Loading...
HomeMy WebLinkAboutResumeConst uc6cn & Dena SeMces Inc. Advance Constriction Experts Resldontiol ' Commercial ' Industrial 160 N.W.176'th. St Suite 303 Miami, FI. 33169 Ph. (305)770-4457 FAX (305)770-1702 IVER E. WILLIAMS PRESIDENT EDUCATION RESUME Miami Dade Community College Miami, Florida Associate Science Pre -Architecture Design University of Miami School of Architecture Coral Gables, Fi. Bachelor of Architecture PROFESSIONAL FLORIDA STATE GENERAL CONTRACTOR LICENCE: EMPLOYMENT Joseph ildiddlebrooks and Associate, INC. 6480 S. W. 62nd. Avenue, South Miami, Florida 33143 Position: Design Consultant, Project Manager PROFESSIONAL AFFILIATION Jimmy Allen and Associates P.A. 5940 SW 73 STREET SUITE 201 SOUTH MIAMI, Fl. 33143 Position: Design Consultant, Project Manager Ronald E. Frazier And Associates, P.A. 2125 BISCAYNE BLVD. Suite 330 Miami, Florida 33137 Position: Design Consultant, Project Manager Belton and Taylor Architects, INC. 13200 SW 128 Street BLDG. "G" Miami Florida 33186 Position: Design Consultant, Project Manager Uniform Building Code Inspector Certify (UBCi) PROFESSIONAL Mr. Williams has accumulated a vast amount of experience as EXPERIENCE a Construction project manager, both in the private sector as well as the public sector. -1- RESUME CONTINUE: KEY PERSONNEL Mr. Williams has been involved in project ranging as follows: Residential, Commercial, industrial, Institutional and Governmental. Mr. Williams capabilities includes the designing and production of contract document and construction supervision for Residential facilities, Commercial facilities, Recreational facilities, Industrial and Religious complexes. Mr. Williams experience as Construction Project Manager includes: Program Development, Design Development, Preparation of Contract Documents, Bid Negotiations, Cost Estimating, Specification Writing, Construction Administration, Site inspections. RECENT Cargo Building 2205 40 Million PROJECT Phase l and 11 Dade County Aviation Dept. American Airlines (1996) North Terminal Expansion 38 Million Phase IIi Dade County Aviation Dept. (1996) North Twin Lakes Elementary 4 Million Additions and renovations Dade County Public Schools (1996) In -transit Lounge For 1.3 Million American Airlines I Dade County Aviation Dept. (1997) Cargo Building 2218 15 Million Dade County Aviation Dept. (1995) North side Family Center 2.5 Million The School Board of Broward County • (1993) - -2- RESUME CONTINUE: KEY PERSONNEL Women`s Detention Center 2.5 Mllion Addition to: Metro Dade County, Miami, Ff. (1993) Dade County State Attorney Office Building Miami, Florida (1992) 15 Million Jones Senior High School 10 Million Addition and Renovations Orange County Public Schools (1993) Orange County Fire Stations Hunter's creak Orlando, Florida (1994) 10 Million Bible Missionary Baptist Church 1.2 MILLION 9801 NW 24TH AVE_ MIAMi, Florida (1991) Liberty City Church of God 50 THOUSAND 1781 NW 66TH STREET. MIAMI, Florida (1996) Cosmopolitan Baptist Church 1.5 MILLION 9801 NW 24TH AVE. MIAMI, Florida (1991) Brownsville Missionary Baptist Church 1.6 MILLION 4600 NW 24TH AVE. MIAMI, Florida (1997) "REFERENCES LETTERS iF REQUESTED" RESUME CONTINUE: KEY PERSONNEL KEY PERSONNEL: PROJECT MANAGER Charles E. Serig, / WA Associate Registration: Florida Education: Bachelor of Architecture Louisiana State University, 1986 Mr. Seri& over 10 years of experfence irr arroort facilities planning. Programing and design He has worked on a variety of airport, terminal studies, expansion and renovation projects at a number of airports including Miami International Airport, Palm Beach International Airport, FL. Lauderdale - Hollywood International Airport ar7d Southwest Florida International Airport. in FL. Myers, Florida. Mr. Serig served as a project architect for an Improvements Bid Package for Pan American Airlines. Concourse 'F' at Miami International Airport. The improvements package included planning a total furniture package, designing and detailing specific user -oriented equipment and fixtures, designing passenger service desks, flight information display systems, LE.D, sign age and graphics and custom furnishing and lighting. He was also the project manager for a remodeling and renovation of Concourse 'B' at Miami international Airport, which converted gates 82 and 84 from domestic to international use while maintaining the use of the gates for domestic flights. He served as project architect for Pan AM's 10,000 square -foot Ground Services Equipment and Mail/Cargo Facilities. This project included Three vehicle service and maintenance bays with support shops and offices, bulk mail 1 staging and storage areas and a shipping receiving area. As project architect. he also directed the design and documentation of Pan Am's 3,000 square -foot Agent Coordination and Meal Top -Off facilities. which included a flight kitchen and flight agent computer room. Mr. Serig also directed the design of a 13,5000 -4- RESUME COiVTINUE: KEY PERSONNEL square -foot Rarnp Services Facility for Pan American Airlines at Miami international airport, which include offices, training rooms, lodkers and assembly areas. He provided various schemes for approval, prepared all documentation and managed the project through construction administration. Mr. Seri& was the design architect for the Palm Beach international Airport south side F.I.S. facility for U.S. Customs and Immigration. He also served as project manager for the FAR Part 107, security improvements and communications remodeling of the airport's Communications & Central Control facility and the Airport Operations offices. He also participated in the preparation of conceptual designs for the Kansas City International Airport terminal area master plan and the L.B. Pearson international Airport sign age and graphics package in Toronto, Canada. Mr. Seri& was involved in the planning, programming and design of the new 52,000 square -foot FIS facility and commuter terminal expansion at Fort Myers, Florida, and later as project manager, completed the design documentation and construction administration for the project. Mr. Seri& served as the project manager for several terminal renovation projects for U.S. Air at Fort Lauderdale -Hollywood International Airport which included removal of six passenger loading bridges at concourses "C" and "F"_ gate modifications, installation of three new apron drive units and three refurbished radial drive bridges. The work involved design, documentation and construction administration of structural foundations, pre- conditioned air, 400 Hz ground power, apron marking, safety and maintenance of traffic plans. He served as project designer for a two story 28,400 -5- RESUME CONTINUE: KEY PERSONNEL square foot administration building for the Palm Beach County Water Ufil,.ties Department. The facility included offices. classroorris/training rooms, computer room, telemetry control room, conference areas, lounges and an administrative wing. Mr. Seri& served as the field architect for the construction and administration ..,f a 214,000 square - foot cargo building at Miami International Airport. The project requires extensive coordination with four other ongoing and adjacent construction projects, landside and air side construction, roof top parking, aircraft apron construction and coordination with numerous regulatory agencies. Mr. Seri& is presently the project manager of the D-E- F Wrap Terminal Expansion Package WC" project at Miami International Airport which includes the relocation of concession space. addition of a fourth terminal level, additional FIS space and new building construction onto the existing apron between concourses "D" to "E" and "E" to "F." Total project duration is expected to be seven to eight years from program verification/design through construction administration at an estimated cost of over $ 330 million. REFERENCES: Wilt be available upon request. -6- RESUME CONTINUE. KEY PERSONNEL KEY PERSONNEL: PROJECT MANAGER: ELADIO (ED) GONZALEZ CAREER OBJECTIVE: EDUCATION: PROFESSIONAL LICENCE: WORK EXPERIENCE; A Position with opportunity for involvement and growth. Desire type of work such as planning and development, project engineer, estimating, supervision, coordination and project Management. FLORIDA IN T ERNATIONAL UNIVERSITY, Tamiami Trail, Fl 33199, Receive Bachelor of science in Construction management, Miami Dade Community College, North Campus, 11380 N. w. 27th Ave, Miami, FI. 33167; Received Associate in Arts and Associate in Science in Building Construction, Technology. Miami Senior High SCHOOL., 2450 S.1,4. 1st,. Miarni, Fl. 33135; Receive High School Diploma and Certificate in Air Conditioning, Refrigeration and Heating Mechanics, Florida State General Contractor, Florida State, Real State Broker, BELL ON & TAYLOR ARCI-11TECTS 11020 North Kendall Dr. Suite 200, Miami, Florida Position: Architect/Engineer Field Project Representative. Assign to the American Airlines Cargo Building #2205/7.14 Phase I at Miami International Airport in Miami Florida. The Building is a concrete structure which includes a gross ground floor, square footage of 221,095 and 36.262 square footage of mezzanine offices and ramp which allowed roof parking. 1 am responsible for the work site services as a full time -7- RESUME CONTINUE: KEY PERS ONNEL representative providing daily detailed reports, preparing work orders, evaluating contractor pay requisitions, receiving shop drawing and request for information. inspecting and monitoring work in place and in progress for compliance with the contract documents, coordination of project related meetings and maintaining Various control logo. E & G CONSTRUCTION SERVICE CORPORATION, 12237 S.W. 132 Ct. MiAMI, Florida. Position: Construction manager. Responsible for the company , overall function, Office administration scheduling, cost control, buy-out estimating, coordination of all subcontractors, field supervision and inspection of properties under Construction and construction of commercial, residential, custom housing and renovation of existing properties. CRSS Constructions. Inc_ and Williams, and Russell and Johnson, Inc., 35 N.E. 17"' St., Miami, Florida, Position: Scheduling Engineer. Worked as a Project Scheduler in the Control System Group assigned to the CRSS/NRJ Dade County Public School .Joint Venture Team. As a Project Scheduler, I was involved in the coordination of schedules and networks using the AMS management software system. FL4GL.ER FEDERAL SAVINGS AND LOAN ASSOCIATION MIAMi, 101 N,E 1st. Ave., Miami, Florida. Position: Construction Manager: Assistant Vice President for the Mortgage Loan Administration Division. As construction manager was responsible for the overall Construction Loan -8- RESUME CONTINUE: KEY PERSONNEL. Department operation. 1 was involved with inspections and cost breakdown evaluation of major projects and commercial construction projects, supervising the construction loan department staff, establishing procedures, controlling and scheduling of the disbursements of authorized funding and approval on any construction loans requiring a judgement decision, attending loan committee meetings, administrating staff performance review and interacting with builders, developers and respective law offices and loan officers as required. AMERICAN SAVINGS AND LOAN ASSOCIATION OF FLORIDA, Operations Center 17801 N.W. 2nd Ave., Miami. Florida. Position: Construction Inspector: As a Construction inspector, I was involved with the disbursements of commercial and residential construction loan Payments and the inspection of commercial and residential properties under construction. GILBANE BUILDING COMPANY, 90 Calverley St., Providence, Rhode Island. Position: Scheduling Engineer for the project Field, Management at the Miller Brewery project in Albany Georgia. As a Scheduling Engineer, I was involved with the development and coordination of schedules and networks, expediting field required equipment and determining project manpower and providing site management with information on the job progress. STONE AND WEBSTER ENGINEERING CORPORATION, 245 Summer St., Boston, Massachusetts. -9- RESUME_ CONTINUE: KEY PERSONNEL. Position: Planning Engineer 1 was involved with the development and coordination of schedules and networks,' furnishing standards for project performance, determine field required dates for equipment, materials and manpower and also providing site management with information on the job progress. REFERENCES: Wilt be available upon request. -10-