Loading...
HomeMy WebLinkAboutProject Budget NarrativeProject Budget Narrative: Describe line items for each applicable budget category shown on the budget schedule. Provide sufficient detail to show cost relationship to project activities. Complete for both FCMP and match items, if applicable. If in -kind match is being provided by a third party, a letter from that party confirming the amount and type of that match must be included with this project work plan. Note: Indirect costs are not allowed as match. FCMP Funds: Contractual: $50,000 FCMP funds will be used towards the full cost of the environmental consultant and towards partial costs of the landscape architecture/planning firm which equals the requested $50,000. Match Funds: Salary: $9,200 — 100% from City (local cost share) — This represents a contribution by the applicant of 10% of the Project Manager's time. The Project Manager, a Registered Landscape Architect, will provide overall direction for the Project. The salary figure of $92,000 is based on his current salary as an Acting Planner III. Fringe Benefits: $4,302 — 100% from City — The City's fringe rate for civilian personnel in the Project Manager's pay class is 46% of salary. Supplies: 56,000 — Supplies include the following: 1) Photographic and architectural related supplies including but not limited to foam core boards and laminating for mounting presentations and renderings of project concepts and components. 2) Reproduction of final products, reports, drawings, and project deliverables. 3) Software towards needed for the creation and maintenance of project website. 4) Courier services and express mailings. 5) General Office Supplies Contractual Services: $11,546—from City. Various city staff along with a Project Manager, an experienced Planner, at 10% of the project costs, will coordinate the drafting of the scope of work and assure that the project timelines are adhered to, and that reports are completed. The remaining funds will be used for the master planning process. A group of consultants has been selected through the RFQ process. A landscape architecture/planning firm at 42% will create and lead the process outlined in the project description. In addition, an economic consultant at 14%, an environmental consultant at 10%, an urban design consultant at 12%, and a traffic consultant at 12% will assist in the process. Other Costs - S18,952 — 100% from City. Other costs include the preparation of land, boundary and bathymetric surveys for water depth information required for the inventory and analysis phase of the master plan study. The preparation of surveys and gathering of information necessary for the master plan study will be performed by private land surveyors for the City. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL BACKUP. ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT