Loading...
HomeMy WebLinkAboutSchool Impact Review Analysis**REVISED** SCHOOL IMPACT REVIEW ANALYSIS May 2, 2007 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER THE 115% THRESHOLD CAPACITY. APPLICATION: Max Miami (a/k/a Max Tower - 06-02072zc Prema LLC) (Planning Advisory Board Meeting May 2, 2007) REQUEST: Major Use Special Permit, and Change zoning from "General Commercial" (150 DU/acre) to C-1 "Restricted Commercial" (150 DU/acre) ACRES: +1.07 net acres LOCATION: 1603, 1611, 1615, 1621, 1631 NE Miami Place and 1604, 16& 1630 NE Avenue, Miami MSA/ MULTIPLIER: 4.7 / .27 Multifamily NUMBER OF UNITS: 112 units (28 residential units and 168 hotel rooms x .5 = 84 residential units, for a total of 112 residential units) ESTIMATED STUDENT POPULATION: 30 students ELEMENTARY: 14 MIDDLE: 7 SENIOR HIGH: 9 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Phillis Wheatley Elementary — 1801 NW 1st PI MIDDLE: Jose De Diego Middle — 3100 NW 5ch Avenue SENIOR HIGH: Booker T. Washington Senior — 120 0 NW 6th Avenue All schools are located in Regional Center IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2006: % UTILIZATION UTILIZATION NUMBER OF FISH DESIGN FISH DESIGN FISH DESIGN PORTABLE CAPACITY STUDENT CAPACITY CAPACITY STUDENT PERMANENT AND CUMULATIVE POPULATION PERMANENT PERMANENT STATIONS RELCOATABLE STUDENTS" PhiIlls Wheatley 315 49% 49% Elementary 638 0 0 1,060 329 "` 52 q/0 52 /o Jose De Diego 896 86% 86% Middle 1,043 Q 0 0 2,473 903 * 87 /0 8710 Booker T, 1,535 68% 68% Washington 2,270 0 4,339 High 1,544 * 68% 68% *Student population in crease as a result of the proposed developm ent `*Estimated number of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2006-2010, dated November 2006) Projects in Planning, Design or Construction School Status N/A Proposed Relief Schools School N/A Projected Occupancy Date Funding Year OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $196,470. CAPITAL COSTS: Based on the State's May 2007 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 14 x $18,468 = $258,552 MIDDLE 7 x $19,943 = $139,601 SENIOR HIGH 9 x $25,905 = $233,145 Total Potential Capital Cost $631,298 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per stude nt station does not include land cost.