HomeMy WebLinkAboutWorkOrder4MN OF MIAMI WORK ,ORDER FON1,3imal
City of Miami, Fianna
'WORK ORDER FOR PROFESSIONAL:ii4
t)
IContract
C 7YCONTINIRAIG SERVICE (CONTRACT FOR CI Engineering — ylor-,,,,, 1,,i)4.,..
NA- •
Contract Effective Oates: START -9481111144f END:142).104-8iBEIABB I Contract Number K-04-00851
Authorization: 031 esolution 0 City Code Section Numbeed411#118
CITY WORK ORDER NUMBER
Prior Work Orders issued — Number --0
Value --
WCRK ORDER EFFECTIVE DATE 1 loik REQUIRED COS1PLETION ATE
rz
•:(
i-
02
iz
i 8
CONSULTANT COM
FIRM
OFFICE
• 800 Brickell Ave, Suite 710
LOCATION
CITY Miami
STATT Fi ZIP 23131
CONTACT NAME Mary Benitez, PE.
TITLE" Senior Project Manager
=PROPOSAL
PROJECT NAME Kinloch Storm Sewer improvements Project
PROJECT B-50705
NUMBER
BRIEF SCOPE OF Study and propose of alternatives for the drainage improvements on the area bounded by 42 Ave on the
WORK East, 47 Ave on the West, 7 Street on the North and 8 Street on the South,
As Swear detailed in attached Consultant Work Order Monona,
Consulted Proposal Date Consultant Project Manager Mary Benitez, P.E.
COMPENSATION SUMMARY
MAJOR TASKS ;WORK PHASES
DEUVERABLE
DUE
FEE
FEE BASIS
General tasks 1-11 for the drainage study
$90,178.00
Lump Sum, Not to Exceed Fee
$
Lump Sum, Not to Exceed Fee
$
Lump Sum, Not to Emceed Fee
$
Lump Sum, Nct to Exceed Fee
$
Lump Sum, Nct to Bcceed Fee
Land Surveyor
S100,075.00
Lump Sum. Nct to Exceed Fee
Geotechnical
$3,300.00
Lump Sum, Not to Based Fee
Al Professional CONSULTANT FEES
$193,550.00
SUBTOTAL
Pilasance For Rambursable Evilness
$3,000.00
Direct Expanse
Allowance For Addlliond Services (if an
$6,000.00
TOTAL MAXIMUM AMOUNT 8201,553.00 Lump Swn, Not to Exceed Fee
FUNDING AND
INCORPORATED
DOCUMENTS
OTHER NOTES
Estimated Construction Coat $
FUNDING
385200-1
$3,000,00
$
SOURCE(S)
$
$
This Work Order shell be perbrined in accordance KWh the abovevelerenced Connect, and incorporates by reference an
dosisnants described imlow:
Z Propos*, referenced 3 . Requirements °May
1. Carew* referenced above 4. Other Riad
above Authodzanon
APPROVALS I
Name
Signature
nil
Date
Prepared By
Maria E. Lopez
„et6 ,,
City Project Manager
Approved By
Cesar Gonzalez
X4Y94
Team Leader Horizontal projects
Approved By
.
fr
SIgneiruction Team Leader
Approved By
Mary Conway, P.E.
Dired0f
IL \ I 04
AftePt" BY
Consukant
Victor Naos