Loading...
HomeMy WebLinkAboutSUBSTITUTED DEP Agreement No. CZ603SUB EXHIBIT A DEP GRANT CZ603 AMENDMENT NO, 1 TUTED DEP AGREEMENT NO. CZ603 AMENDMENT NO. 1 THIS AG ENT as entered Into on the 22nd day of November, 2005, between the STATE OF FLORIDA DEPART h NT OF ENVIRONMENTAL PROTECTION (hereinafter referred to as the "Department") and the Y OF MIAMI (hereinafter referred to as "Grantee") is hereby amended. WHEREAS, the Grant. determines that it is necessary to amend Project Objectives and Related Tasks and Deliverables as shown in Mac nt A to the original Agreement and to extend the project period ending date to June 30, 2007; and ' WHEREAS, the Department, a• 'ng as the Florida Coastal Management Program, agrees with the Grantee that the amendment is needed. NOW, THEREFORE, DEP Agreemen o. CZ603 is hereby amended as follows: 1. Section (2) of the Agreement is rev se o change the ending date of the Agreement from September 30, 2006, to June 30, 2007. 2. Project Objectives and Related Tasks and De erables in original Attachment A is hereby deleted in its entirety and replaced with the Revised Proj Objectives and Related Tasks and Deliverables attached hereto as Attachment A-1 and made •a Qj. Any reference`to srctinns of Attachment A shall be replaced by reference.to the corresponding s tions of Attachment A-1. In all other respects, DEP Agreement No. CZ603 and attac is relative thereto, shall remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Amendment to be duly ecuted the day and year last written below. CITY OF MIAMI By: Date: Pedro G. Hernandez, City Manager STATE OF FLORIDA a ,!:' ARTMENT OF ENVIRONMENTAL P ' •TECTION By Sally B. Mann, Director Intergovernmental Programs Date: DEP Grants Manager APPROVED 'as to form and legality: SUBSTITUTED ATTACHMENT A-1 PROJECT WORK PLAN FY04-05 DEP Agreement # ' 603 Protect Title: Develo.in a M to Pan for laml' V Recipient Organization Name: City ofMia Chief Elected Official or Agency Hea+ Robert Ruano Title: Grant Administrator Address: 3500 Pan American Drive Zip Code: 33133 Area Code and Telephone Number: (305) 416.1 Area ode and Facsimile Machine Telephone Numbe (305) 416-2151 E-Mail Address: R.Ruano@ci.rniami.fl.us Trolect Manner Organization Name: City of Miami Name: Enrique Nunez Address: 444 SW 2'd Avenue, 3rd floor Zip Code: 33130 Area Code and Telephone Number: (305) 416-1419 Area Code and Facsimile Machine Telephone Number: (305)416-2156 E-Mail Address: ENunez@ci,miami.fl.us Mailing Address for Warrant (if other than the Recipient address): County In which project Is located: Miami -Dade Project is Statewide: SU BSTITUTED Scope of Wrk Information Abstract Descr solution to the problem, Virginia Key is a natural ba the Port of Miami and Mia plan will be initiated to devise waterfront development, recomm flow to the historic Virginia Key B Interpretive Trail, and other island - existing conditions and conduct a site draft master plan and final report, and co n: Briefly but completely describe the problem to be addressed and the project a e limit to one page, island that lies within Biscayne Bay and is located proximate to downtown Miami, h. In order to preserve the island's unique natural beauty and character, a master o d map' for preserving the island. The master plan will focus on mixed -use ded improvements to the existing sewage treatment plant, restoration of tidal h Park, protection of wetlands and upland habitats along the Virginia Key provements, FCMP funds will be used for contract services to survey ysis of Virginia Kcy, facilitate a community design workshop, produce a dinate project -related meetings to steer work -in -progress SUBSTITUTED o`ect b'ectives and Related Tasks and Deliverables: List project objective(s) and tasks that will cornplish each objective. indicate the quarter in which these tasks will occur and will be delivered. Deliverables or ork products must be provided. Objective 1: Resea , h and Data Collection (Complete by November 30, 2006) Task 1: Survey of ex]" ing conditions and Site Analysis of Virginia Key Deliverable: Site Analy Task 2: Research Histori;' eferences Deliverable: Site Inventor Task 3: Review pertinent pla and studies Task 4: Environmental Resear Task 5: Economic Analysis Task 6: Traffic Consultant/Analyst Objective 2: Community Design Wo shop (Complete by November 30, 2006) Task 1: Local Community Meetings Task 2: Community Public Information W shop Objective 3: Producing a Draft Master Plan omplete by February 28, 2007) Task 1: Preliminary Master Plan Task 2: Final Master Plan and •Implementation Sir gy Deliverable: Copy of Final Master Plan Task 3: Virginia Key Urban Design Regulations Objective 4: Master Plan Documentation and Commu ation (Complete by April 30, 2007) Task 1: Master Plan Report Deliverable: Copy of preliminary draft of master plan report Task 2: Preparation, Printing, Copying, etc. of Master Plan Rep Deliverable: One (1) bound copy and one (I) electronic copy oft Master Plan Report and Virginia Key Urban Design Regulations Task 3: Mounted Renderings Task 4: Virginia Key Master Plan Website and Public. Information Eye Community Bulletins Deliverable: Copy of public information flyers/community bulletins. Task 5: Format of Deliverables Objective Si Master Plan Protect Administration (Complete by May 31, 20 Task 1: Plan Public meetings with city and county staff Task 2: Hold public meetings SUBSTITUTED Pro'ect no cents) and lea the FCMP funds re purchased please co be from a noncompetit transfer of funds (within budget, is allowed withou Budget C'ateiory 1. Salaries 2. Fringe Benefits 3. Travel 4. Equipment Purchases 5. Supplies 6. Contractual Services T. -Cc riJrction 8. Other Expenses 9. Indirect Charges FCMP Total Match Total Total Project Cost: hedule: T dollar amounts only in applicable categories (round to the nearest dollar; other categories blank, If your grant Agreement requires match, it must, at a minimum, equal . ested, or one hundred percent (100%). If Automated Data Processing equipment is being lete and submit Appendix 1. lithe cost for any service or equipment is over S25,000 and will sole source, please also submit a Sole Source Justification Form (Appendix 2). A budget ed budget categories), in an amount not to exceed 10 percent of the FCMP total ucsting an official amendment, FCMP Funds 0 000 50.000 S100.000 MATCH Funds 9.200.00 4.302.00 6.000.00 11.546.00 18.9 52.00 50.000 SUBSTITUTED Pro"e Budet Narrative: Describe line items for each applicable budget category shown on the budget hedule. Provide sufficient detail to show cost relationship to project activities. Complete for both FCMP a match items, if applicable. If in -kind match is being provided by a third party, a letter from that party .nfirming the amount and type of that match must be included with this project work plan. Note: Indirect c ' is are not allowed as match. FCMP Funds: Contractual; S50,000 FCMP funds will be use. owards the full cost of the environmental consultant and towards partial costs of the landscape archilecture/.:nrting firm which equals the requested S50,000. Match Funds: Salary: $9,200 -- 100% from (local cost share) — This. represents a contribution by the applicant of 10% of the Project Manager's tim The Project Manager, a Registered Landscape Architect, will provide overall direction for the Project, Th salary figure of S92,000 is based on his current salary as an Acting Planner Ill. Fringe Benefits: 34,302 — 100% from -- The City's fringe rate for civilian personnel in the Project Manager's pay class is 46% of salary. Supplies: 56,000 -- Supplies include the follow! 1) -Photographic-and-arehitectural-relatc..upplies-irrcluding but not limited -to -foam core boards and laminating for mounting prese `' s tions and renderings of project concepts and components. 2) Reproduction of final products, reports, dra ngs, and project deliverables. 3) Software towards needed for'the creation and intenance of project website. 4) Courier services and express mailings. 5) General Office Supplies Contractual Services: 511,546 —from City. Various city staff along with a Project Manager, an experienced Pia'' er, at 10% of the project costs, will coordinate the drafting of the scope of work and assure that the proje timelines are adhered to, and that reports arc completed. The remaining funds will be used for the mast planning process. A group of consultants has been selected through the RFQ process. A landscape ar rlecture/planning firm at 42% will create and lead the process outlined in the project description. In addin , an economic consultant at 14%, an environmental consultant at 10%, an urban design consultant at 12°. and a traffic consultant at 12% will assist in the process. Qther Costs - S18,952 — I00% from City. Other costs include the preparation bathymetric surveys for water depth information required for the inventory and analyst plan study. The preparation of surveys and gathering of information necessary for th will be performed by private land surveyors for the City. nd, boundary and hose of the roaster or plan study SU BSTITUTED