Loading...
HomeMy WebLinkAboutAnalysis3PROJECT ANALYSIS FORM Department of Capital Improvements City of Miami Date Prepared: 11/18/2004 Revised Oats: 12eviar si Date: Revised Date: PROJECT NAME: Kirtioch Storm Sewer Improvements Project ADDRESS / LOCATION: From SW 3 St to NW 7 St & on W From 42 Ave to 47 Ave PROJECT No.: 3-50705 NET OFFICE: Fiagami DISTRICT: D4 CuENT DEPT: EST. PROJECT COST: CLIENT CONTACT: TEL.: ALLOCATED FUNDS: 4i:.000,000 PROJECT MANAGER: MU;R4A E. LOPEZ TEL.: (305) 415-120E PROCUREMENT: Formal Bid CCNSTR. MANAGER: TEL.: ?ROJEC T TEAM: Transportation INSPECTOR CEO: TEL.: EST. DESIGN START: EST. BID ADV.: EST. DESIGN END: 1 EST. AWARD DATE: EST. CONSTRUCTION START: EST. CONSTRUCTION END: PROJECT COST ESTIMATE PRODUCTION PHASE A. Design Svcs. - Outside Consultant 1 basic Fees: 2 Additional Services: B. Design Svcs. - GIP 1 In-house Basic Design Fee: Prime Consultant: CDM Percentage 8.8% $201,553 0.0% $0 SUB -TOTAL: $201,553 0.0% $0 2 in-house Additional Design Services: 0.0% $0 C Production Management Services 1 Prod. Mgmt. of Outside Consultant by CIP: SUB -TOTAL: $0 0.0% $0 2 Prod. Mgmt of Outside Consultant by Industry Partner. 0.0% $0 D Miscellaneous Services 1 Survey: Vendor SUB -TOTAL: $0 2 Re -plat Vendor. 3 Geotechnical Tasting: vendor: 4 Uti ty locations (Soft Digs): vendor: 5 Asbestos Survey. vendor: 8 Energy / HVAC Calculation: vendor: 7 Phase I Environmental: Vendor: 8 Phase II Etwironmentat Vendor: 9 Structural Testing: vendor: 10 Archeological Survey: Vendor: 11 Other. Vendor: SUB -TOTAL: SO E Special Fees /Asseeements: 1 \ GERM (Plans review, envronmental permits, etc.): Fee Waiver r . 2 Miami -Dade County Water and Sewer Department (Plain review) 3 Florida Department of Environmental Protection (Permits): 4 FDOT (Plane review, inspections, etc.): 5 South Florida Water Management District (Permits): H U.S. Army Corps of Engineers (Plans review, permits): 7 HRS (Plans review, inspection, etc.): 8 Other. SUB -TOTAL: $0 PRODUCTION PHASE TOTAL: $201,553 CONSTRUCTION PHASE F Construction: JOC Coreador: 1 Construction Estimate: 2 Contingency A1owence: 10.0% $0 3 Data & Telecommunication Systems (IT Dept.): 4 Fbttures, Furniture and Equipment 5 WASA System betterment 8 FPL Contribution -In -Aid -of Construction: 7 Other. SUB -TOTAL: $0 Page 1 of 2 K5 nlocet Storm 'Se wer IrnlprIvernents Project Et-50705 PROJECT COST ESTIMATE G City and other Gov't Agencies Permit Fees 1 City of Miami Permits: Bldg. Dept. r Public Works 147 '3 Miami -Dade County Impact Fees: 3 Miami -Dade County Archeological Monitoring: 4 Other. aus-TOT . $0 CONSTRUCTION P 1ASE TOTAL..: $0 CONSTRUCTION ADMINISTRATION H Constnrction Inspection Services - CIP: 5.0% $0 Construction Mgmt. - Industry Partner. O.u% $0 J Construction Engineering Observer (CEO) - indusvy Partner o.o % $0 K JGC Administration 0.O% $0 CONSTRUCTION ADMINISTRATION TOTAL: $0 ADMINISTRATIVE EXPENSES L CIP Dept.(Mgmt/Budget/Procurement/Comm.): 3.0% $0 M Industry Partner Program Mgmt. Support 0.7% $0 ADMINISTRATiVE EXPENSES TOTAL: $0 LAND ACQUISITION EXPENSES N Land Cost 0 Transaction Costs: 0.o% $0 LAND ACQUISITION TOTAL: $0 GRAND TOTAL - ESTIMATED PROJECT COST (Study only): $201,553 PROJECT SCOPE The project consists of the study and proposal of alternatives for the drainage improvements on the area bounded by 42 Ave on the East, 47 Ave on the West, NW 7 St on the North and SW 8 St on the South. a) ti 0 1HOmetand Defense Bond Funds FUND SOURCES Fund: Homeland Defense Bond Funds CIP s 352262 Fiscal Year Makable Amount $3,000,000 Fund: CIP / Amount Fund: CIP ft Fund: CIP / Amount: Fund: CIP / Amount: Fund: Amount TOTAL ALLOCATED AMOUNT: $3,000,000 of tN. Giant oeprtment Copley To: CLIENT DEPARTMENT, ALL CIP SECTION CHIEFS, CIP SENIOR ACCOUNTANT, NOR PROGRAM MANAGER Page 2 of 2