Loading...
HomeMy WebLinkAboutExhibit 2EXHIBIT B SEREA 2007 PROJECT District .1 • In the area generally bounded by N.W.,27th Ave, N.W. 23rd St., N.W. 20th Ave., and N.W. North River Dr., including the area, bounded by N.W. 30th Pl., N.W. 14th St., N.W. 22nd Ave., and N.W. 7th St. and any additional streets as required -- project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by N.1W. 23rd Ave, N.W. 31st St., N.W. 24th Ave, and N.W. 35th St.; N.W. 34'th Ave. from 14th too 17th St. N.W. 18th Terr. from 31st to 32nd St, N.W. 43rd Ave., N.W. 43rd Ct., N.W. 431 Pl. from N.W. 5th.to NW 7th St. and any additional streets as required — project components include: the design and construction of right-of- way enhancements including resurfacing of asphalt pavement, swale restoration, sidewalk repairs, landscaping, striping, and drainage as needed. • In the area generally bounded by N.W. 27th Ave., N.W. 38th St., N.W. 22nd Ave., and N.W. 28th St., including an area bounded by N.W. 18th Ave.. N.W. 20th St., N.W. 14th Ave., and N.W. North River Dr: and any additional streets as required - project components include:. the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signagd, and striping. • In the area generally bounded by N.W. 20th St., N.W. 7th Ave., SR 836, and N.W. 17th Ave. — project components include: the design and construction of roadway resurfacing, sidewalk replacement, ADA ramps, curbs, gutters, drainage improvements, and landscaping. • In the area generally bounded by N.W. 22nd Ave., N.W. 38th St., N.W. 17th Ave., and N.W. 28th St., including an area bounded by N.W. 22hd Ave, N.W. 20th St., N.W. 17th Ave. and N.W. North River Dr. Additional streets as required — project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. M [AM1/4147251.7 13-1 District 2 11 • In the area generally bounded by N.W. lst Ave., N.E. 20th St., Biscayne Bay, Miami River — project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area east of Biscayne Blvd. on N.E. 83'1 Rd., 85th St., and 86th St. - prof eet components include: the design and construction of roadway to include milling and resurfacing, swale restorations, new sidewalks, landscaping and roadway stripping. • In an area generally bounded by N.E. 6th Ct., N.E. 8th Ave., N.E. 76th St., N.E. 10th Ave., Litter River and N.E. 72'd Terr. — project components include: the construction of roadway improvements, including construction of `stain' drainage, storm water pump station, water quality structure, roadway milling and resurfacing, sidewalk replacement, construction of curbs, gutters, ADA ramps, and swale restoration. • In the area generally bounded by N.E. 69th St., N.E. 72"d St., Biscayne Blvd. and Biscayne Way — project components include: the construction of roadway improvements, including construction of storm drainage, storm water pump station, water quality structure, roadway milling and resurfacing, sidewalkreplacement, construction of curbs, gutters, ADA ramps, and swale restoration. • In the area generally bounded by N.W. 2"d Ave., N.W. — N.E. 34th St., N.E. 39th St., and Biscayne Bay, including any additional streets as required - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by N.W. 2"d Ave., N.W. —N.E. 34th St., N.W. —N.E. 24tn St., and Biscayne Bay, including any additional streets as required — project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 39th Ave., S.W. 26th St, S.W. 27th Ave., and S. Dixie Hwy., including any additional streets as required - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping.] • In the area known as Marcos Island — project components include: drainage improvements. MI AM1/4197251.7 B-2 District 3 • In the area enerally bounded by 4.W. 22nd Ave., SR 836, the Miami River, W. Flagler St., S.W. 12tAve., and N.W. 7th St., including any additional streets as required - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by N.W. -- S.W. 27th Ave., N.W. 7th St., S.W. 12th Ave., S.W. 8th St., including any additional streets as required — project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk ` replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 27th Ave., S.W. 8th St., S.W. 22nd Ave., and S.W. 9th St., including any additional sheets as required — project components include:. the. design and construction of roadway resurfacing, swale restoration, :curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 17th Ave.. SW 18th St., S.W. 12th Ave., and S. Dixie Hwy., including any additional streets as required — project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 17th Ave., S.W. 8th St., S.W. 12th Ave., and S.W. 18th St.. including any additional streets as required — project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 17th Ave., W. Flagler St., S.W. 1st Ct., S.W. 1st Ave., 1-95, and S.W. 8th St., including any additional streets as required — project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area of known as Shenandoah/Roads including any additional adjacent areas as required — project components include; drainage remediation. MIAMI/4197251.7 B-3 District 4 I• In the area generally bounded by S.W. 16th St., S.W. 27th Ave., S.W. 2211d St., and S.W. 32"d Ave. - project components include: the design and construction of a positive storm sewer system, road improvements such as damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant ramp construction, re -sod of swales, milling and resurfacing. • In the area generally bounded by S.W. 37th Ave., S.W. 16th St., S.W. 24th Ave., and S.W. 22" d St., including any additional streets as required --- project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 27th Ave., S.W. 22nd St., S.W. 17th Ave. and S. Dixie Hwy., including any additional streets as required - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 47th Ave., S.W 57th Ave., W. Flagler St., and S.W. 8th St. — project components include: the construction of a storm sewer system, road improvements, such as damaged sidewalk replacement, damaged curb and / or gutter replacement, ADA compliant ramp construction, re -sod of swales, milling and resurfacing. In the area known as Shenandoah various intersections — project components include: the construction of traffic circles, including related drainage improvements, curbs, gutters, milling and resurfacing, landscaping, and pavement markings. • In the area known as Flagami various intersections — project components include: the construction of traffic circles, including related drainage improvements, curbs, gutters, milling and resurfacing, landscaping, and pavement markings. • In the area know as Shenandoah/Flagami — project components include: drainage remediation. District 5 • In the area generally bounded by N.W. 17th Ave. and N.W. 19th Ave., from N.W. 45th St. to N.W. 57th St., including N.W. 18th Ave. from N.W. 43`d St. to N.W. 57th St., but not including N.W. 46th St. and N.W. 54th St. — project components include: the construction of roadway improvement, including milling and resurfacing, sidewalk repairs, upgrading swale areas to provide parking, turf block, curbs, gutters, storm drainage improvements, pavement markings. M1AM1I419725 1.7 B-4 • In the area generally bounded by N. 2"d Ave,.N.W. 40t St., N. Miami 46th St. - project components include: the construction of roadway including milling and resurfacing, sidewalk repairs, street widening, pavement marking, landscaping, and storni drainage as needed. • N.E. 38th St. from N. Miami Ave.' to N.E. 2"d Ave. — project components include: the construction of roadway improvments, including reconfiguring existing roadway section, milling and resurfacing; landscaping, lighting, andassociated. drainage improvements. • In the area generally bounded by N.E. 2nd Ave., N.E. 72"d' St., Florida East Coast Rail line, and N.E. 62"d St. — project components include: the design and construction of a variety of streetscape related improvements, such as entrance gateways;:' lighting, directional signs, landscaping, milting and resurfacing, and drainage modifications as needed. Ave., and N.W. improvements, curbs;. gutters, • In the area generally bounded by Nj. Miami Ave., N.E. 48th St., N.E. 2nd Ave„ N,E,. 44th St. ---- project components include: the construction of roadway improvements," such as milling and resurfacing, road reconstruction. curbs, sidewalks, medians, storm drainage, and pavement markings. ' . • North River Dr. from N.W. 7th St.+to N.W. 1 1 th Pl. — project components include: the. construction of roadway improvements, such as roadway reconstruction, sidewalks, associated drainage. landscaping, and streetlighting. Multi -District • Citywide — project components include: Miscellaneous sidewalk replacements and construction of ADA improvements) • In the area generally bounded by W. Flagler St., S.W. 8th St., S.W. 67th Ave., and S.W. 62' Ave. - project components include: the construction of a storm sewer system, road improvements, such as damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant ramp construction. re -sod of swales, milling & resurfacing. { • In an area generally bounded by N.W. 7th St., W. Flagler St., N.W. 57th Ave., and N.W. 52"d Ave. — project components include: the construction of a stoitn sewer system, road improvements, such as damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant ramp construction, re -sod of swales, milling & resurfacing. • In the area known as Silver Bluff, which includes various intersections within District 2 and District 4 - project components include: the construction of traffic circles, including related drainage improvements, curbs, gutters, milling & resurfacing, landscaping, and pavement markings. IAMI/4 ] 9725] .7 B-5 • S.W. 32"d Ave. from U.S. 1 to S.W. 22'd St. (also known as Coral Way) — project components include: the construction of roadway improvements, including resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. Or if such project components cannot be constructed as provided above, such other roadway and sidewalk improvements, as may be determined by the City, including but not limited to resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping, in the areas descriEe above or in any other areas as may be determined by the City. MIAMI/419725].7 B-6