Loading...
HomeMy WebLinkAboutScope of ServicesEXHIBIT B - SCOPE OF SERVICES Including Schedule and List of Subconsultants VIRGINIA KEY MASTER PLAN SCOPE OF SERVICES EDSA INTRODUCTION Due to the City's population growth, coupled with current urban development trends and demands for waterfront access and recreation, the City of Miami , Miami -Dade County and the Village of Key Biscayne, have identified the need for a comprehensive Master Plan study for Virginia Key. In pursuit of this need, the City of Miami, Miami -Dade County and the Village of Key Biscayne, have selected the EDSA Design Team to implement a Master Planning process that studies Virginia Key in its entirety. (See Figure 1: Study Area) The goals for the Master Planning process are to develop a viable waterfront with public open space areas; develop policies for the use of the waterfront; develop and manage the land; and provide for the protection and enhancement of the natural resources with the necessary infrastructure and traffic flow to serve future development within the Marine Stadium Basin properties on the island. Additionally, the proposed Virginia Key Master Plan should emphasize the opportunities for mixed - use waterfront development, including the redevelopment of the properties along the Marine Stadium Basin, integrate and recommend improvements to the existing Sewage Treatment Plant, integrate and preserve the historic Virginia Key Beach Park, as well as make recommendations for future island wide improvements and the protection of the remaining public beaches, parks and conservation areas. Figure 1: Study Area LEGEND: 1 MIAMI MARINE STADIUM BASIN PROPERTIES 2 HISTORIC VIRGINIAKEY BEACH PARK SITE 3 NORTH POINT 4 OLD LANDFILL 5 BEACH AND HAMMOCK 6 SHRIMPERS LAGOON AND CITY WATER TREATMENT PLANT 7 CRITICAL WILDLIFE AND CONSERVATION AREA 8 MIAMI-DADE COUNTY PROPERTY, SEAQUARIUM AND UM ROSENTIEI, SCHOOL 21 SCOPE OF SERVICES TASK ONE: Research and Data Collection The research and data collection work shall include the review of relevant information as well as on - site analysis, initial internal meetings with the City and County star, City and County committees, possible Consultants to the City and County, as well as contacting relevant community and business stakeholders to obtain pertinent data or information as part of the initial data collection for review. 1.01 Professional Survey and Environmental Remediation and Contamination Assessment Plans The City will provide to the Team a cadastral survey and environmental and contamination assessment plans of Virginia Key and its surrounding city -owned submerged lands. The Team will utilize the survey to facilitate the site inventory and site analysis studies required as part of the Master Plan design process and will rely upon its level of accuracy for the Master Planning Process. Please note, the Team will rely upon the City of Miami and Miami Dade County to provide all base information and will utilize existing marine navigational information for all bathymetric information. The Team will rely upon the accuracy of the base information provided and will work in parallel with the remediation RFP goals. Deliverables: • The development of base maps for the survey of existing conditions phase (Task 1.02). 1.02 Survey of existing conditions and Site Analysis of Virginia Key The EDSA Design Team, (hereinafter referred to as the Team), will review pertinent information as well as visit sites and perform site reconnaissance. a. Identify all site elements through drawings and photographs (existing conditions, accessibility, structures, barriers, vegetation and utilities) b. Identify and map environmentally sensitive areas, remediation and contamination assessment plan areas, including past environmental restoration and mitigation sites. c. Identify existing zoning, land use and any existing covenant and/or deed restrictions d. Identify the neighborhoods serving Virginia Key e. Identify existing cultural and historical landscapes f Identify park, school and institutional sites g. Identify all City and County owned land including City and county owned brownfield sites to be reclaimed, or restored, sites currently permitted for environmental restoration, sites recommended for environmental restoration pursuant to the Army Corps of Engineers Section 1135 Planning Process, the county's Biscayne Bay Restoration and Enhancement Program, and/or applicable state programs, marinas and boating infrastructure, etc. h. Identify existing security and safety issues such as lighting, streets and roadways, hazardous and/or abandoned property, etc. i. Identify City and County commission districts and the municipality/UMSA boundary throughout the study area. Also emphasize the distinction between the municipal zoning boundary and the municipal ownership boundary in all areas where these two (2) boundaries are not in the same location. 22 j. Identify community and business organizations serving or having an interest in Virginia Key k Provide analysis of existing site conditions 1. Collect underground records from City of Miami, County Water and Sewer, and all other utilities in the area rn. Investigate infrastructure capacity availability n. Conduct up to 25 (individual) stakeholder interviews with key stakeholders. The Team to rely upon the City for assistance in determining key stakeholders. o. Provide analysis of existing traffic conditions p. Provide analysis of present environmental conditions, remediation plan areas, and issues q. Provide analysis of existing cultural and historical issues r. Provide analysis of existing zoning, land use and any existing covenant and/or deed restriction for all parcels within the study area including the submerged lands (City of Miami to provide maps and information for the submerged lands) s. Provide analysis of existing landside boating infrastructure t. Provide analysis of existing submerged lands including extent of municipality ownership, waterward boundaries of the Bill Sadowski Critical Wildlife Area relative to municipal ownership boundaries, dredged vs. undredged areas, etc. (Per the City of Miami, it will be unnecessary to provide legal opinions regarding this item, additionally analysis will be based on maps and meeting with Miami Dade DERM staff, therefore fieldwork and spatial mapping will not be necessary) Please note, the Team will rely upon the City of Miami and Miami -Dade County to provide all base information and will rely upon the accuracy of the base information provided. Deliverables: Summary Report of above described information in both a graphic and written form. The written form will be incorporated in the Master Plan Report Site Inventory Report and preparation of Opportunities and Constraints Plan 1.03 Research Historic References The Team will become familiar with the historical context of Virginia Key. The goal of the research will include understanding the type, chronological placement and use of the different use areas within the island. The Team, with City and County staff assistance will identify specific preservation group(s) to assist in developing the historical background of Virginia Key. Background information will be used to produce a developmental history of Virginia Key, which discusses, where applicable, the significant architecture, landscape elements and cultural and natural features of the island. Additionally, in conjunction with staff,, the Team will develop a list of individual stakeholders, preservation groups, as well as the other stakeholder groups that can be involved at critical points during the planning process. The Team will, with staff assistance, schedule interviews with stakeholders as part of the research and data collection process. In preparation of these stakeholder interviews, the Team will prepare a presentation that summarizes the history of the area. This presentation will be utilized to facilitate discussion with stakeholders as well as enhance the planning process. Deliverables: • Summary Report of Historic References information gathered. 23 1.04 Review pertinent plans and studies City and County staff will provide the Team with plans and studies as they relate to efforts in the City of Miami and Miami -Dade County: Demographic trends based on the 2000 Census, all pertinent County planning studies, City of Miami Comprehensive Plan, Consolidated Plan, and City of Miami Virginia Key Master Plan of Tune, 1987. The Team will also look at studies such as the Virginia Key Beach Park Master Plan, a site planning process for the preservation and restoration of historic Virginia Key Beach Park, as well as any previous City or County studies or plans to restore or enhance the natural environment, as well as for boating, mooring field, navigation, dredging, marina plans, leases and/or any boating infrastructure for Virginia Key including but not limited to consistency with. state- and federally -approved manatee protection requirements as they relate to this area. The Team will also review any state or federal studies or plans that the City or County provides to the Team, such as the Army Corps Section 1135 Virginia Key environmental restoration plan. Deliverables: Summary Report of pertinent plans and studies 1.05 Environmental Research The Team will research environmental impacts associated with the historic use of Virginia Key, including a focus on the sewage treatment plant, wetland restrictions, endangered/critical habitats, and any other environmental/compliance issues along the Marine Stadium Basin area and the Seaquarium/Rosentiel School area. Research will include a review of regulatory files maintained by the Miami -Dade County Department of Environmental Resources Management (DERM) and Florida Department of Environmental Protection (FDEP), and interviews with DERM/FDEP officials. Additionally, the Team will collect, with City staff assistance historic assessment reports prepared for the Critical Wildlife and Conservation Area, the Historic Virginia Key Beach Park, the sewage treatment plant, and water/sediment quality of Biscayne Bay (in the immediate vicinity of Virginia Key), The Team will review historic information obtained from file reviews of DERM and FDEP records regarding the operation of the old landfill as well as available records related to any environmental investigations and/or interim corrective actions/closure work. It is anticipated that document review will include operational reports, FDEP/DERM inspection reports, Notice of Violations, groundwater and/or soil test lab data, and environmental assessment reports. No testing of soil, sediments, groundwater or surface water will be conducted as part of this project. Deliverables: Summary Report of Environmental Research 1.06 Please see attached Market, Economic, Financial and Implementation Analysis by Economic Research Associates. 1.06 a-c 1.06 d In addition to the ERA Scope, attached, the team will prepare a brief summary on programming and program financing on the following items: 24 • Perimeter/connectivity • Retail (concessions) • Lighting • Security • Sanitation • Horticulture • Site furnishings • Restrooms • Special events programming • Attractions • Lodging (cabanas, motel type, etc.) • Dining 1.07 Traffic Consultant/Analysis The traffic -engineering component associated with the project consists of two (2) parts: a. Existing Conditions The traffic analysis will begin with an evaluation of existing conditions. The existing conditions analysis will document the existing roadway, pedestrian and bicycle network, including access connections, internal site circulation, traffic volumes, and the existing level of service of the transportation network during a typical weekday and a typical Saturday. For this analysis, four -day machine traffic counts will be placed at four (4) locations. The four (4) locations include: 1. Rickenbacker Causeway north of Virginia Key 2. Rickenbacker Causeway south of Virginia Key 3. Arthur Lamb, Jr. Road 4. Virginia Beach Drive Additionally, intersection turning movement counts will be collected at up to six (6) intersections during the four (4) highest volume hour period on both a typical Friday and a typical Saturday. An existing conditions report will be prepared for the project. b. Future Conditions Analysis The second phase of the traffic study will include a future conditions analysis. Based on development plans prepared by the project Team, the Team will evaluate the Master Plan from a traffic -engineering standpoint. Recommendations will be made relative to access, including non -motorized modes, public transportation, and internal site circulation. Future traffic volumes will be prepared for the overall Master Plan. Furthermore, a future conditions report will be developed for the project. The future conditions report will also address other modes of transportation, such as buses, pedestrians, and bicyclists. Deliverables: Traffic Report (Based on existing and future conditions analysis) 25 TASK TWO: Community Public Information Workshop The Community Design phase includes the preparation and facilitation of a public involvement Workshop, and local community meeting for the Virginia Key Master Plan for the City of Miami. 2,01 Local Community Meetings The purpose of the local community meetings is to engage the local community and business stakeholders in the Master Planning process by attending their regularly scheduled meetings. The City of Miami, Neighborhood Enhancement Team (NET) offices will assist the Team in the public outreach efforts to get the community and businesses out to the Public Information Workshops. By attending the local meetings, City staff will keep these organizations involved throughout the planning process which will assist the Team in building a consensus within this very diverse community. To ensure that a cross-section of the populations in the City of Miami and Miami -Dade County are represented, the public will be contacted to participate in the master planning process. Deliverables: • Attendance and preparation for up to twelve (12) organizations meetings 2.02 Community Public Information Workshop The goal of the Community Public Information Workshops will be to inform and engage the community in a discussion regarding waterfront urban design opportunities, conservation and protection of environmentally sensitive areas, traffic issues, cultural issues, historic issues and the design of public open spaces within Virginia Key. The format shall be designed to educate and inform the general public and facilitate discussion regarding the Virginia Key Master Plan, the initial site inventory and analysis as well as the input from City and County staff. The results of the Workshop shall guide the creation and development of the Virginia Key Master Plan. The Team has included up to three (3) Community/Public Informational Workshops. These public Workshops include: Public Workshop #1: Introduction to Master Planning Process and Review of Preliminary Site Inventory and Analysis Public Workshop #2: Presentation of Preliminary Master Plan Alternatives Public Workshop #3: Presentation of Final Master Plan Please note the Team will rely upon City staff for all public notices, advertisements and facility locations. Please note, a Senior Environmental Scientist or Engineer will attend the three (3) Public Information Workshops to address environmental resource issues and issues related to the reuse of environmentally sensitive areas. In order to ensure a successful attendance at the Workshops, the Team recommends the following prior to each Community/Public Workshop: Placement of announcements on the radio with English, Spanish, and Creole speaking radio stations; post banners throughout the community; place both ground signage and posters throughout the community at public places, in windows of local businesses, and in neighborhoods; set up a kiosk/booth at events announcing the Workshops; prepare 26 and distribute flyers announcing the Workshops; and prepare and distribute a community bulletin at Ieast four (4) times during the study process. Deliverables: • Preparation, facilitation and attendance of three (3) Community/Public Information Workshops • Coordination with local media for public meeting announcements • Preparation of temporary ground signage, poster and flyers advertising community/ Public Workshops. Please note the Team will provide an electronic copy of any ground signage, poster or flyers for printing, placement and distribution by the City. 2.03 Generate Necessary Maps The Team will create the base maps needed for the Workshop with the help of the City. The City will assist in this effort by coordinating with public agencies to provide available base information including general graphic information in an AutoCAD or *.dxf format, zoning ordinances, and other regulatory information; and locations of public utilities including drainage, water, sewer and lighting. As part of the base map preparation, the Team will include the preparation of a plan illustrating the existing underground utility infrastructure based on as -built information collected from utility companies and the City of Miami. Deliverables: Base maps necessary for the Master Planning Process TASK THREE: Master Planning Beginning with the Community/Public Information Workshops, the Team will develop the preliminary and final Master Plan, including the design and layout of components that complete the Master Plan. 3.01 Preliminary Master Plan Based on the preliminary project program developed during Task One and from additional feedback from the Community Public Information Workshop and meeting with City and County staff, the Team will prepare up to three (3) Preliminary Master Plan Alternatives. These Preliminary Master Plan Alternatives will include drawings and illustrations (section, elevation and/or perspectives) rendered in color. The Preliminary Master Plan will illustrate the waterfront urban design elements, proposed roadways and parking facilities, park open space and public beach areas, historical and cultural areas, environmentally sensitive areas, pedestrian and bicycle pathways/lanes/linkages, marina and boating infrastructure, wetslips, moorings, drystack, boat ramp, trailer parking, docks, and comprehensive landscape and gateway improvements. As part of the Preliminary Master Plan the Team will also prepare a master utility infrastructure plan for the entire area, including existing and proposed utility improvements. Based on an assessment of the information collected during the environmental research phase and input received from independent environmental reports and during the Public Information Workshops, as part of the Preliminary Master Planning Process, the Team will provide a general recommendation for the redevelopment and reuse of environmentally sensitive areas. For the preliminary Master Plan, it is assumed that the reuse alternatives to be assessed will be limited to active and/or passive recreational uses. This scope -of -services does not include an assessment of commercial, residential, or mixed use alternatives for the landfill. 27 The Team will provide a summary of recommended environmentally sensitive areas, remediation and closure alternatives. These recommendations will be based on: • Potential recreational reuses • Characteristics and extent of identified contaminants of concern (based on DERM and FDEP file reviews and from environmental assessment reports underway. • Existing conditions • Risk assessment for public use, and • State/Federal/County regulatory requirements and restrictions The Team will also provide a discussion of other considerations and issues related to the selection of potential redevelopment alternatives of environmentally sensitive areas, based on the finding of the contamination assessment report (CAR) and Site Assessment report (SAR). In addition to the plans and sketches, a preliminary narrative with budget level cost estimates for implementation will be included. The Preliminary Master Plan's individual program elements and site components shall be evaluated for their cost and ability to be processed for permitting and construction, i.e. feasibility. As a result of the evaluation of costs and analysis of other relevant factors, the proposed program elements and site components will be prioritized. As part of the Preliminary Master Planning Process, each of the up to three (3) alternatives will examine the potential expenses and revenues associated with the Master Plan Alternative, including funding alternatives that will guide the implementation of the reconunended improvements. Deliverables: • Preparation of up to three (3) Preliminary Master Plan alternatives (as described above) • Preparation of illustrative section elevations/sketches/perspectives (up to ten[10]) to illustrate the Master Plan alternatives) • Preliminary Order -of -Magnitude Cost Summary 3.02 Final Master Plan and Implementation Strategy Based on feedback from the Community/Public Information Workshops and City and County staff, the Team will prepare the Final Master Plan. The Preliminary Master Plan and Program will be refined and be the basis for the development of the Final Master Plan. The Final Master Plan will include drawings and illustrations (section, elevation and/or perspectives) rendered in color. The Final Master Plan will illustrate the waterfront urban design elements, proposed roadways and parking facilities, park open space and public beach areas, historical and cultural areas, environmentally sensitive areas, pedestrian and bicycle pathways/lanes/linkages, marina and boating infrastructure, wetslips, moorings, drystack, boat ramp, trailer parking, docks, proposed utility and roadway improvements and comprehensive landscape and gateway improvements. As part of the Final Master Plan the Team will also prepare a master utility infrastructure plan for the entire area, including existing and proposed utility improvements. 28 The Team will provide a technical assessment and provide recommendations for the engineering controls, potential environmental impacts, environmental impact mitigation alternatives, and permit requirements for up to two (2) landfill reuse alternatives. Please note, this Scope of Service does not include any field investigations, testing, preparation of any design documents, or permit applications. As part of the Final Master Plan, the Team will prepare a Phasing Plan. This Phasing Plan will prioritize the proposed program elements and site components, based on the potential options for revenue alternatives, as well as identify a series of strategic actions to promote the successful implementation of the Virginia Key Master Plan. Additionally, a refined narrative with opinions of probable costs for implementation will be included. As a result of the evaluation of costs and analysis of other relevant factors, the proposed program elements and site components will be prioritized. Deliverables: • Final Master Plan • Refined section elevations/sketches/perspectives (up to ten [10]), to illustrate the Master Plan) • Revised Order -of -Magnitude Cost Summary • Phasing Plan with project priorities identified TASK FOUR: Final Documentation The components of the Master Plan shall be combined and presented in a bound final report. In addition, a Website will be created to communicate the results of the final report. 29 4.01 Master Plan Report The Master Plan Report shall serve as a summary of the process and work to -date for this project. Formatted within the Report will be the: a. Master Plan narrative and drawings Deliverables: • Preliminary draft of Master Plan Report (electronic format, printing by the City) • Review and coordination with City staff • Final Master Plan Report (electronic format, printing by the City) 4.02 Preparation, Printing, Copying, etc. of Master Plan Report This is a clerical task to produce electronic copies of the Master Plan Report for the City and County. Deliverables: One (1) electronic copy and two (2) bound hard color copies and one (1) unbound hard color copy of the Mastet Plan Report 4.03 Mounted Renderings The Team will scan the perspective drawings and plot them in color in a larger format, and mount them on foam core boards approximately 24" x 36" in size. Deliverables: Electronic copies of Master Plan exhibits for the City to print and mount (24" x 36" format) 4.04 Virginia Key Master Plan Website and Public Information Flyers/Community Bulletins a. Website The Team will coordinate with City staff and create a website for the project. The goal of the website will be to feature the documentation of the Master Plan report, highlight the public process, and provide a source for public information culminating with the final work products as previously listed. Based on the above, the Team will meet with the City of Miami to discuss strategy and creative direction, for the design and development of the Virginia Key website. Upon conclusion of the strategy discussion regarding the web site, the Team will then outline the message objectives that will drive the design process. The following elements will be evaluated: • The design the visual concept and general tone for the site, and determine the primary elements that will need to be communicated. • The design of the navigation experience via image map technology, etc. using visual images and graphics to lead consumers through the Virginia Key website. 30 • If required, develop a basic link structure for easy constituent access and feedback. Based on the above, EDSA Graphics will complete representative sample website pages along with a corresponding storyboard and will place these sample pages in a private site on the internet to be accessed and reviewed by the City of Miami staff. These pages will convey the overall visual and copy concept that will drive the entire site. Upon completion of the design phase, the Team will work with the City of Miami staff to determine the specific technical requirements regarding web site hosting, location, etc. in order to post the website on the World Wide Web. The Team will provide the necessary set-up and service to have the project website uploaded and hosted on the World Wide Web. We anticipate the website will be hosted on the City of Miami's current web site. As the project progresses and the additional phases take form, the Team will update the website to keep the public informed of the Virginia Key Master Plan's progress. The frequency of these updates will be consistent with the production of the tasks described in Task 1 — 6. b. Public information Flyers/Community Bulletins The Team will prepare up to four (4) color public information flyers/community bulletins to be distributed on a quarterly basis during the life of the planning process. The public information flyers will provide a description of the project background, purpose of the study, project goals and objectives, and issues that need to be addressed. In addition, as the planning process progresses, the public information flyers will be utilized to update the public on the planning process, Preliminary Master Plan Alternatives and Final Master Plan. The public information flyers will be a (four [4] to eight [8] pages) color packet 8.5" X 11" in size and one (1) electronic set in Adobe PDF format. The public information flyers will also be posted on the project web site. Deliverables: • Website, including updates • Four (4) color public information flyers/community bulletins Please note, the Team will rely upon the City of Miami to print and distribute the bulletins, either through the mail, as part of a utility bill or by special mailing. The Team will provide an electronic copy for the City to print. 4.05 Format of Deliverables The Team will provide final work products to the City in the following format: • Graphic documents. One (1) full size plot or print of each drawing, at a scale and size to be determined. Graphic documents will also be included in the Master Plan Report. • Digital scans of the drawings will be provided on a CD-ROM (1 copy). • Written documents. One reproducible and unbound copy of the project summary, printed on paper in an appropriate format. The documents will also be digitally stored in an appropriate computer format, and will be provided to the City on a CD-ROM (1 copy). The report can also be converted into a read-only format (*.pdf), using the freeware program Adobe Acrobat Reader for 31 reproduction by the City. The Adobe Acrobat format is usually "downloadable" from the Internet if posted to a web site. TASK FIVE: Project Administration 5.01 Meetings and Presentations The Team will participate in project -related meetings starting with a meeting with City and County staff' and elected officials, specifically to organize and steer the work -in -progress. In addition to the public meetings associated with the Community Design Workshop, the Team will make presentations to City and County advisory boards and departments to be determined. Presentations of the project's findings to the City and County Commissions will also be required. The Team has anticipated up to fifteen (15) meetings, in addition to the three (3) Community/ Public Information Workshop described above, Deliverables: Preparation and attendance at up to fifteen (15) meetings TASK SIX: Implementation 6.01 Funding and Construction Based upon the accepted Final Master Plan, the Team will expand upon the possible funding alternatives identified in the Implementation Strategy. These funding alternatives may include available grants and matching funds to be utilized for the preparation of design development drawings, construction drawings, documents, permitting and construction of the recommended improvements identified in the Master PIan. More specifically, the Team will refine the previously prepared alternatives within the parameters of the recommendations from the master plan for the potential expenses and revenues associated with the Final Master Plan. As part of the strategic implementation program, the Team will examine revenue sources which may include, but not limited to: 1. Marketing the "adoption" of park elements 2. Seeking in -kind capital and expense contributions by local corporations 3. Generating revenues from the use of appropriate portions of Virginia Key for public and private events 4. Assist staff by providing recommendations for specific development components that may be included in a future Request For Proposal (RFP). The goal of the potential revenue sources is to produce capital and expense revenues that would allow the City of Miami to expand Virginia Key programs for the public. The expense and revenue alternatives would guide the implementation of the recommended improvements. peliverables: • Summary memorandum (to be included in the Master Plan Report) outlining a strategy for potential expenses and revenues associated with the implementation of the Master Plan. 32 TASK SEVEN: Additional Services In addition to the above described services, the Team, per the direction of the City of Miami may provide additional services associated with the Master Plan. Although currently not specifically described, these Additional Services may include: 1. The preparation, assistance and coordination of a public/private Request for Proposal/Qualifications for a public/private partnership for development on Virginia Key, based on the completed and approved Master Plan 2. Design Development drawings , Detailed Design , Construction drawings and Administration Services associated with a priority public improvement project 3. Additional meetings above the described meetings/presentations in Tasks One through Task Six 4. Printing and distribution of bulletins, flyers, etc. associated with the public consensus building process 5. Printing of drawings and/or reports, as described above in Tasks One through Six 6. Other services associated with the Planning and Implementation of Virginia Key as requested by the City of Miami Please note the above list describes potential Additional Services only. Upon request by the City of Miami, the Team will prepare a specific Scope of Services and fees for review and approval by the City of Miami. Additional Services will not be provided unless properly authorized by the City of Miami. G:1Projects'DC\PROPOSED PROJECTS\(PDK) Virginia Key \Administration\Contract\EDSA FINAL_SCOPE_ATTACHMENr_A_090605 doc 33 VIRGINIA KEY MASTER PLAN MARKET, ECONOMICS AND FINANCIAL ANALYSIS In coordination with EDSA, Master Planners and Prime Consultant by Economics Research Associates Washington, D.C. 34 VIRGINIA KEY MASTER PLAN Market, Economics, Financial and Implementation Analysis Introduction Economics Research Associates (ERA) is pleased to submit the following Proposed Scope of Services to the Department of Planning, City of Miami to provide Market, Financial and Implementation Analysis for the Virginia Key Master Plan. We understand that the Master Plan prime consultant will be EDSA, and that ERA's proposal will be performed as a sub -consultant to EDSA as part of the overall Master Planning process. The proposed Scope of Services detailed below has been developed in response to the original Request for Proposals issued by the City of Miami, Miami -Dade County and the Village of Key Biscayne, and based on discussions with key City staff responsible for the Master Plan. ERA's Scope includes the elements in the RFP as well as a more detailed description of the process and methodology to be used by ERA in completing the work. The proposal and budget are based on the following assumptions: • EDSA, Prime Consultant for the Virginia Key Master Plan will serve as project managers, administrative manager and consultant coordinator of the project. • EDSA will direct the process (with assistance from ERA and other subconsultant specialists), and will be responsible for contracting, billings and payments, and general contract administration. The project schedule for the consulting process is anticipated to be one year, including data collection, synthesis of all non-economic/financial and other components included in ERA's Scope of Services, organization and scheduling of meetings, public workshops, public outreach activities, development and refinement of Master Plan alternatives and the preparation of the Final Master Plan document to be completed within 12 to 18 months of execution of ERA's contract and project initiation. ERA will focus on the tasks described below, and will provide supporting participation in accordance with these tasks in our Scope of Services. ERA will provide consulting assistance and work products through EDSA, and in response to the proscribed project schedule (incorporating project coordination meetings, public workshops and completion of deliverables). 35 Introduction The following Scope of Services responds to Section 1.06 of the Virginia Key Master Plan Request for Proposals, as well as to ERA's discussion with the City of Miami: The tasks and deliverables incorporate both RFP requirements as well as our understanding of the characteristics, conditions and environmentally sensitive areas of Virginia Key, while acknowledging the historic, economic, and educational roles that the island can plan through carefully selected development opportunities. 1.06 a Factors Affecting Development ERA will meet with the City of Miami and EDSA, as well as other identified stakeholders to explore factors affecting development of Virginia Key. These factors may include (hut not be limited to) the following: • Environmentally sensitive areas (such as conservation sites and the manatee breeding area) • Educational and institutional uses such as NOAA and the U.S. Fisheries facilities, the University of Miami Rosentiel Center, the Miami Seaquarium and other public and non-public educational/research sites on Virginia Key • Virginia Key Beach Park and the role played by the Historic Virginia Key Beach Park Trust (as well as the proposed museum facility associated with the historic park) • The Marine Stadium and its re -use opportunities • Through -island traffic going to and from Key Biscayne and its impact on Virginia Key's environmental and market issues • The Marine Basin and other marine/conservation wildlife areas • The landfill, and how it might be better used • Public beaches on Virginia Key • Market and traffic implications of the existing marina, its restaurant, and the Rusty Pelican restaurant • Other issues identified by the client group and EDSA's environmental and other mapping and analyses 1.06b Economic Viability ERA understands that existing and potential uses on Virginia Key must meet a number of tests, not the least of which is scale and environmental appropriateness. However, ERA also recognizes that the island has a number of public facilities that provide educational, recreational, and environmental learning experiences to the general public, and that a careful balance must exist for all interests in Virginia Key to be served in ways that will not compromise the island's unique role in the Greater. Miami. Current leased facilities (such as the marina and waterfront restaurants), could be complemented by introducing low -scaled, environmentally oriented lodging facilities and other supporting facilities. These facilities must meet both the test of appropriateness for the scale and environmental sensitivities of Virginia Key; prove to be economically and financially viable for both the operators of these facilities and for the City; and meet the needs of the County and the Village of Key Biscayne. ERA will work closely with the City and EDSA to review and analyze site constraints, including: • Transportation access 36 • Site visibility (which may vary by location and priority) • Adjoining/surrounding uses • Site size • Ownership patterns (both public ownership, stewardship relationships and concerns/priorities of private interests) • Site configurations (proximity to roads, waterfronts, environmentally sensitive areas, redevelopment areas such as the landfill, etc.) • Infrastructure conditions, requirements and needs (as identified by EDSA and the client group) as they might affect limited development • Necessary site work and infrastructure improvements • Other site conditions identified in the EDSA/stakeholder analysis Based upon these site characteristics and the team's analysis of their affects on the Master Plan, ERA will complete a market analysis of current and projected markets; analyze the economic performance of existing commercial facilities on Virginia Key; and determine the economic viability/feasibility of projected future components on Virginia Key. The overall economic viability of current and/or potential revenue generating components determined to be appropriate for Virginia Key will be researched and analyzed. ERA's conclusions about potential economic viability will be included in an economic model that addresses the individual uses listed below; Marine Basin Properties -- ERA will complete a market analysis and economic study of the Marine Stadium and its potential for re -use and re -programming. ERA will work with data provided by EDSA and the client group to determine the necessary reconstruction and repairs necessary to make the Stadium usable, and review the types of programming that might attract attendance to events at the stadium. The identified opportunity will then incorporate analysis of the potential to either offer an operating concession for events management in the Stadium, or to provide food and beverage and other concessions in a Stadium facility operated by a public or governmental entity. ERA will also analyze the factors which might suggest provision of another facility on the site, should existing damage caused by Hurricane Andrew be more than can be supported by additional revenues and/or private investment by an operator. The Marina — ERA will complete a market analysis of demand for marina space and services in the Biscayne Bay/Miami area, including permanent slips, dry storage (including condominium storage similar to the recent boat storage project in Dania Beach, Broward County), transient slips, boat repairs and maintenance, and other commercial marina services. ERA will conduct interviews with selected/relevant marina operators in the region (including on neighboring Key Biscayne) to develop estimates of market -based pricing, occupancy levels, seasonality, demand trends for slips and storage (including drystack facilities), market profile of marina customers, and other operating and market characteristics which will affect feasibility and market viability for the Virginia Key marina facility. ERA will also assess the role and impact that the marina and the site's boating infrastructure can have on other mixed uses on Virginia Key. Our findings will included recommended alternative development options for the Marina Basin and surrounding area and recommendations regarding marina size, size and mix of slips, management structure and projected potential revenues to the City of Miami or other public sector entities. These recommendations will also evaluate the level of required investment in order to reach the determined level of economic potential. 37 Park Programming and Revenue/Expense Analysis - Based on the environmental and physical conditions analysis prepared by EDSA as well as an analysis of the potential program for the Park, ERA will complete a comprehensive review of economic potentials for a range of park components. The analysis will primarily focus on revenue generating uses, services and market needs, as well as comments on physical elements that will affect the market viability and operating costs for the park program. Primary park programming uses will include: • Retail concessions • Dining/food and beverage operations (seasonal and permanent, stand-alone operations such as the Rusty Pelican and `supporting' food and beverage linked to other uses such as beach activities, environmental education, the marina, outdoor recreation, etc.) • Lodging facilities (especially environmentally -oriented lodging operations ranging from rustic camping sites through specialized facilities such as those developed by the National Park Service in St. John's, USVI or eco-tourism resorts in Costa Rica and other locations) • Special Events Programming (such as might be held in the Marine Stadium, the Seaquarium, at the landfill, or other locations) • Attractions/destination uses such as the Seaquarium, waterside dining areas, Historic Virginia Key Beach Park In addition to analyzing the market for each of these five uses, ERA will also assess the revenue generating potential and economic viability of each use. To the extent that other elements will affect the viability of these uses, ERA will also work with EDSA and the client to analyze and provide comments and guidance to the client on existing conditions and needed improvements affecting net revenues to the City of Miami for supporting elements including: • Lighting • Security • Sanitation Facilities • Horticulture • Site Furnishings • Restrooms The conclusion of this analysis will be a prioritized description of market -feasible uses that will form the potential program for the Park. Based on data provided by EDSA and the client, ERA will incorporate order -of -magnitude costs for needed/required capital investments that will affect the long- term viability of the programmed uses for the park. The potential uses of funds needed to implement the program will then be arrayed against selected sources of funds, including both revenue generation potentials (e.g., sales, lease revenues, service fees, concession fees, sales and ad valorem taxes generated, etc.) as well as non -governmental funding (e.g., charitable and institutional involvement, corporate and other sponsorship and/or underwriting opportunities, and other non -governmental resources. In particular, ERA will focus on how partnerships and public/private interests can intersect with capital investment programs; reinvestment and maintenance needs and planned replacement reserve budgeting to maintain Virginia Key at the highest level of quality and service. The conclusion of this task will be a comprehensive analysis of projected operating expenses by category (and, as available, by site or location) and capital expenditures (based on data provided by EDSA and the client group) in order to determine the magnitude of the net economic opportunity as well as projected ongoing operating costs, replacement and maintenance funding, etc. 38 1.06c Fiscal and Economic Impacts - The program of uses determined in the preceding task will serve as the basis for completion of both Economic and Fiscal Impact analyses for the park. The mixed -use program elements, recreational and attraction activities and public facilities provided on the island will be incorporated into an economic impact of jobs created or maintained as well as the impact of construction spending on materials and construction jobs and other construction -related investments. Using cost data provided by EDSA and the client group, ERA will also structure a fiscal impact analysis incorporating public capital investments needed to implement the program and project net positive (or negative) revenues which might be expected to result from implementation of the program. The fiscal and economic impacts will follow the methodology and format used by ERA in our economic analysis practice, and will be consistent with industry standards for both categories of impact analysis. Recreational Opportunities and Demand Survey — ERA will work in collaboration with EDSA and the City of Miami to develop a survey instrument to be used to research and develop a better understanding of the recreational opportunities and demands for Virginia Key. As a local and regional public asset, Virginia Key has many advocates, interest groups and stakeholders; but it also has a role to play in the greater recreational and educational needs for the entire region. The intent of the survey instrument will be to gauge the level of understanding of the value of the resource, determine the level of sensitivity resulting from related uses (such as proximity of the marina and related boating activities to the manatee breeding ground, for example). ERA will provide advice, input, and documentation for development of the potential survey instrument, review of the instrument with the City, preparation of the Final Survey Instrument for approval by the City of Miami. Working with the City and team, ERA will also advise and comment on the proposed survey distribution methodology (such as a water bill enclosure, Internet/e-mail survey, etc.). Based on the data collection and analysis of the survey results (and assuming cross tabulation of survey data by others), ERA will also participate in preparation of a summary memorandum of survey results. ERA recommends that the Virginia Key team approach the survey process through inclusion of a survey and research firm, either from the Miami area or based on our experience with other firms, from another East Coast location, to provide specific expertise in survey instrument design for cross tabulation, distribution methodologies and statistically valid sample sizes, cross tabulation and analysis of survey results, adequate response determination and other factors to assure that the survey process will generate the type and quality of information needed for the Virginia Key Master Plan. The budget and schedule for this task will assume that distribution of the survey will be completed by the City of Miami. The cost for inclusion of a survey firm and its participation in the Master Plan process is not included in ERA's budget Schedule — ERA anticipates that the Virginia Key Master Plan will be completed over a 12-month period, working in concert with EDSA and the client group/City of Miami. The process does not include extensive public meetings, although ERA will meet with selected stakeholders and institutional participants such as NOAA, University of Miami, and others to complete the study. ERA's fees for this project includes reimbursable expenses and assumes that it will be possible to schedule site work, stakeholder meetings, etc. in conjunction with ERA's other work in the Miami area in order to reduce travel costs allocable to the projects. 39 Mr. Tom Moriarity, Vice -President of ERA, will serve as the Principal -in -Charge of this assignment, responsible for the overall direction of the project and the delivery of our services. Mr. Bill Owens, Senior Vice President in our Washington office, and one of the firm's recreational specialists; will serve in a key advisory role on the project. Mr. Tom Lavash, Senior Associate, will serve as ERA's senior project manager and day-to- day firm contact. 40 STANDARD PROPOSAL ADDENDUM Economics Research Associates It is understood by the client that Economics Research Associates (ERA) can make no guarantees concerning the recommendations that will result from the proposed assignment, since these recommendations must be based upon facts discovered by ERA during the course of the study and those conditions existing as of the date of the report. To protect you and other clients, and to assure that the research results of ERA's work will continue to be accepted as objective and impartial by the business community, it is understood that our fee for the undertaking of this project is in no way dependent upon the specific conclusions reached or the nature of the advice given by us in our report to you. It is agreed by the client that the report is not to be used in conjunction with any public or private offering of debt or equity securities without our prior written consent. It is further agreed that the client will indemnify ERA against any losses, claims, damages and liabilities under federal of state security laws that may arise as a result of statements or omissions in public or private offerings of securities. It is agreed by the client that payment for the services of ERA is due upon receipt of the invoice; that full payment is due upon receipt of the completed report; and that ERA has the right to withhold delivery of the final report pending receipt of any overdue payments. In the event any invoice is not paid within thirty (30) days after rendering of the invoice it shall commence bearing interest on the date the invoice was rendered at the rate of 18 percent per annum (or such lesser rate as may be the maximum interest permissible under applicable law), and the client agrees to pay all accrued interest, together with the charges for services rendered as provided for in this agreement. In addition, should an unpaid invoice be referred to our attorneys for collection, the client agrees to pay their reasonable fee for such work, as well as any costs of suit that may be incurred. It is further agreed by the client that the report will be presented to third parties in its entirety and that no abstracting of the report will be made without first obtaining the permission of ERA. It is understood by ERA that the findings of this report are the proprietary property of the client and they will not be made available to any other organization or individual without the consent of the client. This proposal will remain in force for a period of sixty- (60) days from the date shown herein Subconsultants: Applied Technology & Management (ATM) Biederman Redevelopment Ventures (BRV) Camp, Dresser and McKee Carter + Burgess Consul -Tech Services, Inc. Economic Research Associates REG Architecture Sheryl Dickey Consulting Services 41 42 EXHIBIT C — COMPENSATION Pursuant to Resolution No. 05-0606, adopted November 3, 2005, in a total amount not to exceed $ 775,000.00: 1. Upon execution of Agreement on , 200_: the total fees shall not exceed Seven Hundred Twenty Five Thousand, Six Hundred Twelve Dollars and No/Cents ($725,612.00) 43 EXHIBIT D INSURANCE REQUIREMENTS PROFESSIONAL SERVICES AGREEMENT Edward D. Stone, Jr. and Associates, Inc. d/b/a EDSA I. Commercial General Liability A. Limits of Liability Bodily Injury and Property Damage Liability Each Occurrence General Aggregate Limit Personal and Adv. Injury Products/Completed Operations Endorsements Required $1,000,000 $ 2,000,000 $ 1,000,000 $ 1,000,000 City of Miami included as an Additional Insured Employees included as insured Contractual Liability Independent Contractors Coverage Waiver of Subrogation II. Business Automobile Liability A. Limits of Liability Bodily Injury and Property Damage Liability Combined Single Limit Any Auto Including Hired, Borrowed or Non -Owned Autos Any One Accident $ 1,000,000 B. Endorsements Required City of Miami included as an Additional Insured Employees included as insured III. Worker's Compensation Limits of Liability Statutory -State of Florida Waiver of Subrogation IV. Employer's Liability A. Limits of Liability $100,000 for bodily injury caused by an accident, each accident $100,000 for bodily injury caused by disease, each employee $500,000 for bodily injury caused by disease, policy limit V. Pollution/Environmental Liability A. Limits of Liability Each Occurrence $1,000,000 General Aggregate $2,000,000 VI. Professional Liability/Errors and Omissions Coverage PROJECT SPECIFIC COVERAGE Each Claim General Aggregate Limit Deductible- not to exceed 10% $ 2,000,000 $ 2,000,000 The above policies shall provide the City of Miami with written notice of cancellation or material change from the insurer not Less than (30) days prior to any such cancellation or .material change. Companies authorized to do business in the State of Florida, with the following qualifications, shall issue all insurance policies required above: The company must be rated no less than "A" as to management, and no less than "Class V" as to Financial Strength, by the latest edition of Best's Insurance Guide, published by A.M. Best Company, . Oldwick, New Jersey, or its equivalent. All policies and /or certificates of insurance are subject to review and verification by Risk Management prior to insurance approval. 45 EXHIBIT E - CORPORATE RESOLUTIONS AND EVIDENCE OF QUALIFICATION TO DO BUSINESS IN FLORIDA 46