Loading...
HomeMy WebLinkAboutProject DescriptionART PROJE T ES ' PTION P ojcct es ription Zoning L)rdinance No, 11.000 1. Section 1304.2.1 App. ication forms; supplementary materials �. Section 1702.2.1 General Report 3. Section 1702.2.2 Major Use Special .Permit Concept Ilan 4. Section 1702.2.3 Development Impact Siudy. MAJOR USE SPECIAL PERMIT Section 1304.1.1 Application forms; supplementary materials Statements of ownership and control of the proposed development of activity. The Disclosure of Ownership and Ownership Affidavit are provided in Article I. (b) Statement describing in detail the character and intended use of the development or activity. (c) ELEMENT 1&2 is a residential condominium development that consists of two towers ranging from 20-50 stories with a total of 413 residential units including 17 street -level townhouses and 671 parking spaces. The project is located at 600 and 601 NE 31sf Street , Miami, Florida. The development consists of two parcels -- the South Parcel with a net lot area of 131,111 square feet (3.010 acres) and the North Parcel with a net lot area of 62,142 square feet (1.427 acres). The combined gross lot area is 193,253 square feet (4.437 acres). The zoning designation for the property is R4 (Multifamily High Density Residential) with SD-20 (Edgewater Overlay District) which allows a maximum of 150 units acre. The maximum FAR is 1.72 and the maximum allowable FAR without bonuses is 449,851 square feet. The maximum allowable FAR area with bonuses, to include PUD bonus, affordable housing bonus is 652,283 square feet. The property fronts NE 32nd to the north, NE 7`h Ave. and Biscayne Bay to the east, NE 30th Ter. to the south and private property to the west. Building heights in NGVD are as follows: North Tower + 246'-2" North Garage + 40' 0" South Tower + 549'-0" South Garage + 56'-8" Drawings showing the architectural character and location of the intended uses are included under Tab 6 of the Supporting Documents. General location map, showing relation of the site or activity for which special permit is sought to major streets, schools, existing utilities, shopping areas, important physical features in and adjoining the project or activity and the like. The following exhibits are inciuded with the Major Use Special Permit Application: (1) Aerial: Aerial photograph of the surrounding area indicating the project site. (3) Area Context Map/Site Aerial: Map of the project area indicating buildings and their functions that surround the site. Location Map: Map of the surrounding street system indicating the project location. (d) A site plan containing the title of the project and the names of the project planner and developer, date, and north arrow and, based on an exact survey of the property drawn to a scale of sufficient size to show: The general information requested is shown on the Sheets A0.0 thru A0.3, provided under Tab 6 of the Supporting Documents, The site plan includes the following: (1) Boundaries of the project, any existing streets, buildings, watercourses, easements and section lines; The boundaries of the project and the location of existing streets and easements are shown on the Survey located under Tab 5 of the Supporting Documents. (2) Exact location of all buildings and structures; The exact location of all existing buildings located on the property is shown on the Boundary Survey under Tab 5. The location of the building to be constructed is shown on the Site Plan, Sheet A0.3 , located under Tab 6 of the Supporting Documents. (3) Access and traffic flow and how vehicular traffic will be separated from pedestrian and other types of traffic; Vehicular access for the project is from Biscayne Boulevard along NW 32'd St., NW 31st St. and NW 30Th Ter. Access to the parking garages are located along NW 31st St. between the North and South towers. Direct entry to each garage is from the porte-cochere of both towers without having to reenter the public street. The service drive for the North Tower, as well as the loading areas, are located on NW 32nd. The service drive for the South Tower, as well as the loading areas, are located on NW 30`t'. 2 A detailed analysis of the site access and traffic flow is provided in the Traffic Impact Analysis located under Tab 2 of the Supporting Documents. (4) North and South parcel setbacks; NW 7Th Ave. will be the front of the North parcel and have a 20' setback. NW 32nd and NW 31st Streets will have side setbacks of 15( 75% of 20'). The remaining rear and side setbacks at the park will be 5' NW 3e Ter. will be the front of the South Parcel and will have a 20' setback. I addition a 5' dedication will be required so that the right of way can be widened from 30' to 35'. NW 31 street will have a rear setback of 15' (75% of 20') The West side yard setback will be 5' and the East bay front setback will be 50'. (5) Offstreet parking and offstreet loading areas; The offstreet parking facility for the North tower includes a 3- level parking structure with 154 parking spaces. The garage is shown on Sheets A2.1a, A2.1b & A2.2, provided under Tab 6 of the Supporting Documents. The offstreet parking facility for the South tower includes a 5- level parking structure with 517 parking spaces. The garage is shown on Sheets A1.1 thru A1,5, provided under Tab 6 of the Supporting Documents, The Zoning Ordinance For the South Tower requires fifteen (15) loading bays. There will be fifteen (15) loading bays. 2 loading baysl2 ft. x 35 ft, 11 loading bays 10 ft x 18 ft, and 2 loading bays 9 ft. x 18 ft. The clearance for the 12' x 35' loading bays is 15 feet. The Clearance for the other bays is 10 feet. The Zoning Ordinance For the North Tower requires five (5) loading bays. There will be five (5) loading bays. 2 loading bays 12 ft. x 35 ft, 2 loading bays 10 ft x 20 ft, and 1 loading bays 10 ft. x 18'. The clearance for the 12' x 35' loading bays is 15 feet. The Clearance for the other bays is 10 feet. (6) 3 Service areas are shown on the A0.03 Plan, under Tab 6 of the Supporting Documents. Recreational facilities locations; Each Tower will have common area amenities for the residents. These include meeting rooms, business centers health club and racquetball courts. The parking roofs on levels 4 and 6 will have tennis courts, swimming pools, resistance pools and landscaping The South tower will have a 1 acre pool deck facing Biscayne Bay with swimming pools and cabanas. These facilities are shown on drawings A0.3, A1.6 and A2.3 (7) Screens and buffers; Landscaped areas are indicated on the Landscape Plans, Sheet L1.1 thru L1.4 and L2.1 thru L2.4, located under Tab 6 of the Supporting Documents. (9) Refuse collections areas; Waste collection will be provided by a containerized compactor system located within the service area. The buildings will have provisions for recycling. The building will include a dry wash, air-conditioned garbage rooms and can wash. These facilities are shown on the A0.03 Plan, located under Tab 6 of the Supporting Documents. (9) Access to utilities and points of utilities hookups. Access and connections to site utilities are discussed in the Site Utility Study located under Tab 3 of the Supporting Documents. (e) Tabulations of total gross acreage in the project and the percentages thereof proposed to be devoted to: (1) The various permitted uses: Residential Sq. Ft. = 652,283 SF (2) Ground coverage by structures: Building Footprint = 107,090 SF Ground coverage by the structures is 40.9% of the total gross lot area. 60% coverage is permitted (f) Tabulation showing the following: (1) The derivation of numbers of offstreet parking and offstreet loading spaces shown in (d) above; The total number of offstreet parking spaces required is 463 spaces and the total number of spaces provided is 671 spaces. Derivation of the number of offstreet parking is shown within the Project Summary, located under Tab 6. (2) Total project density in dwelling units per acre. 4 (g) As per R4 with a SD-20 overlay-, the maximum project density is 150 units per acre, The designated site, which for density purposes is 4.436 acres, which allows for the construction of 665 units. This project will provide only 413 units. If common Mollifies (such as recreation areas of structures, private streets, common open space, etc.) are to be provided for the development, statements as to how such common facilities are to be provided and permanently maintained. All common facilities provided will be maintained by the Owner, (h) Storm drainage and sanitary sewerage plans. Storm drainage, water distribution, waste water and solid waste generation provisions are discussed in the Site Utility Study located under Tab 3 of the Supporting Documents, 0) Architectural definitions for buildings in the development; exact number of dwelling units, sizes, and types, together with typical floor plans of each type. Detailed information and breakdown of square footage of all uses are found under Project Criteria within The Project Summary, included under Tab 6 of the Supporting Documents. Typical floor plans for residential units are shown on the Typical Residential Floor Plans. All drawings are located under Tab 6 of the Supporting Documents. (j) Plans for signs, if any. The project will obtain signage approval at a later date. (k) Landscaping plan, including types, sizes and locations of vegetation and decorative shrubbery, and showing provisions for irrigation and future maintenance. The landscape plans showing vegetation are found on the L1.1 thru Ll .4 and L2.1 thru L2.4. All landscape plans are located under Tab 6 of the Supporting Documents. (1) (m) 5 Plans for recreation facilities, if any, including location and general description of buildings for such use. Each tower will common amenities within the tower building envelope. Each parking garage roof will have common amenities including tennis and pools, and the South tower will have a pool deck facing Biscayne Such additional data, maps, plans, or statements as may be required for the particular use or activity involved. The details of the spaces and calculations used to compute the Floor Area Ratio (FAR) are shown on the Sheet A1.02, provided under Tab 6 of the Supporting Documents, (n) Such additional data as the applicant may believe is pertinent to the proper consideration of the site and development plan. Elevations depicting the architectural character of the building are shown on the Buildings Elevations, Sheets A1.21 thru A1.31 and A2,8 thru A2.14b. All elevations are located under Tab 6 of the Supporting Documents, 2. Section 17022.1 General Report. (1) Property ownership and beneficial interest within the boundaries of the area proposed for Major Use Special Permit. Statement of Ownership and beneficial interest within the boundaries of the area proposed for Major Use Special Permit are provided in Article I. (2) The nature of the unified interest or control. The nature of unified interest or control is indicated in Article I, (3) Survey of the proposed area showing property lines and ownership. A copy of the Surveys are included under Tab 5 of the Supporting Documents. (4) Map of existing features, including streets, alleys, easements, utilities lines, existing land use, general topography, and physical features. (5) The existing site features and utility lines are shown on the Boundary Survey of the property located under Tab 5. The site features and the utilities are also described in the Site Utility Study, located under Tab 3 of the Supporting Documents. Materials to demonstrate the relationship of the elements listed in (4) preceding to surrounding area characteristics. The drawings submitted with this Application are located under Tab 6 of the Supporting Documents. (6) Existing zoning and adopted comprehensive plan designations for the area on and around the lands proposed for Major Use Special Permits The existing zoning designation for the property pursuant to City of Miami Ordinance No. 11000 and Plat Book 30, at Page 12 of the Public 6 v Records of Miami --Dade County, Hiorida. (which is located in Article l), indicates the existing and surrounding zoning. The zoning designation for the property is SD-5. The Comprehensive Plan Future Land Use designation for the property is Office. The zoning and the comprehensive plan designations are consistent with one another. Section 1702.2.2 Major Use Special Permit Concept Plan. a, Relationships of the concept plan to surrounding existing and proposed future uses, activities, systems, and facilities (transportation, recreation, view corridors, pedestrian systems, service systems and similar uses. Article li contains a written narrative of this project outlining proposed uses, activities and architectural character. This narrative also contains descriptions of the project's relationship to traffic, pedestrian movements, and transportation access. Building elevations, sections and perspectives showing the proposed materials, vertical profile and height, and orientation to streets are included in the drawings submitted with this Application. The list of drawings submitted is found under Tab 6 of the Supporting Documents. b. Existing zoning and adopted comprehensive plan principles and designations. The project conforms with the R4 with a SD-20 overlay zoning district designation for the property. The comprehensive plan future land use designation conforms with the land use designation currently in effect for the property. 4. Section 1702.2.3 Developmental Impact Study. (a) A traffic analysis shall be submitted for an area within approximately 1/4 mile of the site, or an area including the major intersections to be impacted by the site, whichever is larger. The Traffic Impact Analysis is included under Tab 2 of the Supporting Documents. (b) Economic impact data shall be provided, including estimates for construction costs, construction employment, and permanent employment and shall demonstrate that the proposed development is favorable to the economy, public services, environment and housing supply of the City. The Economic Impact Study is included under Tab 4 of the Supporting Documents. (c) A housing impact assessment. 7 Over the last several years prices of urban housing have increased dramatically; despite the recent slow down in the economy, Subsequently, a substantial amount of people within metropolitan areas has begun to return to the city to live. This has created a shortage of multi -family housing along with an upward surge of housing prices. Contrarily, the cost of construction has not kept pace with these increases, which has made it economically affordable to construct new buildings for sale. This pattern remains the same in South Florida where there continues to be an increased demand for housing, particularly in Miami -Dade County. (d) A description of proposed energy conservation measures shall be provided, including only those measures that are proposed in addition to the minimum requirements in State Energy Code. Architecturally, the building envelope will be comprised of insulated wails and roof, there will be insulation under terraces that are above occupied space. Tinted glass will be used throughout the building. Electrically, all exterior and landscape lighting will be controlled by means of time clocks and photocell switches. Energy saving lamps, ballasts and fixtures are being considered at cores and public spaces. (e). Historic Buildings There are no historic structures located on the property. (f). Environmental Zone Property is not within an environmental zone. 8 September 1 Q. 2007 Ms. Ana Gelabert-Sanchez Director of tbe Planning Department City of Ivliami 444 SW. 2'1A venue, 3th Fic:i0r Miami, Florida 33130 ENVIRONMENTAL AND CIVIL ENC/NEERING MIDOOR AIR QUALIr Subject; Environmental Impact Analysis Reference: Element 1 and 2 IVIUSP Application, Approx, of 600 N.E. 31° Street, Florida Ms. Gelabert-Sanchez: Upon review of the MUSP application, proposed development plan, Florida Environmental Engineering, Inc. (F.E.E.), Pre -Demolition Inspection Report for Limited Asbestos Survey and Limited Lead Based Paint Survey, dated February 23, 2005 and F.E.E., Environmental Site Assessment Phase — 1 nitially dated April 8, 2003 and updated on January 27, 2004, as well as the report dated July 8, 2004 and updated on February 4, 2005. in addition to the aforementioned, my personal experience in the area surrounding the proposed Element 1 and 2 it is my professional opinion that the development will have favorable impact on the environment. This assessment is based on the following observation; • Removal of Lead Based Paint, • Removal or asbestos containing materials, New storm water system will proposes zero run off. • Garaged Parking versus surface parking, • Removal (if any) of unregistered underground storage tanks (common in area), • Close Proximate to major employment centers will reduce commute time and vehicular traffic, and • Access to public transportation. • Land resources • No threatened or endangered species have been identified. • A waterwaik with public green space will be added. • Addition of plant species and communities by the proposed additional tree planting. • Restoration and improvements to the abutting seawall to Element I. Furthermore, the assessment considered any wildlife habitat or aquatic species, which was determined to not be applicable to this application, as the property is vacant with no wildlife and there is no submerged lands included in the proposed development. If you require further information or have any questions, please do not hesitate to contact me. 9300 So. Dade:tar Blvd, Suite 310 Miami, Florida 33256 Phone (305) 670-3986 Fax (305) 670-8017 z.CO/ 1.7oo'a 7P7A4 M. Ana Gembert-Sb_lachez September 10, 2007 Page two Sincerely, BALTET LNVIRONMENTAL, INC Peter P, Baije. PE. C.I.E.C, President License No. Florida P.E. 10745 ,00iittiyili ONVik R f3 '1", = .„...,,*,:°rti..-,..,, §...",..<0., At.,rz 4,- vc ,,. ." I .4.: : No. 10745 ;.4., 5.* F * 7-13 • STATE OF : Z C.13 t ''., N....x.54' °,,e1,11.4.4...* -L1.• Si. d;%;kr)tif1.437: Enclosure c(1: Teresita Fernandez, Dept. of Hearing Boards Jared Mintz, Marathon Lucia Doughtery, Esq. Babe Envimmatental 9'300 So, Dadeland Bivd., Snite 310 Pinrida 33156 . Phone (305) 670-3986 c Fax (305) 670-8017 T,FPrre7 ,,O,T