Loading...
HomeMy WebLinkAboutAnalysis Form2PROJECT ANAI SIS FORM Department Capital kkp cverneraz City ;of iiain rDate Prepared: Revised Jaffe: 11/18/2004 j Revised Date: b;tevised hate: PKO. ECT NAME: Kinloch Stonn Sewer Improvements Project AtacRES6 / LCCAT1CN: From SW 8 St to NW 7 St R on W From 42 Ave to d' Ave i'RO ECT No.: 8-507 05 NET OFFICE: Regard 04 DISTRICT: CLIENT DEPT: EST. PROJECT COST: CLIENT CONTACT: TEL: ALLOCATED FUNDS; $3,6CG,000 PROJECT MANAGER; MARIA. E. LOPEZ TEL.: (305) 416-1206 PROCUREMENT: Formal Bid CONSTR. ?A MMER; TEL: PROJECT TEAM: Transportation INSPECTORICEO: TEL: EST. DESIGN START: EST. DES/ON END: EST. MD DV.: EST. AWARD DATE: EST. CONSTRUCTION START: EST. CONSTRUCTION END: PROJECT COST ESTIMATE PRODUCTION PHASE A. Design Svcs. - Outside Consultant 1 Basic Fees: Prime Cannelton: COM Percentage 8.8% $522,045 2 Addtional Services: 0.0% $0 8. Design Svcs. - C:P 1 In-house Basic Design Fee: SUB -TOTAL: 3522,043 0.0% $0 2 In-house Additional Design Services: 0.0% $0 C Production Management Services 1 Prod. Mgmt of Outside Consultant by CIP: SUB -TOTAL: $0 2.3% $92,000 2 Prod. Mgmt of Outside Consutant by Industry Partner. 0.0% $0 D Miscellaneous Services 1 Survey. Venda: SUB -TOTAL $92,000 $174,655 2 Re -plat Vendor 3 Geotechnical Teefing: vendor: 4 Utility Locations (Soft Dive): vendor: 5 Asbestos Survey. Vendor $3,300 e Energy / HVAC Calculations: Vendor: 7 Phase I Emnironmentat Vendor 8 Phase!! Environments) Valor 9 Structural Testing Vendor 10 Archeological Survey. Vendor: 11 Other: Venda stSB-TOTAL: $177,955 E Special Fees /Assessments: 1 DERM (Plana review, environmental prunes, etc.): Fee waiver r 2 Miami -Dade County Water and Sewer Oepertmnt (Plan review) 3 Florida Department of Environmental Protection (Penrrts): 4 FOOT (Plena review, inspections, etc.): 5 South Florida Water Management District (Permits): 8 U.S. Anny Corps of Engineers (Plana review, Permits): 7 HRS (Plans review, inspections, etc.): 8 Other SUB -TOTAL: $0 PRODUCTION PHASE TOTAL: $792,000 CONSTRUCTION PHASE F Construction: .roc contracmr: 1 Construction Estimate: $4,000,000 2 Contingency Alowanee: 3 Data a Telecommunicalon Systems (IT Dept): 4 Fbdures, Furniture and Equipment 10.0% $400,000 5 WASA System Betterment 6 FPL Construction: 7 Other. SUBTOTAL: S4,400,000 Page 1 of 2 XInloch 'ton 'Sewer Improvements Project S-s070a l PROJECT COST ESTIMATE G City and other Gov't Agencies Permit Fees 1 City of Miami Permits: Bldg. Dept. fr Pubtc Wcrke l Miami -Dade County impact Fees: :1 Miami -Dade County Archeological Monitoring: 4 Other 3913-TO': AL: 30 CONSTRUCTION PHASE TOTAL: --$$4,400,009 CONSTRUCTION ADMINISTRATION H Construction Inspection Services - CIP: 0.0% $0 ! Construction Mgmt - Industry Partner. 0.0% $0 .i Construction Engineering Observer (CEO) - industry Partner i0.0% $400,000 if JCC Administration 1.5% 560,000 CONSTRUCTION ADMINISTRATION TOTAL: $i460,000 ADMINISTRATIVE EXPENSES L CIP Dept. (Mgmt/Budget/Procurement/Comm.): 3.0% $120,000 M Industry Partner Program Mgmt Support: 0.0% $0 ADMINISTRATIVE EXPENSES TOTAL: $120,000 LAND ACQUISITION EXPENSES N Land Cost 0 Transaction Costs: 0.0% $0 LAND ACQUISITION TOTAL: $0 GRAND TOTAL - ESTIMATED PROJECT COST (D..JJ ): $5,772,000 PROJECT SCOPE The project consists of the study and proposal of alternatives for the drainage improvements on the area bounded by 42 Ave on the East, 47 Ave on the West, NW 7 St on the North and SW 8 St on the South. b W 0 FUND SOURCES Fund: Homeland Defense Bond Funds CIP t Fiscal Year moor 352262 Mnawat $814,000 Fund: CIP F Amount Fund: CIP 6 Amount Fund: CIP 6 Amount: Fund: CIP i Amount Fund: CIP 1 Amount TOTAL ALLOCATED AMOUNT: $614,000 Propct Meneger. Maria E. Lopez Sr. Project Mrrper: Cesar Gonzalez Reviewed by Csy4aMikont - CIP Budget AdrninhSalor Accepted by. Mary Conway, P.E. AP - Director of the cant Deserter* 1 // I ' Sign oseo:011 rich /// Deb: ifr'7'06 Dd. 1/3opp& Copies To: CLIENT DEPARTMENT, ALL CIP SECTION CHIEFS. GP SENIOR ACCOUNTANT. HOR PROGRAM MANAGER Page 2of2