HomeMy WebLinkAboutSite Utility Study (2)NOR.DI CA ON 8
1174 S 8T11 ST .EET, IA I, F
SITE UTILITY ST
Prepared fir:
CALLE OCHO, LLC
ASTOR DEVELOPMENT
2601 SOUTH BAYSHORE DRIVE, SUITE 1800
MIAMI, FL 33133
JI\
By:
A.D.A. ENGINEERING, INC.
Consulting Engineers and Planners
1 1401 S.W. 40th Street, Suite 470 Miami, FL 33165
Phone (305) 551-4608 • Fax (305) 551-8977
www.adaengineering.com EB # 00003212
OCTOBER 24. 2006
Nordics on 8
Site Utility Study
INTRODUCTION
The its atio ofthe proposed project is the site bounded by SW 7 s, Street on the north. and SW 8"° Street on
the south. S ` 12'" Avenue on the west and other commercial and residential buildings to the east. The
proposed site is 98.939 square feet. The existing site is comprised of duplex (multi -family), residential
(single family), retail_ office and parking lots, all of which will be demolished. The proposed site shall
include a new 15 story building complete with 772 parking spaces, 51,503 feet of retail/office space, and 408
living units,
The plans shall be processed through various permitting agencies. The building plans, site work, and
demolition shall be permitted by the City of Miami. Approvals and permits for water and sewer shall be
issued by the Miarni-Dade Water and Sewer Department, the Miami -Dade County Department of
Environmental Resources Management (DE RM), and the Department of Health. Approvals and permits for
stormwater drainage shall be obtained from DER.M-Water Control Section, the Florida Department of
Transportation, and the City of Miami Public Works .Department.
GENERAL
Electric, telephone, water, sewer, and storm drainage utilities are known to exist in the project area. There
are no records of underground gas utilities in the immediate area. The utility provider and contact
information are:
Electric:
Telephone:
Water and Sewer:
Florida Power and Light
Lesley Dubord
(305) 377-6202
Bellsouth Telecommunications, Inc.
Steve Massie
(305) 222-8745
Miami -Dade Water and Sewer Department
Phillip Torres
305) 669-7658
Stormwater Management: Miami -Dade Department of Environmental Resources Management (DERM)
Camilo Ignacio
(305) 372-6681
City of Miami Public Works Department
Len Helmers
(305) 416-1221
WATER DISTRIBUTION
The Miami -Dade County Water and Sewer Department (WASD) is currently responsible for providing water
service to the project area. There are existing water mains in the project area. The locations and sizes of
these water mains are as follows: a 16" WM along SW 8`1' Street (south side of property), a 6" WM along
SW 7th Street (north side of property), and a i2" WM along SW 12th Avenue which immediately reduces to a
D A. E nU• E R.1 NC.
Nordica on 8
Site Utility Study
3" M ji st north. of SW 8`' Street i ;est side of property,. t of r to attachment A. WASD recomrne ids that
the point of �o�at1 etiou be the 12'1 E long SW 1 2° Avenue just north of S• W 8`}' Street. The 12" WM
shall then be extended north along SW 120 Avenue to SW 7`1' Street. The 12" `v%M shall then extend east to
the northeast edge of the property where it shall connect to an existing 6" water main. As per WAS1 , if two
or more fire hydrants are to be connected to a public water main extension within the property, then the
water system shall be looped with two points of connections. Additionally, separate connections for fire
lines and fire hydrants shall be required.
The total water consumption Tor the proposed structure shall be as -follows:
Condominium apartments (408 x 200 gpcd) = 81,600 gallons per day
Retail/Office (18.727 x 1 0 gpd/100 square feet) — 1,873 gallons per day
Retail (32,776 x 5gpd / €00 square -feet) = 1,639 gallons per day
Total Gallons Per Day = 85,112 gallons per day
SANITARY SEWAGE COLLECTION
The Miarni-Dade County Water and Sewer Department (WASD) is currently responsible for providing
sanitary sewer service to the project area. There are existing gravity sewer mains in the project area. The
locations and sizes of these gravity pipes are as follows: a 15" gravity sewer main along SW 7th Street (north
side of property), a 12" gravity sewer main along SW 12"' Avenue (west side of property), and an 8" gravity
sewer main along SW 8` Street (south side of property). Refer to attachment B. The point of connection is
subject to an engineering analysis by WASD. It is important to note that improvements to the existing
sewage pump stations receiving flow from this project may be required based upon the sewage flows
discharged by this project.
The total sewage discharge is approximately 85.1 l2 gallons per day.
DRAINAGE
The total project area is approximately 98,939 square feet. For the purposes of a conservative stormwater
management engineering analysis. the entire site shall be considered to be impervious. Water collected from
rooftops. vertical building spaces. pedestrian areas, and driveways shall be included in the stormwater
drainage system.
Total Net Lot Area
(acres)
2.27
Impervious Area
{acres)
2.27
Vertical Building
Faces (acres)
Total Drainage Area
(acres)
.45 2.72
Runoff from the above mentioned locations shall be collected in catch basins. The catch basins shall be
installed with baffles to prevent debris from entering the storm drainage system. The design storm shall be
the Miami -Dade County DERM 5 year, 24 hour storm for a period of 90 seconds. The design shall be based
on the use of ex -Filtration trenches around the perimeter of the building. In the event that additional storm
��� A. D.A. ENSrNEEF 1Nt, 4t�9C.
Nordica on 8
Utility Study
drainage is required or insufficient ar a for the €xf 1tra ion trencht i a '<1i ahIt, drainage wells 1 -lay also be
utilized.
Water collected inside the parking garages stud # be collected and discharged into the sar
A sump pump shall be provided as required.
yste-
SOLID WASTE GENERATION
it is anticipated that approximately 4.100 lbs per day of solid waste shall he, generated by this project,
Condominium apartments (408 x 5 lbs / day) = 2,040 lbs per day,
Retail (5-1,503 x 4 lbs/ 100 square feet / day) = 2,060 lbs per day
Total solid waste = 4,100 lbs per day or 2.05 tons per day.
Solid waste shall be placed and stored in standard on -site containers for both refuse and recyclables. These
containers shall comply with the applicable City of Miami codes. Additionally, the solid waste shall be
transported to Miami -Dade County Solid Waste Disposal facilities via regular pick-up service by the City of
Miami Solid 'waste Department or private hauling companies.
J� A.D,A Et+i iNEERIN , INC.
Nordica on 8
Site Utility Study
ATTACHMENT A
Water Atlas
. ,
n
9 - .,.., e... -fel
4
t
-Nordica on 8
AILA.D„A, ENoINEERINu. Nc
Nordica on 8
Site y Study
ATTACHMENT B
i444.
4"
444
4
T. RR. 43L,
•
?V'
4 t,ff ST
1K
43
54$
yr 441. V157.
4
Sewer Atlas
R.,
601,
604 44?
4 4
at fAMIAMi
Nordica on 8
94
4-44
.A411L ENOINEERING,