Loading...
HomeMy WebLinkAboutExhibit2ATTACHMENT A PROJECT WORK PLAN Please complete this form with as much detail as possible I. GRANTEE/PROJECT INFORMATION: Grantee: Project Title: DEP Grant #: City of Miami Fairlawn Storm Sewers Improvement Project, Phase III, B-50704 LP eSittr lof rf lv Il. FUNDING PLAN: Cate o of Expenditure 2007-2008 LP Grant Funds Provided 2007-2008 Match Required Total 2007-2008 Funding Professional Services . Construction & Demolition $250,000 $6,800,500 $7,050,500 Land Equipment Other S ecify) Total $250,000 $6,800,500 S7,050,500 Note: 1) Construction administration costs have been included in the funding amounts listed in the table above. 2) Although the table above indicates a funding plan for Fiscal Year 2007-2008, the above funds will not be expended entirely in Fiscal Year 2007-2008. The funds will be expended throughout the life of the project. Please refer below to "IV. Project Milestones" for the estimated project timeline. III. SCOPE OF WORK: (e.g., specifications, task timeline within current authorized Agreement period, method or manner of performance, requirements, quarterly cash needs, etc.) 'The City of Miami project entitled "Fairlawn Storm Sewers_1tiproveinent Project, Phase III, B-50704" consists of the construction of storm sewer improvements to the area bounded by S.W. 8 Street, W. Flagler Street, S.W. 47 Avenue and S.W. 57 Avenue. The improvements consists of exfiltration trench (french drains), storm sewer pipe for gravity conveyance, new connections to existing outfalls, manholes, catch basins, cross drains, and surface restoration. Note: Storm water from this project discharges to the C-4 Canal (Tamiami Canal) which connects to the Biscayne Bay via the Miami River. Biscayne Bay is a SFWMD priority water body. This project also includes road improvements such as roadway milling & resurfacing, damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA ramps and re- sod of swales at street blocks affected by the drainage construction. IV. PROJECT MILESTONES: (i.e. timelines, contracts, if funded in prior year(s) where is the project now) An estimated project timeline with milestones are as follows: Item Completion Date Task 1: Complete design and permit application process August 2008 Task 2: •Issue advertisement for bids; receive and award bids February 2009 Task 3: Construction Start March 2009 Task 4: Construction Completion & Project close-out December 2010 If the scope of work includes construction: Estimated Construction start date: Estimated scope of work completion date: March 2009 December 2010 lithe scope is only for preconstraction work: Estimated scope of work completion date: V. LOCAL MATCH & OTHER GRANT FUNDS: List the sources and amounts for all funds being used to fund this project. SOURCE AMOUNT $ 2007-2008 LFgrant $250,000 2007-2008 Match CIP No. 999999 Streets Bond Program Series 1 $4,024,125 CIP No. 999999 Streets Bond Program Series 2 $1 341,375 - CIP No. 352284 Homeland Defense Bonds (Series 1) $614,000 CIP No. 352284 Homeland Defense Bonds (Series 3) $827,000 Total Project Cost (Total Funding) $7,050,500