Loading...
HomeMy WebLinkAboutSpreadsheetCrowd Management Personnel Instructions: The purpose of this spreadsheet is to provide a format for bidders to provide a detailed and complete breakdown of its' labor coat payroll burden, liability cost, operating expense, and profit determining the total cost per hour bid price. This Is necessary to ensure that the bidder Is complying with the City of Mlaml Living Wage Rate, which is applicable to this bid, and to calculate future Living Wage Rate Increases to the awarded lowest responsive and responsible bidder's bid price as required by the Living Wage Ordinance. Ths current living wage rate is $10.92, with a health benefit plan, and $12.17, without a health benefit plan. Bidder is required to only fin the gray shaded fields. At other fields are protected and can not be altered. Slider is able to find Instructions/comments under those fields where the red indicators are boated by placing the cursor In those cells. Number of Hourly Estimated Daly Moths Total Labor Cost Cla9eHteatlontPoeltton ositlons W .. Per Posttlon Labor Cost Per Dr( Per Position !;•a1f4ED i F TA 5t i W, Crowd Management Personnel for Bayfront 1 Park Management Trust 1 s _% 4 $43.68 516.% Crowd Management Supervisor for Bayfront 2 Park Management Trust 1 `:" 4 343.68 516.62 Crowd Management Personnel for Orange Bowl 3 Stadium 1 ! 4 $43.68 516.52 Crowd Management Supers or for Orange Bowl 4 Stadium 1 4 $43.68 516.52 Craw Management and Parking Services 5 Manager for Bayfront Park Management Trust 1 i=' 4 343.68 $16.52 Craw Control and Parking Services Manager 6 for Orange Bowl Stadium 1 4 $43.68 *16.52. "PAYROLL BURDEN" NOTE: SEE ADDITIONAL WORK SHEET(S) BELOW LABOR COST PER DAY PAYROLL BURDEN (%) PAYROLL BURDEN (8) LIABILITY (%) LIABILITY ($) OPERATING EXPENSE (%) OVER LABOR OPERATING EXPENSE (8) S262.08 26.28% 568.87 13.00% 34.07 24 PROFIT (%) OVER TOTAL COST PROFIT (8) OVER TOTAL COST Parking Services Peraonne( 537.03 Instructions: The purpose of this spreadsheet is to provide a format for bidders to provide a detailed and complete breakdown of its' tabor cost, payroll burden, liability cost, operating expense, and profit determining the total coat per hour bid price. This is necessary to ensure that the bidder is complying with the City of Miami Living Wage Rate, which is applicable to this bid, and to calculate future Living Wage Rate increases to the awarded lowest responsive and responsible bidders bid price as required by the Living Wage Ordinance. The current living wage rate Is $10.92, with a health benefit plan, and $12.17, without a health benefit plan. Bidder is required to only f81 the gray shaded fields. All other fields are protected and can not be altered. Bidder Is able to find tnstrrrctionslcomments under those fields where the red Indicators are located by placing the cursor in those cells. "PAYROLL BURDEN" ,14q.u9V5 z-mIntyti-z4 n55115 awe .c9=tt 1154 Pt5.4,5Ato C15-5514anjakfF5454.51i5.5 Pqtrtinem Vfaij VILKLS41-1?.._Tlclir&Pr PC14490M€�S FVFA 1%) . 316 52 LABOR CO&T PER DAV PAYROLL auRDEN P A'Y'RQI‘ -601-4DEN ft) LA LT iy41 tjAalUTY t4) oPENAIM,4 YYXPtNSE OVIE0 L-4.00,14 opERATING 'eXPE1455551-11 .1.0.Aki*O.:M4t44510t4WAti.V.PPAT.WifilMtOWS:00 OAR TOTA,, CO'41- pr▪ iOrTcJ4O4.t. ,Owt S51.55