Loading...
HomeMy WebLinkAboutProject Work Plan 2ATTACHMENT A PROJECT WORK PLAN FY05-06 DEP Agreement# CZ603 Proiect Ti41e: Pei/cloning a Master Plan for Miami's Virginia Key Recipient Organization Name: City of Miami Chief Elected Official or Agency Head: Robert Ruano Title: Grant Administrator Address: 3500 Pan American Drive Zip Code: 33133 Area_Code and_Tclephnne_Number: (305) 416.1532 Area Code and Facsimile Machine Telephone Number: (305) 416-2151 1~-Mail Address: RRuano@cimiami.fl.us project Manager Organization Name: City of Miami Name: Enrique Nunez Address! 444 SW 2'4 Avenue, 3'd floor Zip Code: 33130 Area Code and Telephone Number: (305) 416-1419 Area Code and Facsimile Machine Telephone Number: (305)416-2156 E-Mail Address: gNunezCrjci.miami.it.ua Mailing Address for Warrant (if other than the Recipient address): County In which project is located: Miami -bade Project Is Statewide: DEP Agreement No. CZ603, Pagel of 10 DEP 55.236 (04/05) Scope of Work Information Abstract Description: Briefly but completely describe the problem to be addressed and the project solution to the problem. Please limit to one page. Virginia Key is a natural barrier island that lies within Biscayne Bay and is located proximate to downtown Miami, the Port of Miami and Miami Beach, In order to preserve the island's unique natural beauty and character, a master plan will be initiated to devise a 'road map' for preserving the island, The master plan will focus on mixed -use waterfront development, recommended improvements to the existing sewage treatment plant, restoration of tidal flow to the historic Virginia Key Beach Park, protection of wetlands and upland habitats along the Virginia Key Interpretive Trail, and other island -wide improvements. FCMP funds will be used for contract services to survey existing conditions and conduct a site analysis of Virginia Key, facilitate a community design workshop, produce a draft master plan and final report, and coordinate project -related meetings to steer work -in -progress DEP Agreement No, CZ603, Page 2 of 10 DEP 55-236 (04/05) Proiect Objectives and Related Tasks and Deliverables: List project objective(s) and tasks that will accomplish each objective. Indicate the quarter in which these tasks will occur and will be delivered. Deliverables or work products must be provided. Objective 1: Research and Data Collection Task 1: Survey of existing conditions and Site Analysis of Virginia Key Deliverable: Site Analysis Task 2: Research Historic References Deliverable: Site Inventory Task 3: Review pertinent plans and studies Task 4: Environmental Research Task 5: Economic Analysis Task 6: Traffic Consultant/Analysis Objective 2; Community Design Workshop Task 1: Local Community Meetings Task 2: Community Public information Workshop Objective 3: Producing a Draft Master Plan Task 1: Preliminary Master Plan Task 2: Final Master Plan and lmpiernentation Strategy Deliverable: Copy of Final Master Plan Task 3: Virginia Key Urban Design Regulations Objective4: Master Plan Documentation and Communication Task 1: Master Plan Report Deliverable: Copy of preliminary draft of master plan report Task 2: Preparation, Printing, Copying, etc. of Master Plan Report Deliverable: One (1) bound copy and one (1) electronic copy of the Master Plan Report and Virginia Key Urban Design Regulations Task 3: Mounted Renderings Task 4: Virginia Key Master Plan Website and Public Information FIyers/Community Bulletins Deliverable: Copy ofpublic information flyers/community bulletins. Task 5: Format of Deliverables Objective 5: Master Plan Project Administration Task 1: Plan Public meetings with city and county staff Task 2: Hold public meetings DEP Agreement No. CZ603, Page 3 of 10 DEP 55.236.(04/05) Project Budget Schedule: Type dollar amounts only in applicable categories (round to the nearest dollar; no cents) and leave other categories blank, If your grant Agreement requires match, it must, at a minimum, equal the FCMP funds requested, or one hundred percent (100%). If Automated Data Processing equipment is being purchased please complete and submit Appendix 1. If the cost for any service or equipment is over $25,000 and will be from a noncompetitive sole source, please also submit a Sole Source Justification Form (Appendix 2). A budget transfer of funds (within approved budget categories), in an amount not to exceed 10 percent of the FCMP total budget, is allowed without requesting an official amendment. Budget Cafe2ory FCMP Funds, MATCH Funds ] , Salaries 9,200.00 2. Fringe Benefits 4.302,00 3. Travel 4. Equipment Purchases 5, Supplies 6.000.00 6 f:ontraetual.Secuices 50.000.0.0.__ U 546_00 7. Construction 8. Other Expenses 18.952.00 9. indirect Charges FCMP Total 50,000 Match Total 50.000 Total Protect Cost: $1QO,QOQ DEP Agreement No. CZ603, Page 4 of 10 DEP 55.236 (04/05) Proiect Budget Narrative; Describe line items for each applicable budget category shown on the budget schedule, Provide sufficient detail to show cost relationship to project activities. Complete for both FCMP and match items, if applicable. If in -kind match is being provided by a third party, a letter from that party confirming the amount and type of that match must be included with this project work plan. Note: Indirect costa are not allowed as match. FCMP Funds: Contractual: S50,000 FCMP funds will be used towards the full cost of the environmental consultant and towards partial casts of the landscape architecture/planning firm which equals the requested $50,000. Match Funds: Salary: $9,200 — 100% from City (local cost share) — This represents a contribution by the applicant of 10% of the Project Manager's time. The Project Manager, a Registered Landscape Architect, will provide overall direction for the Project. The salary figure of $92,000 is based on his current salary as an Acting Planner Ill. Fringe Benefits: $4,302 -- 100% from City — The City's fringe rate for civilian personnel in the Project Manager's pay class is 46% of salary. Supplies: $6,000 — Supplies include the following: 1) Photographic and architectural related supplies including but not limited to foam core boards and laminating for mounting presentations and renderings of project concepts and components. 2)—Re fiduc ton o final products, reports, drawings, and project deliverables. 3) Software towards needed for the creation and maintenance of project website. 4) Courier services and express mailings, 5) General Office Supplies Contractual Services: $11,546 —from City. Various city staff along with a Project Manager, an experienced Planner, at 10% of the project costs, will coordinate the drafting of the scope of work and assure that the project timelines are adhered to, and that reports are completed. The remaining funds will bo used for the master planning process. A group of consultants has been selected through the RFQ process. A landscape architecture/planning firm at 42% will create and lead the process outlined in the project description. In addition, an economic consultant at 14%, an environmental consultant at 10%, an urban design consultant at 12%, and a traffic consultant at 12% will assist in the process. Other Costs - $18,952 — 100% from City. Other costs include the preparation of land, boundary and bathymetric surveys for water depth information required for the inventory and analysis phase of the master plan study. The preparation of surveys and gathering of information necessary for the master plan study will be performed by private land surveyors for the City. DEP Agreement No. C2603, Attachment A, Page 5 of 6 DEP 55-236 (06/04)