SCHOOL IMPACT REVIEW ANALYSIS
May 2, 2007
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL
AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE
SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER THE 115%
THRESHOLD CAPACITY.
APPLICATION:
Max Miami
(a/k/a Max Tower - 06-02072zc Prema LLC)
(Planning Advisory Board Meeting May 2, 2007)
REQUEST: Major Use Special Permit, and
Change zoning from "General Commercial" (150 DU/acre) to
C-1 "Restricted Commercial" (150 DU/acre)
ACRES: +1.07 net acres
LOCATION: 1603, 1611, 1615, 1621, 1631 NE Miami Place and 1604, 16& 1630
NE Avenue, Miami
MSA/
MULTIPLIER: 4.7 / .27 Multifamily
NUMBER OF
UNITS: 112 units
(28 residential units and 168 hotel rooms x .5 = 84 residential units, for
a total of 112 residential units)
ESTIMATED STUDENT
POPULATION: 30 students
ELEMENTARY: 14
MIDDLE: 7
SENIOR HIGH: 9
SCHOOLS SERVING AREA OF APPLICATION
ELEMENTARY: Phillis Wheatley Elementary — 1801 NW 1st PI
MIDDLE: Jose De Diego Middle — 3100 NW 5ch Avenue
SENIOR HIGH: Booker T. Washington Senior — 120 0 NW 6th Avenue
All schools are located in Regional Center IV.
*Based on Census 2000 information provided by Miami -Dade County Department of Planning and
Zoning.
The following population and facility capacity data are as reported by the Office of
Information Technology, as of October 2006:
% UTILIZATION
UTILIZATION NUMBER OF FISH DESIGN
FISH DESIGN FISH DESIGN PORTABLE CAPACITY
STUDENT CAPACITY CAPACITY STUDENT PERMANENT AND CUMULATIVE
POPULATION PERMANENT PERMANENT STATIONS RELCOATABLE STUDENTS"
PhiIlls Wheatley 315 49% 49%
Elementary 638 0 0 1,060
329 "` 52 q/0 52 /o
Jose De Diego 896 86% 86%
Middle 1,043 Q 0 0 2,473
903 * 87 /0 8710
Booker T, 1,535 68% 68%
Washington 2,270 0 4,339
High 1,544 * 68% 68%
*Student population in crease as a result of the proposed developm ent
`*Estimated number of students (cumulative) based on zoning/land use log (2001- present) and
assuming all approved developments are built; also assumes none of the prior cumulative
students are figured in current population.
Notes:
1) Figures above reflect the impact of the class size amendment.
2) Pursuant to the Interlocal Agreement, none of the schools meet the review threshold.
PLANNED RELIEF SCHOOLS IN THE AREA
(Information included in proposed 5-Year Capital Plan, 2006-2010, dated November 2006)
Projects in Planning, Design or Construction
School Status
N/A
Proposed Relief Schools
School
N/A
Projected Occupancy Date
Funding Year
OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students
amounts to $6,549 per student. The total annual operating cost for additional students residing
in this development, if approved, would total $196,470.
CAPITAL COSTS: Based on the State's May 2007 student station cost factors*, capital costs
for the estimated additional students to be generated by the proposed development are:
ELEMENTARY 14 x $18,468 = $258,552
MIDDLE 7 x $19,943 = $139,601
SENIOR HIGH 9 x $25,905 = $233,145
Total Potential Capital Cost $631,298
*Based on Information provided by the Florida Department of Education, Office of Educational
Facilities Budgeting. Cost per stude nt station does not include land cost.