HomeMy WebLinkAboutExhibit28pdf•
•
•
*F.R.ALEMAN
CONSULTING ENGINEERS a�ftVEYg4
& Associates, Inc.
CONSULTING & SURVEYORS
10305 NW 41 Street, Suite 200
Miami, Florida 33178
TEL: (305) 591-8777
FAX: (305) 599-8749
TEST HOLE SUMMARY
FRA PROJECT No.: 1973-Wo 1
**AII Measurements Are In Tenths **
JOB NAME: FAIRLAWN STORM PHASE 2B
JOB LOCATION: Same as Above
FRA PROJECT MANAGER: Mr. D.M. Stanton
TH
UTILITY
COVER
1 COMMENTS
1
TELEPHONE
2.10'
SEE FORM
2
WATER
2.75'
SEE FORM
2A
WATER
2.40'
SEE FORM
3
FORCE MAIN
7.30'
SEE FORM
4
FORCE MAIN
7.10'
SEE FORM
5
WATER
2.70'
SEE FORM
5A
5.06'
SEE FORM
ELECTRIC
6
TELEPHONE
1.60'
SEE FORM
7
FORCE MAIN
4.35'
SEE FORM
7A
FORCE MAIN
5.10'
SEE FORM
•
[ 8
WATER
1.65'
SEE FORM
9
WATER
2.40'
SEE FORM
9A
WATER
2.20'
SEE FORM
10
WATER
2.30'
SEE FORM
11
WATER
2.00'
SEE FORM
11A
TELEPHONE
3.40'
SEE FORM
Page 1 of 2
Z:1Vasuum E&cane olRejoccs119771Summ.r:es\WoI 11.7-06.doc
CONSULTING ENGINEERS & SURVEYORS
www.FR-Aleman.com
Email: dstanton@FR-Aleman.com
Miami - Orlando - Tampa - Jacksonville - Tallahassee
0
•
TH
UTILITY
COVER
COMMENTS
12
STEM
5.70'
SEE FORM
12A
TELEPHONE
3.00'
SEE FORM
13
FORCE MAIN
4.10'
SEE FORM
14
FORCE MAIN
6.80'
SEE FORM
15
WATER
3.80'
SEE FORM
Page 2 of 2
T1van�u E..... o\heienAl9MS,== *AW01 I1.3-06.1..
Miami - Orlando - Tampa - Jacksonville - Tallahassee
FZ.ALEMAN
& Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI, FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB //: 1973 Wo1
TEST HOLE # : 01
FRA P.M.: 0.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 213
FDOT JOB #: N/A
LOCATE REQUESTED BY: T.Y. UN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
PAVEMENT TYPE:
OTHER:
LOCATED UTILITY:
OTHER:
GAS WATER ELE. TEL SAN F.M. STORM
WORK ORDER # : 01
NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
GRASS SIOEWALK DIRT
PAVEMENT CONDITION: G000 FAIR POOR N/A
MATERIAL AS FOUND: D1 CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK D8 CABLE N/A
OTHER:
SOIL CONDITIONS:
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
SHEET OF :N/A
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN FORM CHECKED BY: LMART1
SIZE AS FOUND: (I) 1/2" SIZE AS EXPECTED: UNK
FORM BY: IVAN
UTILITY CONDITION: GOOD FAIR POOR N/A
ASSISTED BY: ALEX
NUMBER OF HOLES: 1
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N/A WHITE
MOM
FACING
INSTALLED:
AT:
TODAYS DATE: 10/26/06
PK HUB&TACK STL PIN CHISX CHIS 80X
CROWN EDGE OF UTIUTY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 1:30 PM
STATION: —
OFFSET: —
oa
HOUSE # 300
5.65'
03
S
5
STOP(
SIGN
9.55'
GRASS
EDGE OF PAVEMENT
SW 3 ST
W.B.L.
ER.ALEMAN
do Associates, Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAAII, FL 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE # : 02
FRA P.M.: D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
FDOT JOB #: N/A
REQUESTED LOCATE: GAS W TfR ELE. TEL SAN F.M. STORM
OTHER:
LOCATED UTILITY:
OTHER:
GAS WATER ELE. TEL SAN F.M. STORM
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T_COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (1) 4"
WORK ORDER # : 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
PAVEMENT CONDITION:
SOIL CONDITIONS:
SHEET OF :N/A
GOOD FAIR POOR N/A
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: JULIO FORM CHECKED BY: I.MAR11
SIZE AS EXPECTED: 4"
FORM BY: JUDO
UTILITY CONDITION:
GOOD FAIR POOR N/A
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
MOTH
t4"
PWT.
2" 1
ASSISTED BY: FELIX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/27/06
INSTALLED: PK NUB&TACK STL PIN CHISX CHIS BOX
AT: CROWN EDGE OF UTILITY: EWSN
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 8:00 AM
STATION: —
OFFSET: —
NW 5 ST
E.B.L
® WATER
VALVE
C.B.
ImBMIN
DIRT
SIDEWALK
FRONT OF
SIDEWALK
GRASS
N
J
CD
V)
EZ,ALEMAN
CON ULTTIING ENGINEERS
10305 NW 41 STREET. SUITE 200
MIAMI. FL 33178
TELEPHONE (305) 591 8777
FAX (305)599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE At : 02A
FRA P.M.: D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
FDOT JOB # : N/A
REQUESTED LOCATE GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (1) 6"
WORK ORDER #: 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
PAVEMENT CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
SHEET OF :N/A
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: JULIO FORM CHECKED BY: I.MAR11
SIZE AS EXPECTED: 6"
UTILITY CONDITION: GOOD FAIR POOR N/A
FORM BY: JLILIO
NUMBER OF HOLES: 1
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
mom
t6"
PINT.
3" I
SUB-PWL.
N/A
FACING
INSTALLED:
AT:
ASSISTED BY: FELIX
TODAYS DATE: 10/27/06
PK HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: E WSN
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
REQUESTED UTILITY IS TEL. BUT FOUND (1)-6"
WATER MAIN.
TIME: 8:30 AM
STATION: —
OFFSET: —
NW 5 ST
E.B.L.
DIRT
w
CO
Ir)
z
i
J
0]
z
WATER
tji VALVE
1
/
SAN
/ M.H.
/
/
—�` 20.60.
STORM
M.H.
GRASS -
FZ. ALEMAN
& Associates, Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI, FL 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE # : 03
FRA P.M. D.M. STANTON
PROJECT NAME FAIRLAWN STORM PHASE 2B
FOOT JOB #: N/A
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
REQUESTED LOCATE GAS WATER ELE. TEL SAN F:M. STORM
OTHER: FORCE MAIN
LOCATED UTILITY:
OTHER:
WORK ORDER#: 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
GAS WATER ELE. TEL SAN F.M. STORM
FORCE MAIN
MATERIAL AS FOUND:
OTHER:
PAVEMENT CONDITION: GOOD FAIR POOR N/A
DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
SOIL CONDITIONS:
IMED SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
SHEET OF :N/A PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN FORM CHECKED BY: I.MARTI
SIZE AS FOUND: (I) 60"
SIZE AS EXPECTED: 60"
FORM BY: IVAN
U11UTY CONDITION:
GOOD FAIR POOR N/A
ASSISTED BY: ALEX
NUMBER OF HOLES: 4 TODAY'S DATE: 10/26/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N/A WHITE
INSTALLED:
AT:
PK HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: E. W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
ALSO FOUND 6" W.M. TO 22' WEST OF TH
GOING SOUTH. TOP COVER 2.95'.BOTTOM COVER 3.45'
TIME: 2:30 PM
STATION: —
OFFSET: —
BE
POLE
J
W
E OF PAVEMENT
I
0
W
20.50'
NW 3 ST
E.B.L.
0.85'
EDGE OF PAVEMENT
N
Z
F.Z.ALEMAN
O US Associates.
FRA JOB #: 1973 Wol
10305 NW 41 STREET, SUITE 200 VACUUM TEST HOLE REPORT
MIAMI. FL 33178 TEST HOLE 04
TELEPHONE (305) 591 8777
FAX (305)99 8749 FRA P.M. D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
FDOT JOB # : N/A WORK ORDER #: 01
LOCATE REQUESTED BY: T.Y. UN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER: FORCE MAIN
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER: FORCE MAIN
PAVEMENT CONDITION: GOOD FAIR POOR N/A
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (1) 60"
SIZE AS EXPECTED: 60"
UTILITY CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
EMU) SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
SHEET OF :N/A PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN FORM CHECKED BY: IMAR11
FORM BY: IVAN ASSISTED BY: ALEX
NUMBER OF HOLES: 4 TODAYS DATE: 10/27/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N/A WHITE
xro1H
±60'1
FACING
W
INSTALLED: PK HUB&TACK STL PIN CHISX CHIS BOX
AT: CROWN EDGE OF UTILITY: EWS N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
W.M. IS NOT EXIST IN THIS ZONE.
TIME: 7:55 AM
STATION: — OFFSET: —
MNIONNI
MINN
HOUSE # 5595
EDGE OF PAVEMENT
NW 2 ST , N
W.B.L.
Z
N
EDGE OF PAVEMENT
EZ.ALEMAN
& Associotes Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI. FL 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE # 05
FRA P.M. O.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
FDOT JOB #: N/A
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
WORK ORDER # : 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
PAVEMENT CONDITION: GOOD FAIR POOR N/A
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (1) 2"
SIZE AS EXPECTED: 2"
UTIUTY CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
SHEET OF :N/A
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: JULIO FORM CHECKED BY: I.MARTI
FORM BY:. JULIO
ASSISTED BY: FELIX
NUMBER OF HOLES: 1 TODAYS DATE: 10/27/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
Mon+
±2"
fAONG
S
INSTALLED:
AT:
PI( HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: EWSN
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 9:00 AM '
STATION: —
OFFSET: —
SIDEWALK
EDGE OF PAVEMENT
f--1 WATER
METER
NW 6 ST
E.B.L.
EDGE OF PAVEMENT
SIDEWALK
FZ.ALEMAN
& Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET. SUITE 200
MIAMI. FL. 33178
TELEPHONE (305) 591 8777
FAX (305)599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wot
TEST HOLE # : 05A
FRA P.M.; O.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
FOOT JOB #: N/A
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
LOCATED UTILITY:
OTHER:
GAS WATER ELE. TEL SAN F.M. STORM
WORK ORDER # : 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
_J ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
MATERIAL AS FOUND: D1 a STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB-CABLE N/A
OTHER:
SIZE AS FOUND: (1) 48`XUNK
PAVEMENT CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
HARD SOFT WET MOIST DRY
SANG CLAY ROCKY N/A SOLID —ROCK
SHEET OF : N/A PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: JULIO FORM CHECKED BY: I.MARTI
SIZE AS EXPECTED: UNK
UTILITY CONDITION:
GOOD FAIR POOR N/A
FORM BY: JULIO ASSISTED BY: FELIX
RIBBON INSTALLED* RED BLUE YELLOW ORANGE GREEN
PINK N/A WHITE
wo1N
t48-1
FACING
E
NUMBER OF HOLES: 1 TODAY'S DATE: 10/27/06
INSTALLED: PK HUB&TACK STL PIN CHISX CHIS BOX
AT: CROWN EDGE OF UTIUTY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
ALSO FOUND SMOOTH POUR ON TOP OF FPL ROUGH
POUR. TOP COVER 0.25'. BOTTOM COVER 5.04'.
UNABLE TO SEE BOTTOM COVER OF ROUG POUR
DUE TO ROCK AND WATER FLOW.
TIME: 9:30 AM
STATION: — OFFSET: —
SIDEWALK
EDGE OF PAVEMENT
WATFR
METER
0
w
a
N
NW 6 ST
E.B.L.
i
In
0
N
N
EDGE OF PAVEMENT
SIDEWALK
F.Z.ALEMAN
CONSULTING ENGINEERS
VACUUM TEST HOLE REPORT FRA JOB #: 1973 Wo1
10305 NW 41 STREET, SUITE 200 TEST HOLE # : 06
MIAMI, FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749 FRA P.M. : D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
FOOT JOB #: N/A WORK ORDER tt: 01
REQUESTED LOCATE: GAS WATER ELE TEL SAN F.M. STORM
OTHER:
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM PAVEMENT CONDITION; GOOD FAIR POOR N/A
OTHER:
SOIL CONDITIONS:
MATERIAL AS FOUND: DI Cl STL W/STL VCPX RCP 11LE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK OB CABLE N/A
OTHER:
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
SHEET OF :N/A PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: JUUO FORM CHECKED BY: I.MARTI
SIZE AS FOUND: (1)1"
SIZE AS EXPECTED: 1"
UTIUTY CONDITION: GOOD FAIR POOR N/A
FORM BY: JULIO ASSISTED BY: FEUX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/27!06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N/A WHITE
MOTH
t1"
PAIL
L-•
PWT
N/A
FAaNO
sw
INSTALLED: PK HUB&TACK STL PIN CHISX CHIS BOX
AT: CROWN EDGE OF UTILITY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 10:00 AM
STATION: — OFFSET: —
DIRT
SW 6 ST
W.B.L.
SAN
M.H.
0
/ FPL
/ POLE
9. /
/
/ 3.00'
EDGE OF PAVEMENT
-J
Id
w
0
•
•
Fz. ALEMAN
do Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET. SUITE 200
MIAMI. FL 33178
TELEPHONE (305) 591 8777
FAX (305)599 8749
VACUUM TEST HOLE REPORT
FRA JOB 4: 1973 Wol
TEST HOLE lr : 07
FRA P.M. D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
LOCATE REQUESTED BY: T.Y. UN INTERNATIONAL
REQUESTED LOCATE GAS WATER ELE. TEL SAN F.M. STORM
OTHER: FORCE MAIN
LOCATED UTILITY:
OTHER:
FDOT JOB # : N/A
WORK ORDER it: 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK GIRT
GAS WATER ELE. TEL SAN F.M. STORM
FORCE MAIN
PAVEMENT CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
MATERIAL AS FOLIND:
OTHER:
D1 0 STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
SIZE AS FOUND: (►) 54`
SHEET OF :N/A
JIARQ SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOUD—ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN FORM CHECKED BY: I.MAR11
SIZE AS EXPECTED: 54' FORM BY: IVAN
UTIUTY CONDITION:
GOOD FAIR POOR N/A
ASSISTED BY: ALEX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/27/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN INSTALLED:
PINK N/A WHITE
1NDJH
±54-
FACING
AT:
PK HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 9:00 AM
STATION: —
OFFSET: —
N
NW 3 AVE,
E.B.L.
EDGE OF PAVEMENT
0
cci
6111rri-
13.1
nI
SAN
MH
EDGE OF PAVEMENT
CEMETERY
•
•
FZ.ALEMAN
it Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI. FL. 33178
TELEPHONE (305) 591 8777
FAX (305)599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE # : 07A
FRA P.M.: D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
FDOT JOB #: N/A
WORK ORDER # : 01
LOCATE REQUESTED BY: T.Y. UN INTERNATIONAL
PAVEMENT TYPE: NONE ASPHALT
ASPHALT
BRICK COBBLES
OTHER: GRASS SIDEWALK
CONCRETE
OVER CONC
DIRT
REQUESTED
OTHER:
LOCATE: GAS WATER ELE. TEL SAN
FORCE MAIN
F.M. STORM
PAVEMENT CONDITION:
G000
FAIR POOR N/A
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER: FORCE MAIN
SOIL CONDITIONS:
1iA8Q
SOFT WET MOIST DRY
SAND
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP
PLA T.COTTA ACP GALV. ROUGH
SMOOTH POUR PVC LINK D8
OTHER:
TILE DUCT
POUR
CLAY ROCKY N/A SOLID —ROCK
SHEET OF : N/A PROPOSED: ROADWAY IMPROVEMENTS
CABLE N/A
COVER ESTAB. BY: IVAN
FORM CHECKED BY: I.MARTI
SIZE AS FOUND: (I) 60"
SIZE AS EXPECTED: 60" FORM BY: IVAN
ASSISTED BY: ALEX
UTILITY
CONDITION: GOOD FAIR
POOR N/A NUMBER OF HOLES: 1
TODAY'S DATE: 10/27/06
RIBBON INSTALLED: RED BLUE
PINK N/A
YELLOW ORANGE
WHITE
GREEN
INSTALLED: PK HUB&TACK
EDGE
STL PIN CHISX CHIS BOX
OF UTILITY: E W S N
—
AT: CROWN
ELEV SURVEY PIN
POUT.
r
1 N/A
J SURVEY PIN LOCATED BY:
Other Surveyors
UB-PW
II NOTES:
CveR TOP
I N/A
L
—
FACING
L5.10'
LL.—„,_
covve eorrou)
1 10.10'
Iwonl
±60" l
E 1
TIME: 10:10 AM
STATION: —
OFFSET: —
i
>-
LJ
w
U
z
Lz
NW 3 AVE 1
EDGE OF PAVEMENT
SAN
p, '0 MH
E.B.L.
N
Ui
GRASS
r9)I
i
;iiii
.f
o'
col
I
FRONT OF SIDEWALK
SIDEWALK
WALL
CEMETERY
FZ.ALEMAN
do Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAM►, FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE # : 08
FRA P.M. i 0.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 28
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
FDOT JOB tt : N/A
WORK ORDER tt: 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
PAVEMENT CONDITION: G000 FAIR POOR N/A
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PIA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (I) 6" SIZE AS EXPECTED: 6"
UTILITY CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
SHEET OF :N/A
HARD SOFT WET MOIST DRY
SANO CLAY ROCKY N/A SOLID —ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY IVAN FORM CHECKED BY: WART!
FORM BY: IVAN
ASSISTED BY: ALEX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/27/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
EIEV St/PIXY PIN
covER TOP
L1.65'
0
J
w
In
GRASS •
5.40'
PINT,
N/A J
_N/AJ
EADNG
SI
/
3.20'
INSTALLED:
AT:
PK HUB&TACK STL PIN CHISX CHIS 80X
CROWN EDGE OF UTILITY: EWSN
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 11:05 AM
STATION: —
EDGE OF PAVEMENT
SAN
/ M.H.
J
N
OFFSET: —
NW 2 ST
1R.ALEMAN
do Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI, FL. 33178
TELEPHONE (305) 591 8777
FAX (305)599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE # : 09
FRA P.M.: D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 26
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
FDOT JOB #: N/A WORK ORDER 1#: 01
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (1) 6"
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
PAVEMENT CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
SHEET OF :N/A PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN
SIZE AS EXPECTED: 6"
UTIUTY CONDITION: GOOD FAIR POOR N/A
FORM CHECKED BY: LMARTI
FORM BY: IVAN ASSISTED BY: ALEX
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
EtEV SURVEY PIN
coax (10P
1 2.40'
COVER
2.90'
EL:14)
%MTH
f6"
P WT.
3"
SUB —P"T.
[N/A
FACING
S
NUMBER OF HOLES: 1 TODAY'S DATE: 10/27/06
INSTALLED: PK HUB&TACK STL PIN CHISX CHIS BOX
AT: CROWN EDGE OF UTILITY: E WSN
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 1:50 PM
STATION: — OFFSET: —
GRASS •
w.M.
VALVE
12.60'
NW 2 TER.
W.B.L.
W.M.
VALVE
wI
(If)
z.
F
Z
En
'CD SAN
M.H.
N
FZ.ALSMAN
& Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI, FL 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB u: 1973 Wol
TEST HOLE u : 09A
FRA P.M. D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
FDOT JOB # : N/A WORK ORDER#: 01
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
LOCATED UTIUTY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
PAVEMENT CONDITION: GOOD FAIR POOR N/A
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PIA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (1) 4"
SIZE AS EXPECTED: 4"
UTIUTY CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID -ROCK
SHEET OF : N/A PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB, BY: WAN FORM CHECKED BY: I.MARTI
FORM BY: IVAN
ASSISTED BY: ALEX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/27/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
ElEV SURVEY PIN
Col4>i
2.20'
E¢-rn
COVER eo
2.54'
fa=a
WO RI
t4"
MONO
w.J
INSTALLED: PK HUB&TACK STL PIN CHISX CHIS 80X
AT: CROWN EDGE OF UTILITY: E WSN
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 1:00 PM
STATION: -
OFFSET: -
W.M.
VALVE
GRASS'
W.M.
VALVE
NW 2 TER.
W.B.L.
SAN
M.H.
N
R.ALEMAN
do Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI, FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB u: 1973 Wo1
TEST HOLE # = 10
FRA P.M. = O.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
FDOT JOB #: N/A WORK ORDER # : 01
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC LINK DB CABLE N/A
OTHER:
SIZE AS FOUND: (1) 6"
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
PAVEMENT CONDITION:
GOOD FAIR POOR N/A
SOIL CONDITIONS:
SHEET OF :N/A
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN FORM CHECKED 8Y: I.MARTI
SIZE AS EXPECTED: 6"
UTILITY CONDITION: GOOD FAIR POOR N/A
FORM BY: IVAN
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
EaV. (BOU )
YAOTN
±6"
P WT.
FACING
ASSISTED BY: ALEX
NUMBER OF HOLES: 1 TODAYS DATE: 10/27/06
INSTALLED:
AT:
PK HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: E WSN
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
ALSO FOUND:
(1)— MCI FOC TO 2' NORTH OF TH.
(2)— W.M. TO 4' SOUTH OF TH.
TIME: 2:20 PM
STATION: —
OFFSET: —
SIDEWALK
GRASS
C.D.
W.M.
VALVE
cP
\�
1'
MCI—FOC
9.30'
W.M.
NW 4 ST
W.B.L.
SAN C5M.H.
NW 52 AVE
N
F.R.ALEMAN
do Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI, FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB !: 1973 Wo1
TEST HOLE it : 11
FRA P.M.: D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 28
LOCATE REQUESTED BY: T.Y. IJN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
FOOT JOB # : N/A
WORK ORDER # : 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK GIRT
PAVEMENT CONDITION: GOOD FAIR POOR N/A
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (►) 6" SIZE AS EXPECTED: UNK
UTILITY CONDITION:
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
GOOD
FAIR POOR N/A
SOIL CONDITIONS:
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
SHEET OF :N/A
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN FORM CHECKED BY: I.MARTI
FORM 8Y: IVAN
rAQNO
[S ]
ASSISTED BY: ALEX
NUMBER OF HOLES: 1
INSTALLED:
AT:
TODAYS DATE: 10/27/06
PK HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: EWSN
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
BST IS NOT EXIST IN THIS ZONE.
BST TO 25' EAST OF TH
TIME: 2: 40 PM
STATION: —
OFFSET: —
N
GRASS
NW 4 TER,
E.B.L.
SIDEWALK
0
O
Z Ga
00
ix
�O—
FIRE
HYDRANT
5.35'
SANM.H.
25'
cn
m
F2.ALEMAN
& Associates Inc.
CONSULTING tNGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI, FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE ti : 11A
FRA P.M. D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
LOCATE REQUESTEO BY: T.Y. LIN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
FDOT JOB #: N/A WORK ORDER # : 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
PAVEMENT CONDITION: GOOD FAIR POOR N/A
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SOIL CONDITIONS:
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
SHEET OF :N/A PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: JULIO FORM CHECKED BY: I.MART1
SIZE AS FOUND: (I) 1" SfZE AS EXPECTED: UNK
FORM BY: JULIO ASSISTED BY: FELIX
r
UTILITY CONDITION: G000 FAIR POOR N/A
NUMBER OF HOLES: 1 TODAYS DATE: 10/27/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N/A WHITE
MOM
FAcuto
N
INSTALLED: PK HUB&TACK STL PIN CHISX CHIS BOX
AT: CROWN EDGE OF UTILITY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
ALSO FOUND (1)-8" UNK PIPE AT THE BOTTOM OF 8T.
TOP COVER 4.10'. BOTTOM COVER 4.27'
TIME: 3:00 PM
STATION: —
OFFSET: —
Fi.ALEMAN
& Associates._Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAMI, FL. 33178
TELEPHONE ((305 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB n: 1973 Wol
TEST HOLE u : 12
FRA P.M. D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
LOCATE REQUESTED BY: T.Y. UN INTERNATIONAL
FOOT JOB : N/A.
REQUESTED LOCATE GAS WATER ELE. TEL SAN F.M. STORM
OTHER: FOC
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER: FOC/ DUCT -SYSTEM
WORK ORDER # : 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
PAVEMENT CONDITION: GOOD FAIR POOR N/A
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP 11LE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (3) 1 1/2"
SOIL CONDITIONS:
SHEET OF :N/A
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID -ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN FORM CHECKED BY: I.MARTI
SIZE AS EXPECTED: UNK
FORM BY: IVAN
UTIUTY CONDITION: GOOD FAIR POOR N/A
ASSISTED BY: ALEX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/30/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N/A WHITE
EZEWIBOTKM)
MOTH
t 10"
FApNo
EN
INSTALLED:
AT:
PI< HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
ALSO FOUND (1)-54" FM TO 1' WEST OF FOC GOING
NORTH. TOP COVER 4.10'. BOTTOM COVER 8.60'
TIME: 2:10 PM
STATION: - —
OFFSET: —
w/
M
z
SW 3 ST
W.B.L.
J
z
w
a
1
0
w
0
0
2.70'
GRASS
C
0
7.00'
BE 0
POLE
FRONT OF SI
N
F.Z.ALEMAN
do Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET, SUITE 200
MIAM1, FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB tt: 1973 Wo1
TEST HOLE # : 12A
FRA P.M.: D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
LOCATE REQUESTED BY: T.Y. UN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE, TEL SAN F.M. STORM
OTHER
FOOT JOB # : N/A
PAVEMENT TYPE:
OTHER:
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC LINK DB CABLE N/A
OTHER:
SIZE AS FOUND: (I)1/2" SIZE AS EXPECTED:UNK
UTIUTY CONDITION: GOOD FAIR POOR N/A
WORK ORDER#: 01
NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
GRASS SIDEWALK DIRT
PAVEMENT CONDITION: GOOD FAIR POOR N/A.
SOIL CONDITIONS:
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID—ROCI
SHEET OF :N/A PROPOSED: ROADWAY IMPROVEMENT;
COVER ESTAB. BY: IVAN
FORM BY: IVAN
FORM CHECKED BY: I.MARTT
ASSISTED BY: ALEX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/30/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
FINK N/A WHITE
cxrITOTT r)
NOTI4
t1/2"
PWT.
N/A
N/A
PACING
N
INSTALLED:
AT:
PK HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 1:00 PM
STATION: —
OFFSET: —
NW 53 AVE
SW 3 ST
W.B.L.
Z
W
a
a
Le-
0
0
0
41
W
3.00'
GRASS
8.25'
\ p
BE 0
POLE
OF SIDEWALK
0
cE
f`J
7
F2.ALEMAN
& Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET. SUITE 200
MIAM I. FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT FRA JOB a: 1973 Wa1
TEST HOLE a 13
FRA P.M.: D.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 2B
FDOT JOB # : N/A
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
REQUESTED LOCATE GAS WATER ELE. TEL SAN F.M. STORM
OTHER: FORCE MAIN
WORK ORDER # : 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
LOCATED UT1UTY:
OTHER:
GAS WATER ELE. TEL SAN F.M. STORM
FORCE MAIN
MATERIAL AS FOUND:
OTHER:
DI CI Sit W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
SIZE AS FOUND: (1) 54"
SIZE AS EXPECTED: 54"
PAVEMENT CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
SHEET OF :N/A
BARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOLID —ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: -IVAN FORM CHECKED BY: I.MARTI
FORM BY: IVAN
UTIUTY CONDITION:
GOOD FAIR POOR N/A
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
• PINK N/A WHITE
%MOTH
±54"
Pwr.
�v I
N/A r
FACING
THE
ASSISTED BY: ALEX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/30/06
INSTALLED:
AT:
PK HU8&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 10:20 AM
STATION: —
OFFSET: —
SAN
M.H.
WM
VALVE
1)
?i.8a•
W
M
u)
z
J
z
NW 4 ST
E.B.L.
GRASS
N
SIDEWALK
F2.ALEMAN
& Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET. SUITE 200
MIAMI. FL. 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB #: 1973 Wo1
TEST HOLE # : 14
FRA P.M.* D.M. STANTON
PROJECT NAME FAIRLAWN STORM PHASE 2B
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
REQUESTED LOCATE: GAS WATER ELE. TEL SAN F.M. STORM
OTHER: FORCE MAIN
LOCATED UTILITY:
OTHER:
GAS WATER ELE. TEL SAN F.M. STORM
FORCE MAIN
MATERIAL AS FOUND:
OTHER:
FDOT JOB #: N/A
WORK ORDER #: 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK DIRT
PAVEMENT CONDITION:
DI a STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR SHEET OF : N/A
SMOOTH POUR PVC UNK OB CABLE N/A
SOIL CONDITIONS:
SIZE AS FOUND: (I) 4"
SIZE AS EXPECTED: 4"
U11UTY CONDITION:
GOOD FAIR POOR N/A
NARQ SOFT WET MOIST DRY
SANG CLAY ROCKY N/A SOLID —ROCK
PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: IVAN FORM CHECKED BY: I.MARTI
GOOD FAIR POOR N/A
FORM BY: IVAN
ASSISTED BY: ALEX
NUMBER OF HOLES: 1 TODAY'S DATE: 10/30/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N/A WHITE
auv-(eo )
WDIN
t4"
N/A
FACING
INSTALLED:
AT:
PK HUB&TACK STL PIN CHISX CHIS BOX
CROWN EDGE OF UTILITY: E W S N
SURVEY PIN LOCATED BY: Other Surveyors
NOTES:
TIME: 7:55 AM
STATION: —
OFFSET: —
M.H.
EDGE OF PAVEMENT
19.80'
NW 4 TER
E.B.L.
11.50'
SIDEWALK
GRASS
N
FZ.ALEMAN
& Associates Inc.
CONSULTING ENGINEERS
10305 NW 41 STREET. SUITE 200
MIAUI. FL 33178
TELEPHONE (305) 591 8777
FAX (305) 599 8749
VACUUM TEST HOLE REPORT
FRA JOB xt: 1973 Wo1
TEST HOLE # : 15
FRA P.M.: O.M. STANTON
PROJECT NAME: FAIRLAWN STORM PHASE 28
LOCATE REQUESTED BY: T.Y. LIN INTERNATIONAL
FDOT JOB #: N/A
REQUESTED LOCATE GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
LOCATED UTILITY: GAS WATER ELE. TEL SAN F.M. STORM
OTHER:
MATERIAL AS FOUND: DI CI STL W/STL VCPX RCP TILE DUCT
PLA T.COTTA ACP GALV. ROUGH POUR
SMOOTH POUR PVC UNK DB CABLE N/A
OTHER:
SIZE AS FOUND: (1) 6"
SIZE AS EXPECTED: UNK
UTILITY CONDITION: GOOD FAIR POOR N/A
WORK ORDER-#: 01
PAVEMENT TYPE: NONE ASPHALT CONCRETE
ASPHALT OVER CONC
BRICK COBBLES
OTHER: GRASS SIDEWALK GIRT
PAVEMENT CONDITION: GOOD FAIR POOR N/A
SOIL CONDITIONS:
HARD SOFT WET MOIST DRY
SAND CLAY ROCKY N/A SOUD—ROCK
SHEET OF :N/A PROPOSED: ROADWAY IMPROVEMENTS
COVER ESTAB. BY: WAN FORM CHECKED BY: WART!
FORM BY: IVAN ASSISTED BY: ALEX
NUMBER OF HOLES: 2 TODAY'S DATE: 10/30/06
RIBBON INSTALLED: RED BLUE YELLOW ORANGE GREEN
PINK N A WHITE
WOTH
•f6"
PWT.
I 1/2"
FAtlNO
I N
INSTALLED: PK HUB&TACK STL PIN CHISX CHIS 80X
AT: CROWN EOGE OF UTILITY: E W S N
SURVEY PiN LOCATED BY: Other Surveyors
NOTES:
BST IS NOT EXIST IN THIS ZONE.
BST TO 35' EAST OF TH
TIME: 8:50 AM
STATION: — OFFSET: —
EDGE OF PAVEMENT
NW 4 TER
E.B.L
GRASS
o
1)
vi
gI
(01 II
WM
VALVE
-O SAN
M.H.
35.
N
zI
J
rD
(/1