Loading...
HomeMy WebLinkAboutWorkOrder4MN OF MIAMI WORK ,ORDER FON1,3imal City of Miami, Fianna 'WORK ORDER FOR PROFESSIONAL:ii4 t) IContract C 7YCONTINIRAIG SERVICE (CONTRACT FOR CI Engineering — ylor-,,,,, 1,,i)4.,.. NA- • Contract Effective Oates: START -9481111144f END:142).104-8iBEIABB I Contract Number K-04-00851 Authorization: 031 esolution 0 City Code Section Numbeed411#118 CITY WORK ORDER NUMBER Prior Work Orders issued — Number --0 Value -- WCRK ORDER EFFECTIVE DATE 1 loik REQUIRED COS1PLETION ATE rz •:( i- 02 iz i 8 CONSULTANT COM FIRM OFFICE • 800 Brickell Ave, Suite 710 LOCATION CITY Miami STATT Fi ZIP 23131 CONTACT NAME Mary Benitez, PE. TITLE" Senior Project Manager =PROPOSAL PROJECT NAME Kinloch Storm Sewer improvements Project PROJECT B-50705 NUMBER BRIEF SCOPE OF Study and propose of alternatives for the drainage improvements on the area bounded by 42 Ave on the WORK East, 47 Ave on the West, 7 Street on the North and 8 Street on the South, As Swear detailed in attached Consultant Work Order Monona, Consulted Proposal Date Consultant Project Manager Mary Benitez, P.E. COMPENSATION SUMMARY MAJOR TASKS ;WORK PHASES DEUVERABLE DUE FEE FEE BASIS General tasks 1-11 for the drainage study $90,178.00 Lump Sum, Not to Exceed Fee $ Lump Sum, Not to Exceed Fee $ Lump Sum, Not to Emceed Fee $ Lump Sum, Nct to Exceed Fee $ Lump Sum, Nct to Bcceed Fee Land Surveyor S100,075.00 Lump Sum. Nct to Exceed Fee Geotechnical $3,300.00 Lump Sum, Not to Based Fee Al Professional CONSULTANT FEES $193,550.00 SUBTOTAL Pilasance For Rambursable Evilness $3,000.00 Direct Expanse Allowance For Addlliond Services (if an $6,000.00 TOTAL MAXIMUM AMOUNT 8201,553.00 Lump Swn, Not to Exceed Fee FUNDING AND INCORPORATED DOCUMENTS OTHER NOTES Estimated Construction Coat $ FUNDING 385200-1 $3,000,00 $ SOURCE(S) $ $ This Work Order shell be perbrined in accordance KWh the abovevelerenced Connect, and incorporates by reference an dosisnants described imlow: Z Propos*, referenced 3 . Requirements °May 1. Carew* referenced above 4. Other Riad above Authodzanon APPROVALS I Name Signature nil Date Prepared By Maria E. Lopez „et6 ,, City Project Manager Approved By Cesar Gonzalez X4Y94 Team Leader Horizontal projects Approved By . fr SIgneiruction Team Leader Approved By Mary Conway, P.E. Dired0f IL \ I 04 AftePt" BY Consukant Victor Naos