PROJECT DATA SHEET
SITE INFORMATION/ BUILDING SUMMARY
SITE INFORMATION:
A -ZONING DISTRICT:
G-1
8 - LAND AREA:
C-1
NET LOT AREA
147,448 SF (3.38 ACRES)
GROSS LOT AREA
171,543.70 SF (3.93 ACRES)
C - DENSITY:
MAX. ALLOWED DENSITY: 150 UNITS I NET ACRE
150 UNITS x 3.38 = 507 UNITS
PROPOSED UNITS:
104 UNITS
D - HEIGHT:
C-1
MAX. ALLOWED BLGD. HEIGHT:
UNLIMITED
PHASE II - PROPOSED BLGD. HEIGHT:
186'-8" (191'-8" NGVD)
PHASE Ili - PROPOSED BLGD. HEIGHT:
81'-8" (86'-8" NGVD)
"PHASE I - PROPOSED BLGD. HEIGHT:
63'-0" (68'-0" NGVD)
'NOTE: PHASE I NOT INCLUDED IN MUSP
E - SETBACKS:
C-1
FRONT SETBACK REQUIRED:
10'-0"
FRONT SETBACKS PROVIDER:
10'-0"
REAR SETBACK REQUIRED:
10'-0"
REAR SETBACKS PROVIDED:
10'-0"
CANAL SETBACK REQUIRED:
20'-0"
CANAL SETBACKS PROVIDED:
20'-0"
SIDE SETBACK REQUIRED:
0'-0"
SIDE SETBACKS PROVIDED:
0,-0"
SIDE FRONTING STREET SETBACK REQ.:
7'-6"
SIDE FRONTING STREET SETBACK PRO.:
7' 6"
SIDE ABUTTIN R-4 SETBACK REQ.:
5.-0"
SIDE ABUTTIN R-4 SETBACK PRO.:
5'-0"
F - FLOOR AREA RATIO:
1
C-1
BASE F.A.R. = GROSS LOT AREA x 0.60
171,543.70 SF x 1.72 = 295,055.16 SF
P.U.D. (+20%) = 295,055,16 x 0.20 = 59,011.03 SF
A.F.H. (+25%) = 295,055.16 x 0.25 = 73,763.79 SF
TOTAL F.A.R. = 427,829.98 SF
'
TOTAL ALLOWED F.A.R. = 427,829.98 SF
PROPOSED PHASE II - F.A.R. =
302,776 SF
I
PROPOSED PHASE 111- F.A.R. =
37,224 SF
PROPOSED PHASE I - F.A.R. =
53,775 SF
TOTAL PROPOSED F.A.R. = 393,775 SF 1
PROJECT DATA SHEET
DETAIL (PART I)
i. - LOT uO`; ERAGE:
� 1
.
REQUIRED PRC3VIDEO
MAX. BLOC. FOOTPRINT ALLOWED = # PHASE II - BLGD. FOOTPRINT _ 79,782 SF
GROSS LOT AREA x 0.60` = 1 PHASE III - BLGD. FOOTPRINT : 6,701 SF
• NOTE. eLfg,518 REQ. YW 85%. #0%.25%LINERS ON PARKING STRVCTURtS}
PHASE I - BLGD. FOOTPRINT = 16,415 SF
171,543.70 x 0.60' = 102,926.22 SF
FOOTPRINT ALLOWED = 102,926.22 SF PROPOSED COMBINED FOOTPRINT = 102,898 SF
FOOTPRINT DIFFERENCE = 28.22 SF
1-1 - OPEN SPACE: REFER TO SHEETS A-005a & A-005b FOR OPEN SPACE DIAGRAMS
1 PHASE I - NOT INCLUDED IN MUSP- REFERENCE ONLY
OPEN SPACE REQUIRED = PHASE I - OPEN SPACE PROVIDED = 112,698 SF
GROSS LOT AREA x 0.10 = PHASE 11 - OPEN SPACE PROVIDED = 25,122 SF
171,543.70 x 0.10= 17,154.37 SF PHASE III - OPEN SPACE PROVIDED = 25,545 SF
6
OPEN SPACE REQUIRED = 17,154.37 SF
OPEN SPACE PROVIDED = 25,445 SF
1- OFF-STREET PARKING:
REQUIRED
PROVIDED
PHASE 1- NOT INCLUDED IN MUSP
FOR REFERENCE ONLY - PROCESSING # 070021142
1 BED T.H. = 8 units x 1 space = 8 CARS
8 CARS
1 BED = 16 units x 1 space 16 CARS
16 CARS
1 BED + DEN = 16 units x 1 spaces = 16 CARS
16 CARS
2 BED + DEN = 16 units x 2 spaces = 32 CARS
32 CARS
VISITORS = 56 units / 10 spaces = 6 CARS
8 CARS
COMBINED PHASE IREQUIRED = 78 CARS
76 CARS + 4 H.C. = 80 CARS
PHASE I PROVIDED = 80 CARS
PHASE 11
COMERCIAL = 1/300 GSF FOR OFFICE
330,299 SF / 300 = 1,101 CARS
RETAIL = 11300 GSF FOR RETAIL
TOTAL RETAIL = *15,843 SF
1
' 5,500 SF OF RETAIL TO BE RESTAURANT
15,843sf - 5,500sf = 10,343sf / 300 = 34.5 CARS
5,500sf (restaurant) / 100 = 55 CARS
1,315 CARS + 24 M.C. = 1,339 CARS
COMBINED PHASE II REQUIRED = 1,190.5 CARS
PHASE II PROVIDED = 1,339 CARS
PHASE 111 -{REQUIRES RE-STRIPMG GF SURFACE LWT FROM PHASE 1)
1 BED = 48 units x 1 space 48 CARS
VISITORS = 48 units / 10 spaces = 4.8 CARS
COMBINED PHASE III REQUIRED = 52.8 CARS
-13 CARS (LOST AS A RESULT OF RE -STRIPING)
PHASE I REQUIRED = 78 CARS
80 CARS
PHASE 11 REQUIRED = 1,190.5 CARS
1,339 CARS
PHASE 111 REQUIRED = 52.8 CARS
-12 CARS
TOTAL PARKING REQUIRED = 1,321,3 CARS
"'1,407 CARS
***NOTE: 63 CARS FROM PHASE I & Ili WILL REQUIRE
TO BE PARKED IN THE PHASE II GARAGE STRUCTURE
0 DETAIL (PART 2)
PROJECT DATA SHEET
OFF-STREET LOADING
IREO=4(12'x35'x15')Asper C-1LeadingRep. PROVIDED '2(12'x35'x15')(PH II)
(CAN BE REDUCED TO 10' x 20' VIA CLASS It)
=2(10'x20'x15 )Asper CLASS II(PH II)
=2(12'x35'x15')(PHASE I)""SEE NOTE
=1(10'x20'x15')Asper CLASS 11(PH III)
**NOTE: PHASE I TO BE BUILT AS OF RIGHT _ NOT PART OF MUSP
F.A.R. BR KDOWN CHART
PHASE I1
GROUND LEVEL 48,453 SF
OFFICE LINER LEVEL 2 16,517 SF
OFFICE LINER LEVEL 3 17,512 SF
OFFICE LINER LEVEL 4 17,448 SF
GARAGE LEVEL 4m 321 SF
OFFICE LINER LEVEL 5 17,563 SF
OFFICE LINER LEVEL 6 17,563 SF
OFFICE LINER LEVEL 7 17,512 SF
OFFICE LINER LEVEL 8 23,958 SF
GARAGE LEVEL 8M 352 SF
OFFICE LEVEL 9 32,381 SF
OFFICE LEVEL 10 32,754 SF
OFFICE P.H. LEVEL 11 20,489 SF
OFFICE P.H. LEVEL 12 20,350 SF
OFFICE P.H. LEVEL 13 20,593 SF
PHASE II F.A.R. = 392,776 SF
PHASE 111
GROUND LEVEL 0 SF
LEVEL 2 6,204 SF
LEVEL 3 6,204 SF
LEVEL 4 6,204 SF
LEVEL 5 6,204 SF
LEVEL 6 6,204 SF
LEVEL 7 6,204 SF
PHASE III F.A.R. = 37,224 SF
PHASE I - NOT INCLUDED IN MUSP (FOR REFERENCE}
GROUND LEVEL 3,485 SF
T.N. UPPER LVL - LEVEL 2 14,491 SF
LEVEL 3 11.933 SF
LEVEL 4 11,933 SF
LEVEL 5 11,933 SF
PHASE I F.A.R. = 53,775 SF
COMBINED PROPOSED F.A.R. = 302,776sf (PH -II) + 37,224sf (PH -III) + 53,775sf (PH -I) = 393,775 SF
F.A.R. ALLOWED = 427,829.98 SF
F.A.R. DIFFERENCE OF 34,054.98 SF
PROJECT DATA SHEET
0 DETAIL (PART 3)
ET
PROJECT DATA SHEET
DETAIL {PART 4)