PROJECT WORK PLAN
FYOS•06
DEP Agreement a CZ613
Project, Title: Watson Island Baywalk Project
Reclplrnt
Organizarion Name: Ciry of Miami
Chief Elected Official or Agency Head: Manuel A. Diaz
Tide: Executive Mayor
Address: 3500 Pan American Drive
Zip Code: 33133
Arei Code and Telephone Number; (305) 230.5300
Arcs Code and Facsimile Machine Telephone Number: (305) 854.4001
b•Mail Address: MannyDiaz@ci.rniami.fl.us
Project .Ma nreer
•Organization Name: Ciry of Miami
Name: Aldo Bustamenle
Address: 444 SW 2n° A venue, 3i° Floor, Miami, Florida
Zip Code; 33130
Area Code and Telephone Number: (305) 416.1436
Area Code and Facsimile Machine Telephone Number: (305) 416.2156
E•Moil Address: abuSrarnanle a,ci.rniami.(l.us
Partr3Yf
Organization Name: Miami Parking Awho/ iry
Contact Person: Yanci Crespo
Address: 190 N.E. 310Street, Miarni, Florida
Zip Code; 33132
Area Code and Telephone Number: (305) 373.6789 ext. 250
Area.Code and Facsimile Machine Telephone Number: (305) 371.9451
E•Mail Address: vcresoogrniamiparking.com
Mailing Address for Warrant (limber Than (he Recipient address):
County in which project is located: MioRu•Dadc
Protect is Statewide: No
D E P Agreement No. C2.613, A rrarhmenr A, Pate 1 of 5
DEP 55.236 (04/0S)
Scope of Work Information
Abslr>ael Descriplioo: Briefly but completely describe the problem to be addressed end iheprojeet solution to
the problem. Please limit to one page.
Watson Island is a spoil island located in Biscayne Bey, Miami. The laland's Master Development Plan and the Ciry
of Miami's comprehensive plan reserve the majonry of Watson Island for recreational land uses. Towards this goal,
the Ciry proposes to build a Baywalk on the island to increase public use end implement coastal protection goals.
The Baywalk will include an innovative combination ofa funcrionaI retaining wall, which will build-up and level the
upland slope, combined with a sealing airs for visitors along the Baywalk, The Ciry has consulted with permitting
agency siaff and, expects the permining process to be completed prior to onsettof the grant award in July 200. ,1s a
result of the consultation, the Ciry war advised to design the project to be constructed landward of wetlands and the
mein high water line in order to avoid environmental impacts and regulatory concerns. Otherwise, if the .
construction would impact wetlands, it would require an Environments? Resource Permit and mitigation. Also,
construction waterward of the mean high water tine would trigger submerged state lands issues and require a lease
from the Board of Trustees, which would likely be denied.
DEP Asreemenl No. CZ61J, Atrachmrnt A, Page 2 of 5
DEP 55.236 (04/0S)
Proieel Objectives nod Related Tasks and Deliverables: List project objectives) and asks that will
accomplish each objcchvc. Indicate the quart4r in which these tasks will occur and will be delivered. Deliverables
or work products must be listed.
Objective I: Pre construction Activities
Task I; Site Clearance
Task 2: Dcsign
Deliverable: Conceptual Design
Task 3: Preliminary Approvals & Comments
Deliverable: Review CornMenrs
Task 4: Design
Task 5: Regulatory Approvels/Permining
Deliverable: Penruned Construction Drawings
Objective 2; Contractor
Task I: Bid document preparation, connector selLtion
Objective 3: Construction
Task 1: Stan of Construction
Deliverable; Stan of Retaining Wall Construction pictures
Tssk2: Construction
Task 3: Final Inspection/Punch List items
DEP Agreement No. C1.613, Attachrnenr A, Page 3 of S
DEP 55.1J6 (04/05)
it
Proiecl Budeel Schedule: Type dolls; amourjts only in applicibie categories (round to the nearest do►lar no
cents) and leave other categories blank. If your grant Agreement requires match, it must equal the FCMP funds
:queued, or one hundred percent (100%). A budget transfer of funds (within approved budget categories), in an
amount no) to exceed l0 percent of the FCMP rota{ budget, is allowed without requesting an official amendment,
IBred_iet Cate pore FCMP Fundr MATCH Funds
i. Salaries I
7
2. Fringe Benefits
3. Travel
4. Equipment Purchases
S. Supplies
6. Contracrual Services 50.000.90 50.00Q.Q0
7. Construction
Si.Other Expenses
9. Indirect Charges
FCMP Total 50,00Q,00
Match Total 50.000.00
Total Projeci Cost; S 190,000.00
DEP Agreement No. CZ413, Arrachmenr A, Pigt 4 or 5
DEP 55.2)6 (04/05)
•
Project Budjel Narrative: Describe line items for each applicable budget category shown on the budget
schedule. Provide sufficient Waif to show cosi relationship to project activities. Complete for both FCMP and
match items, if applicable. Jf in -kind march is being provided by a third parry, a letter from that parry confirming the
amount and type of that match must be included with this project work plan. More: lndfrect costs are not allowed
as match.
FCMP Fundg will be used for ConrractualServices
S30,000 concrete retaintng_watl, construction & materials
Mitch Funds
The ciry will provide match in the amount of S50,000.00 also in contractual services for Earthwork & Site
Preparation, Bsywalk paving, site drainage, archrrecrure and engineering cervices.
DEP Agreement No. C1613, Altarhment A, Page 5 of 5
DEP 5S-236(06/04J