HomeMy WebLinkAboutPlanning DeterminationCITY Y O1AM11a, FLORIDA 1NTEE-OFFICE MEMORANDUM Distribution Below Ana Ebert-Sanche l3irector Planning Department DAT SUBJECT : REFERENCES : ENCLOSURES: May 2007 Modifications for: Bayview Market MUSP Resolution 05-0350 Adopted May 26th, 2005 FILE : Pursuant to Section 1706, Zoning Ordinance 11000, it is hereby directed that this memorandum modifies the development order for the Bayview Market Major Use Special Permit, by approving the changes described in the attached letters from Iris V. Escarra, Esq., dated April 12th, 2007 and Gene N. K]uesner, AIA, LEED from Perkins+WilI, dated April 1 1`h, 2007. This modification is approved, as specified below and as detailed in the attached letter (referenced herein and made a part hereof). This approval is based on findings that the proposed modification is a "de minimus" nonsubstantial change to the Major Use Special Permit issued on May 26th, 2005, per the attached memorandum from Lourdes Slazyk, Zoning Administrator, dated February 215`, 2007. Resolution OS-0350 is hereby amended as per the modifications listed in the attached letters and backup and memorandum from Lourdes Slazyk, Zoning Administrator, dated February 20, 2007 and the accompanying plans on file with the Planning Department receipt dated April 13th, 2007. Attachments Distribution with attachments: Hector Lima, Director Building Department Lourdes Slazyk, Zoning Administrator Zoning Office Teresita L. Fernandez, Chief Hearing Boards Division Gent N. Kluesner, A1A, LEED Architect for Bayview Market MUSP Iris V. Escarra, Esq. Attorney for Bayview Market MUSP Bayview MarketMajor Use Special Permit File 0 Greenberg Traurig April 12, 2007 VIA HAND DELIVERY Ms. Ana Gelabert-Sanchez Director, Planning Department City of Miami 444 S.W. Second Avenue, 3rd Floor Miami, Florida 33128 Re: Bayview Market located at 1700 NE 2nd Avenue, Miami, FL Ins V Escarra Tot. (305) 579-0737 Fax (305) 961-5737 escerrait gtiaw.c0rn Dear Ms. Gelabert-Sanchez: Please accept the following as a supplement to our request for a non - substantial modification of the Major Use Special Perrnit ("MUSP") approved of May 26, 2005, by Resolution 05-0350 for an extension of time pursuant to Section 1704 of Zoning Ordinance 11000 of the City of Miami. Pursuant to our discussions with the City, please accept the following as clarification of items presented in the plans. Thank you very much for your assistance in this matter. Should you have any questions or concerns, pleaMse feel free to call me at (305)579-0737. Iris V. Escarra, Esq. cc: Jeff Weil, BDB Miami, LLC Lucia A. Dougherty, Esq. Greg } er gu#,& ' Uiat Law 1221 Brickel, Avenue I Miarr€i, FL 33131 TeL 305.579.0500 i Fax 305.579.07 € 7 www.gtlaw.corn 999 P ncp: Pe Leon BI'Ad Suite 9.15 'oral Cables, FL 33134 PERKINS +WILL April 11, 2007 Ana Gelabert-Sanchez, Planning Dept, and Lourdes Siyzak, Zoning Dept City of Miami / Zoning and Planning Dept's. 444 NW 2nd Avenue Miami, Florida 33130 Re: BayView Market / Major Use Special Permit / Modification requests Based on Planning & Zoning Review Meeting on March 29, 2007 P+W ##810056.000 Dear Ms. Gelabert- Sanchez and Ms. Slyzak; t: 305.569_ 1333 f: 305.569.1334 wwwperkinswill.com In response to review comments delivered to us at our meeting with the Planning & Zoning Department officials on March 29, 2007, BDB Miami, LLC (Owner) is requesting the City of Miami to consider and revise the current Major Use Special Permit with the inclusion these modification clarifications and requests. These modifications are needed in order for the project to continue on into development and construction with the greatest possible expediency. The following is a summary of the adjustments subject to approval by the City of Miami and are accompanied by drawings3which depict said requested modifications: Sheet A201 CHANGES INVOLVED: • The traffic islands at the two vehicular entrances/exits in the building will be reduced to allow the pedestrian pavers to run unobstructed across the traffic lanes. • Pedestrian paving system and associated sidewalk ramps will be added at the service and receiving entrances at the west side of the building. • The first floor retail space depths will be unchanged from the original MUSP approved drawings. The floor area of these spaces has been added to the plan. Sheet A202 CHANGES INVOLVED: • Spandrel glass and aluminum framing system will be extended behind the building entrance signage zones and above the vehicular entrances/exits to provide a uniform facade per the approved MUSP drawings. NORTH AMErRICA i ASIA ! WOOLFF J4S1- 1 AFRICA 1 CI -MOPE Sheet A301 CHANGES I1<VOLVED: • Spandrel glass and aluminum framing system will be extended behind the building entrance signage zones and above the vehicular entrances/exits to provide a uniform facade per the approved MUSP drawings. • The aluminum framing and glass handrail facade at the atrium openings between the big - box retail structure and the parking structure have been revised to a more open design solution. One that involves transparent glass handrails only. This is based on UDRB review comments to open up this facade with more unobtrusive views to the city from the atrium. • The metal wall screening systems at the west, south and north building elevations will be detailed to match the design intent of the approved MUSP drawings. • The north elevation of the parking structure (facing the cemetery) has been revised to match the north elevation of the retail structure providing a uniform cemetery building facade and to match the design intent of the approved MUSP drawings by screening the parking function from view. • The curved glass structure at southeast building corner has been revised to include a hierarchy of mullion patterns within the design intent of the approved MUSP drawings. Sheet A301A • This is a new sheet with an enlarged north elevation and wall section of the typical building facade metal wall screening system. Sincerely, Gene N. Kluesner, AIA, LEER PERKINS+WILL Enclosure: 5 sets 11x17 of MUSP modification request drawings. Sheets A201, A202, A301, and A301A (4 modified signed & sealed sheets per set) CC: Jeffrey Weil, BDB (for distribution) George Valcarcel, P+W Pat Bosch, P+W Iris Escarra, Greenberg Traurig Lucia Dougherty, Greenberg Traurig + www.perkinswilf.cam SITE AND BUILDING DATA 4/11/2007 NET LOT SIZE : 7.37 ACRES 321.031 SO .FT. 101100ION 200,2 :'NET 512E OF LOT PLUS HALF AREA OF ADJOINING STREET RIGHT-OF-WAy RIGHT OF WAY - 54,126.6 50, FT. AN0 70' OF ANY PUBLIC OPEN SPACE' 5 76' OF ANY PUBLIC OPEN $PACE, CEMENTERY CEMETERY-T 63,524.3 SQ,FT TOTAL GROSS LOT AREA {LOT 512E .SECTION 250.2) 436.567.9 50. FT. BUILDING SQUARE FOOTAGE FIRST FLOOR MAN RETAIL 104,747 SO FT SUPPORT 2,750 S0. FT. OTHER CIRCULATION 2.023 SQ. FT. RETAIL - STREET SIDE 8.530 SQ. FT. VERTICAL CIRCULATION Nan FAR 5,210 50_ FT. LOADING Nan FAR 22,185 5O. FT. MEP Non FAR 4,033'S0. FT. FAR SF 115,0505Q_ FT. TOTAL FIRST FLOOR SF. 153',709 SO. FT. SECOND FLOOR MAIN RLTAR. 446,167 SO, FT. SUPPORT 0 5O. FT. OFFICE - F€R5T LEVEL 6.650 SO. FT. OFFICE - SECOND LEVEL 6.650 SP. FT. OTHER CIRCULATION 6,799 S0. FT. VERTICAL CIRCULATION Non FAR 8,966 551, FT. MEP Nan FAR A SQ. FT. FAR 5F. 460,565 5Q. FT. TOTAL SECOND FLOOR 5F- 180,631 5Q. T'C. THIRD FLOOR MAIN RETAIL 140.167 50 FT. SUPPORT 0 SQ. FT. OFFICE - FIRST LEVEL 6,650 SQ. FT. OFFICE - SECOND LEVEL 6,650 50, FT. OTHER CIRCULATION 6,70a SET. FT. VERTICAL CIRCULATION Nan FAR 8,965 SO. FT. MEP N. FAR 0 SQ. FT. FAR SF. 169,666 SO. FT. TOTAL TH4R0 FLOOR SF. 160,891 SO. FT, FOURTH FLOORMA€N RETAIL 106,443 S0. FT. SUPPORT 0 5O_FT. OTHER CIRCULATION 1,132 S0. FT. MEP Nan FAR 0 S0. FT. VERTICAL CIRCULATION Nan FAR 8,343 5Q. FT. FAR SF. 137.575 50. FT. TOTAL FORTH FLOOR SF. 145,916 SQ. FT. INTERMEDIATE LEVFL52,4,6,6,9,10 5Q. F7'. SUPPORT 0 5G_ FT. OTHER CIRCULATION 6,564 SQ, FF. MEP Non FAR 0 SQ. FT. VERTICAL CIRCULATION Non FAR 56,016 SO. FT. FAR 5'F, 6,554 SO. FT. TOTAL PARKING LEVELS 5F, 67,460 SO. FT. TOTAL RETAIL GRO55 FL. AREA 530.089 S0, FT. TOTAL FAR 5F, 563,551 50. FT. 1 TOTAL BUILDING SQUARE FOOTAGE¢sbass`I'-91kysf1"lµ;'..$p'."<:}j'?,`I;w PARKING STRUCTURE OFrION B FIRST FLOORGARAGE FIRST FLOOR 0EZZ. LEVEL GARAGE (15F A -FLOOR) Garage Breezeway SECOND FLOOR GARAGE Garage Breezeway SECOND FLOOR MEZZ. LEVEL GARAGE (2NC A -FLOOR} Garage Ureezerray THIRD FL0©R GARAGE Garage Breezeway THIRD FLOOR ME3E. LEVEL GARAGE (,IRO A-FLOi3Rl Garage Breezeway FORTH FLOOR GARAGE Garage 13+6ezeway FORTH FLOOR MEZZ, LEVEL GARAGE (4TH A.FLOOR) Garage Breezeway 9TH LEVEL GARAGE GARAGE ROOFS RETAIL ROOF SLOE PARKING DECK h TOTAL PARKING SQUARE FOOTAGk.171" 167,100 5C. FT 100,16E1 SC. FT. 10,400 St?. F,. 163,015 50. FT. 10,460 SP. FT. 103.015 SC. FT 10.400 SO FT. 103,015 SO. PT. 16.456 SO. FT 183.615 SO. FT. 10,400 SC. FT 160.10 SCO. FT. 10,400 SO. FT 106.076 SC. FT. 16 400 SO. FT. 245,765 Sp. FT. 245755 SO. FT PT; FAN a TOTAL FAR 1.T2 OF GROSS (436.0671 SQ. FT.) FAR CALCVIATION=FAR SF_ 7 GROSS LOT AREA BUiLOING (HABITABLE) F.A.R. GARAGE PORTION E5CEMPT FROM F.A.R. CALCULATION S- 3a gg43 ,�f§fYfkt�.Ab�Rt fis 'r.' ,-i 2Fc:;$Q6,A6% 764,543 SP .FT. 732,718 5F. AVAILABLE MAXIMUM FOOTPRINT REQUIREMENTS 0.8 OF GROSa MULTIPLIER 9.6 436,667.9 $0.6T X 0.0 263,24 a 5C. FT FOOTPRINT PROVIDED BASED ON ALL OF RETAIL. GIRCULATIQF 250,547 SQ. FT. ANO GARAGE GREEN SPACE REQUIREMENTS 0,1 OF GROSS MULTIPLIER 0.1 436,667.9 SOFT X0,1 43.860 SQ. FT. GREEN SPACE I PERVOIUS PROVIDED 50,325 Sp_ FT. HEIGHT LIMITATION 42O FT PROPOSED MAXIMUM HEIGHT (with relail side parking deck} 140 FT. " HabilaSle Space eaigist is 120 FT. REQUIRED SETBACKS NO SETBACKS REG111REP EXCEPT FOR 10' SE79ALsc AT NORTH PROPERTY LINE AND A 5' LANDSCAPE SETBACK ROUND RETAIL PARKING RED. I PER 300 5F OF RETA1. GRO55 FLOOR AREA 1765 SPACES FOR Relaii p16a 6O spaces for nilces 1,5=15 PARKING PROVIDED_ SURFACE. GARAGE AND RETAIL DECKS €rcluslee narrdicaped spaces .12.543, HANDICAPPED PARKING REQUIRED FOR RETAIL 2: 90 SPACES 43 SPACES PROVIDED LOA1ANG BERTHS REQUIRED 5 (as per section 9.23) 7 PROVIDE& ZONNG CLSSSIRCATFON C•2 Liberal Camznrrclal Af0 1iec1'. PER17lNS5WILL Greenberg Traurig VIA HAND DELIVERY Ms. Ana Gelabert-Sanchez Director, Planning Department City of Miami 444 S.W. Second Avenue, 3rd Floor Miami, Florida 33128 01111i,171 r 20 7 MAR 23 PH 1: 18 February 1, 2007 Re: Bayview Market located at 1700 NE 2nd Avenue, Miami, FL iris V. Escarra Tel. (305) 579-0737 Fax (305) 961-5737 esca rraigigtiaw-cor Dear Ms. Gelabert-Sanchez: Please accept the following revised plans for Bayview Market dated January 23, 2007, to replace the plans submitted with our Non -Substantial request of August 31, 2006. The plans have been modified to eliminate the variance required as well as other minor modifications as further explained by Scott Finkler of Perkins & Will (attached hereto). Furthermore, we would like to request that these plans be approved in lieu and are intended to replace the original set of approved MUSP plans, therefore we are withdrawing our request for these plans to be approved as an optional set of plans as indicated in our initial non -substantial request. Thank you very much for your assistance in this matter. Should you have any questions or concerns, please feel free to call me at (305)579-0737. Iris V. Escarra, Esq. cc: Jeff Weil, BDB Miami, LLC Lucia A. Dougherty, Esq. GreenbergTraurig, P.A. l Attorneys at Law 1221 Brickeli Avenue Miami, FL 33131 E Tel 305.579.0500 1 Fax 305.579.0717 1 wv gtlaw.com MIA 179533529v2 065556010105 Greenberg Traurig August 31, 2006 Ms. Ana Gelabert-Sanchez Ms. Lourdes Slayzk Planning and Zoning Department 444 S.W. 2nd Ave. — 3rd Floor Miami, FL 33130 iris Escarra (305) 579-0737 esearrai@gtiavv.com RE: Bayview Market, Resolution No. 05-0350 Request for Non -Substantial Modification Approval for alternative plan. Dear Ana and Lourdes: On behalf of the owner of the above referenced property, BDB Miami, LLC, we are requesting approval as a non -substantial modification from the City of Miami for this alternative plan for the project Please note that our request does not seek to modify our original approval, however, to provide an alternative permissible plan which may be pursued dependant on the outcome of pending litigation. Attached please find a letter dated August 28, 2006, (attached as Exhibit "Al from George Valcarcel of Perkins + Will with a detailed explanation of the alternative modifications proposed in this non -substantial request, as well as a set of plans dated August 28, 2006. The Bayview Marketplace was approved pursuant to Resolution No. 05-0350 for a Major Use Special Permit (attached as Exhibit "B" ). Finally, enclosed please find a check totaling $3,000 for the application fee for the non - substantial change determination. Thank you very much for your time and attention to this matter. Should you have any questions, please feel free to contact me at (305) 579-0603. LAD:ive Enclosures cc: Frank Rosenblum, SDB Miami LLC Lucia Dougherty, Greenberg Traurig iris Escarra, Esq. Greenberg Traurig, R.A. Attorneys at Law i 1221 BrickeU Avenue I Miami, FL 33131 TeL 305.579.0500 Fax 305.579.0717 ( www.gttaw,com ' 7. • • ' AMIIIIIMEIMMIIMMI P. A E o''11 U! — • frOrAlir 7.9rOITAT M tiN VW MAW 460,'V I 999 Ponce De Leon Blvd, Suite 915 Cosa/ Gables, FL 33134 Urneotoo PERKINS + WI L L August 28, 2006 Ana Gelabert-Sanchez, Planning Dept., and Lourdes Slyzak, Zoning Dept City of Miami / Zoning and Planning Dept's. 444 NW 2nd Avenue Miami, Florida 33130 Pe: SayView Market / Major Use Special Permit / Modification requests. P-i-W #810056.000 Dear Ms. Gelabert- Sanchez and Ms. Slyzak; t: 305.569.1333 f: 305.569.1334 www.gerkinsw/ll.con BDBMiami, LLC (owner) is requesting the City of Miami to consider and revise the current Major Use Special Permit with the inclusion two modification requests. Please note that the Height modification (Package #1) is an alternative plan not modifying the original. Both these modifications are needed in order for the project to continue on into development and Construction with the greatest possible expediency. The following is a summary of the adjustments subject)to approval by the City of Miami and are accompanied by drawings which depict said requested modifications: Height Modification (Package #1) — The owner is requesting this modification to be optional at their discretion. The currently approved MUSP building height is still intended to be built as approved. CHANGES INVOLVED: A. Building Height - The height modification package included herein reduces the height of the building by 20 ft. The currently approved height of 140 ft to the 1Dtn floor parking deck wouid.be_reduced to 120 ft, 8. Additionally affected - • The first floor big box would require a reduction from 35 ft (first to second floor) to 30 ft. All other big box retail spaces would continue to be 30 ft floor to floor. • Parking deck at 10th floor would be eliminated. - • Parking decks floor to floor elevations would adjust to 10 ft floor to floor in lieu of the current 15 feet (parking areas only). • building exterior elevations would not change; only adjust to vertical dimension depicted, above. Ground floor big box tenant modification (Package #2) - The owner is requesting this modification to be made to include the specific requirement of a specific big box / ground floor tenant. Modifications are required in order to accommodate the specific business operations of said tenant. CHANGES INVOLVED: A. Ground floor site changes - • Perimeter security enclosure has been added off of 17th terrace. This shall provide a secure exterior area for a "Garden Center" (previously approved by the MUSP). Glazed double doors shall be added between currently planned planters. A glazed perimeter boundary shall be added in order to secure merchandize access during and after hours of operations. Please see plan for Display rack placement layout. • Glazed retractable doors shall allow for a mobile building envelope. The intent is to expand the outdoor garden center into the building during normal working hours. Retractable system is intended to be closed after store hours. • Truck access off Miami Avenue -- The target tenant has requested additional loading bays. They have been internalized by providing access of NE Miami Place. The access points shall be gated for security purpose after hours. • Mezzanine addition - The target tenant shall require mezzanine space for their operations. This mezzanine space shall respect F.A.R. count. Final Tally shall be under the allowable FAR and shall be reflected in final design/construction documents. ' Sincerely PERK! George Vdicare AIA Associate Principal Enclosure: 5 sets 11x17 of MUSP with inserted modification request drawings. (9 modified signed & sealed sheets per set) GG: Frarvk-R-osenb- m, -BD (for distribution) Pat Bosch, P-+W iris Escarra, Greenberg Traurig Gene Kluesner, P+W File 999 Ponce lie Leon Blvd. Suite 915 Coral Gables, Ft 33134 ^✓CD39: �� PERKINS + W I L L January 26, 2007 Ana Gelabert-Sanchez, Planning Dept., and Lourdes Slyzak, Zoning Dept City of Miami / Zoning and Planning Dept's. 444 NW 2"d Avenue Miami, Florida 33130 Re: BayView Market / Major Use Special Permit / Modification requests. P+W #810056.000 Dear Ms. Gelabert- Sanchez and Ms. Slyzak; t: 305.569.1333 f: 305.569.1334 www.perkinswill.com BDBMiami, LLC (owner) is requesting the City of Miami to consider and revise the current Major Use Special Permit with the inclusion three modification requests. These modifications are needed in order for the project to continue on into development and construction with the greatest possible expediency. The following is a summary of the adjustments subject to approval by the City of Miami and are accompanied by drawings which depict said requested modifications: Height Modification (Package1#1) — The owner is requesting a reduction of the height of the building by 20 ft. The currently approved height of 140 ft to the 10th floor parking deck would be reduced to 120 ft (Maximum as required by code for this site). CHANGES INVOLVED: A: Big box retail spaces above the first floor big box space would be 24'-4" floor to floor. • Parking decks floor to floor elevations would adjust to 12'-2" floor to floor in lieu of the current 15 feet (parking areas only). • Building exterior elevations would not change; only adjust to vertical dimension depicted, above. Ground Floor Big Box Tenant Modification (Package #2) — The owner is requesting this modification to be made to include the specific requirement of a specific big box / ground floor tenant. Modifications are required in order to accommodate the specific business operations of said tenant. CHANGES INVOLVED: A. Ground floor site changes — • Perimeter security enclosure has been added off of 17th terrace. This shall provide a secure exterior area for a "Garden Center" (previously approved by the MUSP). Glazed double doors shall be added between currently planned planters. A glazed perimeter boundary shall be added in order to secure merchandize access during and after hours of operations, Please see plan for Display rack placement layout. • Glazed retractable doors shall allow for a mobile building envelope. The intent is to expand the outdoor garden center into the building during normal working hours. Retractable system is intended to be closed after store hours. • Truck access off Miami Avenue — The target tenant has requested additional loading bays. They have been internalized by providing access of NE Miami Place. The access points shall be gated for security purpose after hours. • Mezzanine addition — The target tenant shall require mezzanine space for their operations. This mezzanine space shall respect F.A.R. Final Tally shall be under the allowable FAR and shall be reflected in final design/construction documents. Parking Garage Liner Modification (Package #3) — The owner is requesting the modification of the parking garage liner use from residential units to ancillary office space for the building owner and tenant use. CHANGES INVOLVED: A: On third floor through sixth floor the original MUSP approved plans contained residential units. This modification package changes these spaces to office use. • Proportions of spaces are altered per the plans. Previous residential spaces had a width of 24'-0", the new office spaces have a width of 141-0" • Total floor area of these spaces is reduced by 26% • Residential units contained lofts on two floors. Office space uses the entire floor plate on 4 floors. • Building exterior elevations would not change. Sincerely, Scott Finckler PERKINS+WILL Enclosure: 5 sets 11x17 of MUSP with inserted modification request drawings. (17 modified signed & sealed sheets per set) CC: Jeffrey Weil, BOB (for distribution) George Valcarcel, P+W Pat Bosch, P+W Gene Kluesner, P+W Iris Escarra, Greenberg Traurig M.U.S.P. MODFICATION SITE AND BUILDING DATA NET LOT SIZE 1 /26/2007 T.37 ACRES 329,637 SQ .FT, SECT€ON 250.2 :'NET SIZE Of LOT PLUS HALF AREA OF ADJOINING STREET RIGHT-OF-WAY RIGHT OF WAY'. AND 7E' OF ANY PUBLIC OPEN SPACE" & 70' OF ANY PUBLIC OPEN SPACE. CEMENTERY CEMETERY - TOTAL GROSS LOT AREA (LOT SIZE > SECTION 256.2) BUILDING SQUARE FOOTAGE FIRST FLOOR MAIM RETAIL SUPPORT OTHER CIRCULATION RETAIL - STREET 90E VERTICAL C0RC1,1L.7TICN Non FAR LOADING Non FAR MEP Nan FAR FAR SF_ TOTAL FIRST FLOOR SF. SECOND FLOOR€+.IN RETAIL SUPPORT OFFICE - FIRST LEVEL OFFICE - SEC;1N0 LEVEL OTHER CIRCULATION VERTICAL CIRCULATION Nan FAR MEP Non FAR FAR SF. TOTAL SECOND FLOOR SF. THIRD FLG0F_MAIN RETAIL SUPPORT OFFICE - FIRST LE'.0L OFFICE - SECOND LEVEL OTHER CIRCULATION VERTICAL CIFO0LAT;0F3 Non- FAR MEP Nun FAR FAH SF. TOTAL THIRD FLOUR SF. FOURTH FLOOR MAIN RETAIL SUPPORT OTHER CIRCLLATIQN MEP Non FAR VERTICAL CIRCVLA+ION Nan FAR TOTAL FOR'H- FLOOR SF. FAR SF. 54,126.7) SO. F7. 61524 a SQ,F1 436,667.13 SQ- FT. 104,747 SQ. FT. 2,760 SQ. BT. 2,023 SO. FT. 7,602 50. FT. 4,210 SQ. 61. 22,165 50, FT, 4,033 SQ. FT_ 117,152 5Q, FT. 152,660 SQ, FT. 146,187 SQ. F7_ 050. FT. 5,850 SQ. FT. 9,860 SQ, FT. 8,799 SQ. PT. 8,965 SO. FT. 6 S0. FT, 180,696 5Q. FT. 169,839 5Q. FT. 140,157 SQ, FT. 0 SQ. FT. 6,850 SQ. FT, 0,850 5Q. FT. 6,799 SO FL 8,965 5Q. FT. 0 SQ. FT. 160,668 5Q- FT. 169,631 SQ. FT. 136,143 SO. FT, 0 5Q FT, 1.132 SQ. FL 0SQ FT, 6,343 B0. FT, 137,575 SQ, FT, 146,916 SQ. FT, INTERMEDIATE LELELS2.4,8 e,9.10 SUPPORT OTHER CIRCl.LA7€[N MEP Non FAR VERTCAL CIRCULATION Non FAR FAR SF, TOTAL PARKING LEarELS SF, TOTAL RETAIL GROSS ^L. AREA TOTAL FAR SF. 1 TOTAL BUILDING SQUARE FOOTAGF SQ FT. 0 SQ FT, 6,561 S0, FT. 0 5Q. FT. 50,016 SQ, FT. 6,564 5Q, FT_ 57,480 SQ. F7. 529,12E SQ. FT, 562,623 5Q, FT. PARKING STRUCTURE 0F'710N FIRST FLOORGARAGE 107.100 5Q. F7. FIRST FLOOR MEXZ. LEVEL GARAGE (15T A -FLOOR} 100,100 SO. FT. Garage Breezeway SECOND FLOOR GARAGE Garage Breezeway SECOND FLOOR MEZZ, LEVEL GARAGE (2ND A -FLOOR) Garage Breezeway THIRD FLOORGARAGE Garage Breezeway THIRD FLOOR 61E2Z- LEVEL GARAGE (3RD A -FLOOR) -Garage Breezeway FORTH FLOOR GARAGE Garage Breezeway FORTH FLOOR ME22, LEVEL GARAGE (47H A.FLOOR) Garage SPeezeway 9TH LEVEL GARAGE 245,755 SO. FT. GARAGE ROOF& RETAIL ROOF SIDE PARKING DEC!( ,�^ 245,765 S0. FT, TOTAL PARKING SQUARE FDOTAGq-;','?,ki(fGC480,,01%'$y21r5)))))ifl 10.400 SQ. FT. 103,015 50, FT 10,400 SQ. FT, 100.016 SQ. FT. 10,400 $Q, F7, 103,015 50. FT. 10,400 5Q, FT. 163,015 SO- FT- 10,400 SQ, FT. 100,100 SO, FT. 10,400 SQ. FT. 100,106 SQ_ F7. 10,400 5Q. FT, FAR - TOTAL FAR 1,72 OF GROSS (436,687.9 SQ. FT.) FAR CALCULATION7FAR 5F.1 GROSS LOT AREA BUILDING (HABITABLE) FAR_ GARAGE PORTION EXCEMPT FROM F.A.R. CALCULATION .-BO.gipBBc24o,,..W1F.fa}; S*'. 754,643 SQ FT. 137.71a SF. AVAfLAALE MAXIMUM FOOTPRINT REQUIREMENTS 06 OF GROSS MULTIPLIER 0.6 131,887,9 SQ.FT X 0.0 263,213 SO. FT_ FOOTPRINT PROVIDED BASED ON ALL OF RETAIL, CIRCULATION 259,547 SG, FT. AND GARAGE GREEN SPACE REQUIREMENTS 0.1 OF GROSS MULTIPLIER P.1 436,687.9 SQ.FT X6.1 43.690 SQ. FT. GREEN SPACE! PERVOIUS PROVIDED 50.325 SQ. FT, HEIGHT LIMITATION 120 FT, PROPOSED MAXIMUM HEIGHT (with 15147 side pa1Ming deck) 140 FT. " llal€lahla Space height is 120 FT. REQUIRED SETBACKS NO SETBACKS REQUIRE() EXCEPT FOR 10' SETBACK AT NOR FM AROPERTI LINE AND A 5' LANDSCAPE- SETBACK ROUND RETAIL PARKING RED. 1 PER 300 SF OP RETAIL GROSS FLOOR AREA 1765 SPACES FOR Retell 1,765 PARKING PROVIDED. SURFACE, GARAGE ANC. RETAIL DECKS €rriudea handlcaped spaces T' HANDICAPPED PARKING HEQU€0E0 FOR RETAIL 2% 40 SPACES 48 SPACES PROVIDED LOADING BERTHS REQUIRED 5 (as per 064110., 9.231 7 PROVIDED ZONING CLASSIFlGA77ON 0.2 L16ar4! Cornmerclel Arcairece7ERKINS+WILL. ORIG NAL M.U.S.P. SITE AND BUILDING DATA NET LOT SIZE 6.715 ACRES 17,37 ACRES) 379,628 SQ FT. (321,037 SF) BUILDING Sg15ARE FOOTAGE SECTION 250.2 'TOTAL GROSS .,OT AREA (LOT SIZE + SECTION 26E32) FIRST FLOOR MAIN RETAIL RETAIL - STREET SIDE CIRCULATION SECOND FLOOR MAN RETAIL LOFTS - FIRST (LEVEL (12 UNITS) LOFTS- SEOOA7 LEVEL €12 UNITS) CIRCULATION RETAIL 7.7E150511NE ••• THIRD FLOOR GAIN RETAIL (FUTURE) LOFTS - FIRST LEVEL (12 UNITS) LOFTS - SECOND LEVEL (12 UNITS) CIRCULATION SHARD GyM F .7 CITIES 5ETAII. MEZZAJ]NE "' FOURTH FLOOF MAN RETAIL (FUTURE) 55 67440 SO. FT,(117,650,9 SF) 435,562.0 50, FT (438,967.9 50) 131,900 513. FT. 14.325 50, FT. 24,111 SO. FT. 160,925 SO. FT, 12509 50, FT. 6,166 110 FT. 16,999 SQ. FT. 7,441 5Q. FT. 160,676 SA. FT. 12 500 SQ_ FT. G,106 SQ. FT. 16,599 SQ. FT. 2,947 S0, FT, 7,441 SQ, FT. 160,075 5Q. FT. TOTAL. BUILDING SQUARE FOOTAGE PARKING STRUCTURE 11)55h Garage and Relall side Par OPTION 8 FIRST FLOOR GARAGE FIRST FLOOR h 7Z. LEVEL GARAGE E5ST A -FLOOR) Garage Breezeway SECOND FLOOR GARAGE Garage Breezeway Z.ECOND FLOOD MEZZ, LEVEL GARAGE (2N0 A -FLOOR) Garage Breezeway THIRD FLOOR GARAGE Garage Brsaaeway THIRD FLOOR KZ.Z LEVEL GARAGE (3R0 A -FLOOR) Garage Breezeway FOURTH FLOOR LEVEL GARAGE (4TF1 A.FLOOR) Garage Breezeway FOURTH FLOOR ME.X. LEVEL. GARAGE (41H A -FLOOR) Garage Breezeway FIFTH FLOOR -GARAGE 8 RETAIL 510E PARKING DECK GARAGE ROOF 6 RETAIL ROOF 5€120 PARKING DECK 107.100 SO. FT. 96,7119 5O. FT. 10 400 SO, Ff_ 9E3,700 S0, PT. 10,400 5C; FT. 06,700 SO. FT. 10,409 SO, F7, 96,700 SO. FT. 10,400 5Q PT. 96,700 50, FT. 10.460 SQ. FT, 96.700 SO. FT. 10.400 SO. FT. 66.790 50. FT, 10,4(10 SQ. FT, 242_365 K0. FT, 242,365 SG. FT. TOTAL PARKING SAUARE FOOTAGE * (RED) indicates corrections to original M,U.S.P. Site an FAR e 1,72 OF GRO53 (436,646.9 5O, FT.()438,687,9 SF.) 749963 552 ,FT,(754,543 5F) A00'L FAR CREDIT OF 70' TIMES THE LENGTH OF PROPERTY (907,49') ADJACENT TO CEMETERY FEET MULTIPLIER 1 ENG7N IN FEET 701 860 60,200 SO FT. (1/010) TOTAL FAR OF 1.72 OF GROSS AND CREDIT 609,263 SQ .FT, BUILDING (HABITABLE) F.A.R, GARAGE PORTION EMCENPT FROM F.A.R. CALCULATION 86% OF F.A.R. 15 MAXIMUM FOOTPRINT REOLIIREMFNTS 0.6 OF GROSS 030.667.9 g.s,1.) (263,219 5F.) MULTIPLIER 0.8 (435,502 9.s.1. X .6)s 763,166 5Q. FT. FOOTPRINT PROVIDED BASED ON ALL OF RETAIL. CIRCULATION 246,196 SO. FT. AND GARAGE GREEN SPACE REQUIREMENTS 0.1 OF GROSS (43,669 SF,) MULTIPLIER 0,1 43,550 S0. FT. GREEN SPACE 5 PERV0IL}5 PR0v1DE0 43,900 SO. FT. HEIGHT LIMITATION 170 FT, PROPOSED) MAXIMUM HEIGHT (will) retail side parking deck) 140 FT, -• Hab11eble Space he€9h1 Is 120 FT. REQUIRED SETBACKS NO.SETEACKS REQUIRED EXCEPT FOR 10' SETBACK AT NORTH PROPERTY LINE AND A 5' LANDSCAPE SETBACK ROUND RETAIL OR PARKING REQUIRES 2 PER LOFT OR 2 X 24 UNITS UNITS PARKING RED.! UNIT PARKING PROVIDE 24 2 2 4R PARKING RED. 1 PER 1000 SF OF GROSS BUILDING 656 SPACES FOR ReleiE 48 spaces 734 for Residential= PARKING PROVIDED: SURFACE, GARAGE AND RETAIL DECKS 993 HANOICAPE PARKING REQUIRED RETAIL 2% 14 Spaces requed. 16 SPACES PROVIDED LOADING BERTHS REQUIRED 5 (as per sector, 9,23) 5 PROVIDED ZONING CLASSIFICATION C-2 Liberal Commercial Project ;RAYVIEW MARKET -1700 NE 17 STREET Owner: BOB MSAMI, LLCt Arch4e5_ PERKINS+W€U,