 24th street 01-3230-026-0940 243 NE. 24th street 01-3230-026-0910 251 NE. 24th street 01-3230-026-0900 265 NE. 24th street 01-3230-026-0891 The properties listed above are owned by 25 Plaza Corp. Jose Ferreira de Melo (100%). The complete ownership breakdown is given in exhibit "B" of the Major Use Special Permit (MUSP). The subject property Biscayne Park 11, is the 0.93 gross acres of property to the west of Biscayne Park included with the folio numbers listed above (see section 2.2 and attachment 2.0). The supporting documents used to perform this study included, but are not limited to the following: • Environmental Site Assessment Phase i prepared by Alpha Engineering Corp, Dated June 2005. • Substantial Modification to Biscayne Park MUSP, signed May 2007 • Minority Construction Employment plan • Traffic impact analysis • Site utility study • Economic impact study • Survey of property • Submitted drawings 2,0 SITE VISIT AND PROJECT DESCRIPTION 2.1 SITE VISIT On November 30, 2007 ASETC'S environmental engineer visited the subject property and neighboring areas. The purpose of the visit was to detect any soil discoloration, soil odor, existing durnp heaps or any potential source of hazardous substance contamination or negative environmental impact. Based on our visual inspection the property showed no signs of the uncontrolled uses of hazardous materials and no signs of potential sources of hazardous substance contamination or negative environmental impact. There was no indication of negative environmental impact at the time of the site visit. In addition to our visual inspection, photographs were taken to document the physical condition of the site at the time of the visit (see photographs, attachment 1.0). 2.2 PROJECT DESCRIPTION The original Biscayne Park ("Biscayne Park 1") Major Use Special Permit ("MUSP") permitted a mixed -use project consisting of a residential high-rise tower over a parking pedestal, The parking pedestal is covered with ground floor retail fronting Biscayne Boulevard and N.E. 25th street. Upper floors of the pedestal are lined with residential units fronting Biscayne Boulevard and N.E. 25th street while the south side (along N.E. 24th street) is covered with 12, 502 square feet of office space. Biscayne Park 1 responded to the needs and desires of the community for improved quality of life by making available work/live space. The project includes a large amenities package with ground floor green space, pool and barbeque area, with an exercise club. The parking pedestal -currently provides 331 parking spaces. Biscayne Park I is sensitive to its neighbors and surrounding historical buildings across Biscayne Boulevard and north of N.E. 25th street by continuing the scale of the neighborhood along the Biscayne Boulevard corridor, The project is 95% completed at the time of this submission, and should be 100% complete by the end of 2007. Biscayne Park II is a substantial modification to the approved MUSP that permitted the construction of Biscayne Park I. The purpose of this substantial modification is to add an additional .93 gross acres of property to the overall development, and to provide for a new development that will serve to activate the pedestrian realm on approximately three fourth of the subject block including the activation of all of the portion of said block that fronts NE. 2nd Avenue. Biscayne Park 11 will provide for the development of an additional tower of approximately 122,100 square feet, and additional parking pedestal providing 434 spaces and additional 9, 586 square feet of retail. While Biscayne Park 1 and Biscayne Park 11 are part and parcel of the same project, and have the same developers, the structure are being developed in such a way where the parking and other common facilities are separated, allowing the greatest level of privacy to those occupying the residential components of Biscayne Park i. General location map, showing relation of the site or activity for which special permits is sought to major street, schools, existing utilities, shopping areas, important physical features in and adjoining the project or activity and the like are .provided in attachment 2,0, The following exhibits are included with the Major Use Special Permit Application and are located under Tab 6 of the Supporting Documents. ij Location Map: Map of surrounding street system indicating the project location, Area context Map: Map of the project area indicating build up in the surrounding area. iii Aerial: Aerial photograph of the surrounding area indicating the project site, 3.0 ENVIRONMENTAL CONCERNS: 3.1 WETLANDS There are no protected wetlands on the subject property. The soils in the vicinity of the subject property are classified as urban lands by the USDA Dade County Soil survey. 3.2 AIR AND WATER Based on the intended use of the subject property there is no indication that the proposed development will significantly impact the air, surface water and groundwater quality in the vicinity of the project. 3.3 Flora and Fauna Due to the site's highly urbanized character, there is neither significant natural vegetation remaining, nor is there any listed wildlife habitating the site. Vegetation is limited to landscape species, and wildlife is limited to species that have adapted to urban environments. 3.4 Cumulative and Long Tenn Impacts on Natural Environment Considering the lack of wetlands, native vegetation and wildlife on the subject property, the Project will not have any adverse cumulative or long-term environmental impacts. 3.5 Irreversible Commitment of Natural Resource Considering the lack of natural resources on the subject property, there will not be any irreversible Commitment of natural resources associated with this project. 3.6 Review of Previous ESA Phase I A review of an ESA Phase I prepared by Alpha •Engineering Corp. revealed the following conclusions and recommendations as stated by Alpha Engineering Corp.: Conclusions are based on our analysis of the information obtained and the observation made regarding our Environmental assessment of the Subject Sites and surrounding area. Based on the findings, the Subject Sites are not listed at the present time in the EPA, FDEP and/or DERM records as having any environmental violation. Most of the contaminated sites, that are approved under one of the State Cleanup Programs, are eligible for monetary refunds for state paid programs. The State approved sites cleanup will depend on their ranking with the State and the availability of funds. The sites not eligible for any of the State Funded Cleanup programs would have to assume financial responsibility for any impact on the subject site, however they appear to be remediating their sites on their own. The normal groundwater flows to the East or Southeast; but the surface waters, may at times reverse the normal flow in the area, such as Biscayne Bay. The sites to the North and West of Subject site, that are upstream, are normally sites that could have an impact of the Subject Site. Any Contaminated site listed by the Agencies would be responsible for any impact on the Subject Site, if proven. The one that is close to the sites and which could have an impact on the sites is 2522 N.E. 2nd Ave, however, it is approved under one of the State cleanup programs and they would be responsible for any impact. 16 Review of Previous ESA Phase lI (continue) information obtained from Mr, Nick Contos, FDEP, Tallahassee explains the apparent discrepancies between the FDEP records. The FOEP Storage Tank/Contaminated Facility List in Appendix 4, may show a site that is "On Going" meaning the assessment or remediation is being conducted, yet the site may have been dropped from the FDEP Compliance and Enforcement List, because thesite has complied with the requirements ordered by the Agencies and there is no need for further "enforcement or they are being monitored by GERM rather than MEP. Summary of Contaminated Sites Site Name Site Address ` EPA_RCRA FDEP-UGT Store a -UST DERM-Codes R & L Developers 169 NE 27 St. Csd-On going TCAR-DERM-1 4 05 Site Cont. Fina Service 1925 NE. 2 Ave. Csd-on Going Eligible EDI-90 UT-Cont- As • roved Braman BMW 1930 NE. 2 Ave. SQG-92 CDS-on going 1W-5 DERM Amoco Serv.Station Eagle #2 2522 NE.2 Ave. SQG-91 Open -on going Eligible-C & E in compliance -05 RAP-94-UT- Cont-approved Banana Supply Co. 3030 NE. 2 Ave, NOV-12-04 CSD-on going C & E: FDEP Compliance and Enforcement Records The Alpha report concludes that, there are no recorded environmental violations at the sites and No Further Investigations are needed, The written portion of the report is included in attachment 3.0 3,7 Review of EDR report dated December 4, 2007 A review of the Environmental Data Resources (EDR) Report dated December 4, 2007 revealed that the subject property was not listed in any of the databases searched by EDR. A portion of the report reviewed is given in attachment 5.0. The report also revealed a number of sites of potential environmental concern that were also noted in the Alpha ESA Phase I report discussed in section 3.6 above. ASETC also reviewed EDR's City Directory Abstract, EDR's Multi -Tenant Retail Facility Report and EDR's Certified Sanborn Map Report for the subject property as part of our study of the site and surrounding areas (see attachment 5.0). 4.0 REVIEW OF BISCA PA_ II SUBSTANTIAL MOD FICATION TO BISCAYNE PARK MUSP A review of the Biscayne Park it substantial modification to Biscayne Park MUSP a mixed use project and supporting documents did not reveal any significant environmental -concerns that would cause a negative Environmental impact. The supporting document reviewed included the Minority -Construction Employment Plan, Traffic impact Analysis, Site Utility Study, Survey of the property and various drawings submitted, The projects relationship to traffic flow, pedestrian movement, transportation access, sewer and drainage, among other things, is thoroughly examined in the Biscayne Park it substantial modification to Biscayne Park MUSP prepared by Vicky Garcia -Toledo, Esquire, P.A Blizir Sunberg Baena Price and Axe#ford LLP .(see documents from the report in attachment 4,0), 5.0 CONCLUSION Based on our site visit, review of various documents regarding the proposed development of the project, our general knowledge of the area and our professional Engineering judgment and experience it is our professional opinion that the proposed development of the subject property is appropriate and should have a favorable impact on the environment and natural resources of the City and immediate surrounding areas. This Environmental Impact Assessment (EIA) Report has been performed in accordance with general accepted engineering practices, using our best professional engineering judgment and experience. The methodology used in this type of assessment identified elements, which are of obvious nature and observance. Results and conclusions produced and derived have this intrinsic limitation. This, however, does not invalidate the merits of the work, whose prime objective is to determine any obvious conditions of detrimental environmental impact, which, if present, would indicate the need of further more in depth and sophisticated procedures of investigation. No further warranties, expressed or implied are made, We appreciate the opportunity to have been of service in this capacity. Please feel free to contact us if there area any questions or comments regarding this matter. Sincerely yours, Wayne Webb, P. E. Fla. Registration #56701 All State Engineering & Testing Consultants, Inc. WWlfarahfbm/25 plaza Corp, Prakash S. Lodha, P.E. Florida Registration # 43510 Consulting Engineer