Loading...
HomeMy WebLinkAboutAnalysis Form4PROJECT ANALYSIS FORM Department of Capital Improvements City of Miami Date Prepared: 11/16/2004 Revised Date: Revised Daie: Revised Date: PROJECT NAME: I(iinioch Storm Sewer 1mp8ovemeoats Project ADDRESS / LOCATION: From SW 8 3t to NW 7 St & on W From 42 Ave to 47 Ave PROJECT , lo,: 8-50705 NET OFFICE: Ftagerni DISTRICT: D4 CLIENT DEPT: EST. PROJECT COST: CLIENT CONTACT: TEL: ALLOCATED FUNDS: $3,000, 000 PROJECT MANAGER: MARIA E. LOPEZ TEL: (305) 415-120e PROCUREMENT: Formal Bid CONSR.MANAGER: TEL.: PROJECT TEAM: Transportation INSPECTOR 'CEO: TEL: EST. DESK3N START: EST. DESIGN ENO: EST. 9D ADV.: EST. AWARD DATE. EST. CONSTRUCTION START: EST. CONSTRUCTION END: LPROJECT COST ESTIMATE PRODUCTION PHASE A. Design Svcs. - Outside Consultant Prime Ca -meant: CDM Percentage $201,553 1 Basic Fees: 8.6% 2 Additional Services: 0.0% $0 B. Design Svcs. - CIP 1 In-house Basic Design Fee: SUB -TOTAL: 0.0% S201,553 $0 2 In-house Additional Design Services: 0.0% $0 C Production Management Services 1 Prod. Mgmt. of Outside Consultant by CIP: SUB -TOTAL: 0.0% So $0 2 Prod. Mgmt of Outside Consultant by Industry Partner. 0.0% $0 D Miscellaneous Services 1 Survey. Vendor. SUB -TOTAL SO 2 Re -plat Vendor: 3 Geotechnical Testing: Vendor 4 Utilty Locations (Soft Digs): vendor. 5 Asbestos Survey: vendor: 6 Energy / HVAC Calculations: vendor. 7 Phase I Environmental: vector 8 Phase 8 Environmental: Vendor: 9 Structural Testing: Vector: 10 Archeological Survey: vendor: 11 Other. Vendor E Specter Fees /Assessments 1\ GERM (Pima wirer, awironmentel permits, sto.): SUB -TOTAL Fee Waiver r SO . 2 Fliain -Dade County Water and Sever Department (Plan review) 3 Florida Department of Environmental Protection (Permits): 4 FOOT (Plans review, inspections, etc.): 5 South Florida Water Management DtWrct (Prima*: 6 U.S. Army Corps of Engineers (Plans review, permits): 7 HRS (Plans review, inspections, eta.): 8 Other. su*.TOTAL: SO PRODUCTION PHASE TOTAL: $201,353 CONSTRUCTION PHASE F Construction: JOC Coroaeror: • . 1 Construction Estimate: 2 ContingencyAlowenes to.0% S0 3 Data & Telecommunication Systems (IT Dept): 4 Fortunes, Furniture and Equipment 5 WASA System Betterment 6 FPL Contribution -in -Aid -of Construction: • 7 Other. S98-TOTAL: SO Page 1 of 2 Kjnloch Storm Sewer improvements Project B-50705 PROJECT COST ESTIMATE G City and other Gov't Agencies Permit Fees 1 City of Miami Pennits: BIdo. Dept. (` Public Works Ii' 2 Miami -Dade County impact Fees: 3 Miami -Dade County -Archeological Monitoring: 4 Other: SUB TOTAL: $0 CONSTRUCTION PHASE TOTAL: $0 CONSTRUCTION ADMINISTRATION H Construction Inspection SerAces - CIP: 5.0% $0 i Construction Mgmt. - Industry Partner. 0.0% $0 J Construction Engineering Observer (CEO) - industry Partner 0.0% $0 K JOC Administration 0.0% $0 CONSTRUCiiON ADMINISTRATION TOTAL: $0 ADMINISTRATIVE EXPENSES 1 CIP Dept (MgmtlBudgetWProcurement/Comm.): 3.0% $0 M industry Partner Program Mgrnt Support 0.7% $0 ADMINISTRATIVE EXPENSES TOTAL: $0 LAND ACQUISITION EXPENSES N Land Cost 0 Transaction Costs: 0.0% $0 LAND ACQUISITION TOTAL: $0 GRAND TOTAL - ESTIMATED PROJECT COST (Study only): S201,553 PROJECT SCOPE The project consists of the study and proposal of alternatives for the drainage improvements on the area bounded by 42 Ave on the East, 47 Ave on the West. NW 7 St on the North and SW 8 St on the South. to 0 HOnleland Defense Bond Funds FUND SOURCES Fund: Homeland Defense Bond Funds LIPS 352262 Fi.o iY.s Aram* Amount S3,000,000 Fund: CIP Amount: Fund: CV1 Fund: CIP Amount: Fund: PP it Amount: Fund: CIPf Amount: TOTAL ALLOCATED AMOUNT: $3,000,000 Project manager: 'ldtIGt ZOfie7 Sr. Project Marrow _ 4S J7 ( RevMWd by: Oats: ///ZG'•%-I Daft oats: -0" t/ Dena: %2-/% eo Copies To: CLIENT DEPARTMENT, ALL CIP SECTION CHIEFS, CIP SENIOR ACCOUNTANT, HDR PROGRAM MANAGER Page 2af2