Loading...
HomeMy WebLinkAboutBid TabulationBID TABULATION for Bid No. 06-07-041 Bids were received by City Clerk on Decembor 27, 2007 at 11:00 a.m. SLAB COVER TRENCH CLEANING PROJECT, M-0001 Cleaning Work TOTAL BID A: the sum of items 1 and 2 based on a one (1) year completion time $357,900.00 $402,000.00 $420,000.00 BIDDER ENVIROWASTE SERVICES GROUP, INC. ENVIRONMENTAL PERFORMANCE SYSTEM12650 1ST GLOBAL INDUSTRIAL SERVICES, LP ADDRESS 2911 NW 39 Street Miami FL 33142 12650 NW S. RIVER DRIVE Medley FL 33176 222 North 16th Street LaPorte, Texas 77571 Line No. Pay Item Description Units per 9near foot Item Cost Total Cost Units per linear toot Item Cost j Total Cost Units per linear fiot Item Cost Total Cost t SLAB COVER TRENCH CLEANING = Price for furnishing all labor, equipment and machinery necessary for a thorough cleaning of 2,000 linear feet of cover trench, cover ditch or slab cover trench as indicated in Section 01000- Supplemental Conditions, of these specifications. 2,000 $168.95 $337,900.00 2,000 $191.00 $382,000.00 2,000 $200.00 $400,000.00 2 CASH ALLOWANCE - Provision for Special Items, as noted in Division 2 Special Provisions, the lump sum of R- $20,000.00 �� M $20,000.00 " $20,000.00 The Public Works Department has determined that the lowest and most responsive and responsible bidder is Envirowaste Services Group Inc. for the TOTAL BID in the amount of $ 357,900 for a one (1) year period with option to renew for four (4) one (1) Year periods pending availability of funding and contractor's performance. Prepared on: December 27, 2007 by Elyrosa Estevez