Loading...
HomeMy WebLinkAboutExhibit3PIRTLE CONSTRUCTION COMPANY ADivosioN orjous B..PIRTLE CONST1RVCT1ON Cal INC., DESIGN BUILDERS CONSTRUCTION MANAGERS • GENERAL CONTRACTORS 4740 PAM E 120Ali / nAy1E, 'FLORIDA 14 / 13kOWARD (954)397..-04 JD / DADE (305) 944-226,21 l'AJC(9S 4) 7974030 THELITTLE.RAUIMARKETPLACEI.EXTERiOR RENOVATIONS MIAMI, FLORIDA Scope of Work Clarifications, Inclusions and Exclusions The following ate qualifications and exclusions to this Proposal cost Estimate and shall be. incorporated into the project and take precedence over the -scope verbally agreed upon with Mike Tyler .and Pirtle COnstitictiOn.,Co., flIaI Coifdifiotist 1) Art allowance of $6.;000 has been allocated for traShdutopster`s. !tithe event we eXceed this •amount the difference will be reirnbursed based on back up invoices. --aP 2) it is assumed all.permit fees will be waived, :tiIVISION 6: Carpentry; 1) Fri:Wide all labor -and material necessary to complete the exteriorwood work repairs of the soffits, fascia boards, wall lattice, wood work deSign, and all exterior wood trim 2) Remove and replace all existing woodwork, .soffits, fascia boards and wall lattice. 3) FurniSh andinstalt new presSure treated 2rx12" fascia and 1"xl" roof drip edge. 4. ( r 11.4E 4) ,Ftitiiiab plywood.soffit. 5) Furnish.andinstall wall lattice 01141"x-4" pressure treated wood trim. 6) _Furnish -and install missing wood design to match. existing. 7) Remove and dispose of two air conditioner compressors and stands. 8) Remove existing Second floor door andblock up opening.. 9) IndlUdes all eqtiptnert and scaffolding reqUired for this scope of work. • 10) Does )1Cit include replacenicnt.of structural rafters -above soffit plywoOd. 7 1/.o9fIng: 1) Includes tear off and removal of existing flat roof system and existing •skylights. 2) Includes installation of new skylights. 3) :It is aSsurried the ,existing connection pipe between:the scupper and conductor -head can be 4) :InCludes 410 linear feet of gatvaniZed gutter and 380 linear feet of gitvaniZed downspout. 5) It is assumed the. Substrate under the tkistirig flat roof it structurally sourid and able to support the new flat roof system and skylights includinglurricane loads 6) 'Does notinolude any engineering,asbestos testing, drainage calculations, or pull tests. Litom-taiti cultural Center G.M.P. Page 1 of 2— PIRTLE CONSTRUCTION COMPANY A DrViSioN PIRTLE'CONSTRU.CTIONCOIC, DESIGN BUILDERS : • CONSTRUCTION MAN A:GERS • :GENERAL CONTRACTORS 4740rbisvi ROAD / i:AV16,:FLOR1 DA 51314 /i3ROWARIJ(”0 7914)410 /DADE. (30)9124.'2:262 if fAX (954) 797'630 OrYlgiON g: 1) Includes the removal and replacement of five existing hollow metal doors and three frames at Ale east elevation if -landing hardware. DTVISION 9: Stucco: 1) Sound walls and remove looseexisting stucco finish including any remaining exterior 'W4111sPcit. 2) Pressure wash .surface with high preastre Water to rerrioYd. a* 166§6 pint ) Provide bonding. agett.Wall )..frfate't0 receive heW-$4);eCo. fimsh 4) Ptovidelath and brown -into -areas f:removed stucco tqrpstore hasplane: 5) .ProvideAmico vinyl angle banding bead produce raised stucco exterior; wainscot of 1 '8' total thickness with fopstep of M" total thickness. 6) Re -stucco existing masonry walls to bottom ofsOffit with 1/P of new stucco With float firtish. 7) No bther -raised -banding is ineltided. Yaintinv 1,) Includes pressure washing; priming, and painting of the building exterior with up to six .colors. DIVISION 15; Pluin1) Furnish nd rnstall two (1) 4" Josain.21504,6 'roof chains w1i no-hpb-east iron piping run Ikon& the exterior. wall and down to 6" above grad. Little Haiti Cultural Center Puge / of