Budget Detail for Mooring Bollards Design for Bicentennial Park Boat Slip
Task
Amount
Specific Purpose Survey
$ 2,500
Geotechnical Engineering
5,000
Design and Permitting Services
48,400
Construction Contract Admin.
26,000
Reimbursable Expenses
3,000
Allowance for Additional Services
5,100
Grand Total
$ 90,000
Scope of Work
The project is a continuation of the revitalization of the Miami Downtown area
and will facilitate the mooring of visiting ships at the Bicentennial Park boat slip.
This first phase of the project includes designing and determining materials and
type of bollards to be installed in the second or construction phase of the project.
The design will be for ten (10) bollards, spaced 100 feet apart from the east to
the west sides of the slip.