HomeMy WebLinkAboutIII. Tab 3. Site Utility Study•
•
234-242 NE 79th STREET
MIAMI, FLORIDA 33138
SITE UTILITY STUDY
STE PROJECT NO.04.2879
APRIL 2005
PREPARED FOR:
BISCAYNE HOUSING GROUP, INC.
THE CARLISLE GROUP
2950 SW 27th AVENUE, SUITE 200
MIAMI, FLORIDA 33133
PREPARED BY:
SUN -TECH ENGINEERING, INC.
1600 WEST OAKLAND PARK BOULEVARD
FORT LAUDERDALE, FLORIDA 33311
954-777-3123 954-777-3114 (fax)
wwwsuntech@sithtecheng.com
•
Villa Patricia Site t-
Biscayne dousing Group
INTRODUCTION
:iiity St
April 2
y
The project site is located at 234-242 NE 79th Street, Miami, Florida 33138
and has a net lot area of 2.44 acres. An elderly residential community is
proposed consisting of two apartment buildings, having a total of 340 units,
and a four level parking garage.
Construction is proposed in two phases. Phase 1 consists of a 13 story
apartment building having 180 units and the parking garage. Phase Il
consists of a 16 story, 160 unit apartment building.
Driveway connections are proposed onto NE 78th Street and NE 79th Street.
NE 79th Street is a state road which will require a driveway connection
peiinit as well as a drainage connection pet mit from the Florida Department
of Transportation.
ll. DRAINAGE SYSTEM
General Runoff Characteristics
The proposed site does not include a lake or an offsite drainage connection
so all stormwater runoff must be collected and stored within seepage
trenches and/or a retention area. The drainage system must be designed to
accommodate the traditional runoff generated from the horizontal surfaces,
and in addition Miami -Dade DERM requires that for high rise buildings, the
proposed drainage system also take into account .runoff from one-third of
the largest vertical building face for the 5 year-24 hour storm event. For the
vertical runoff calculations, the most critical runoff will be generated when
the rain/wind is out of the east/west direction, exposing the broadest
building faces to the rain. Preliminary drainage calculations are shown in
Exhibit A.
Site Coverage Data
Horizontal Areas ARE'A(ac.) PERCENT
Building 0.44 18.0%
Paved (Garage & on grade Parking & Roads) 1.02 41.6%
Sidewalk 0.18 7.5%
Green (Landscaping) 0.80 32.9%
TOTAL 2.44 100° o
Vertical Areas (1/3 of the buildingface)
13 Story Building (1 /3 x 120' x 198') 0.18
16 Story Building (1/3 x 147' x 149') 0.17
Parkin Garage (1/3 x 32' x 1211) 0_03
TOTAL 0.38
TOTAL 1MPERVIOUS AREA (including veriicai areas) 2.02 72®/a
PERVIOUS AREA 0.80 28%
TOTAL RUNOFF AREA 2.82 100%
Page 2 of 5
•
•
Villa Patricia ity Study
iscayue ousing Group April 2005
Permit Criteria
South Florida Water ?Management District (SFWMD)
Per the above site coverage data, this project qualifies for a 'No Notice
General Permit for Activities in Uplands' in accordance with the SFWMD
Permit Information Manual, Volume IV, Section 40E-400.315.
Miami -.Dade County Dept. of Environmental Resources Manage
(DERM)
in accordance with Section D-4 of the Miami -Dade Public Works Manual,
the drainage system must be designed to store the required water quality
treatment volume or the runoff generated from the 5 year-1 hour storm
event, which ever is greater. The minimum parking grade must be above
the 5 year-1 hour storm elevation. These calculations are shown on Exhibit
A.
Note: DERM requests that the drainage systems for the parking levels
below roof, not subject to direct runoff, be kept separate from the site
drainage.
n
Florida De al orient of Transportation (FDOT)
Since this project is adjacent to a state road (NE 79th Street), a drainage
connection permit is required. Critical pei,nit criteria requires all on -site
runoff generated from the 100 year-1 hour stout) event, equaling 5.1 inches,
must be contained on -site without discharging into the FDOT right-of-way.
Minimum Grade Criteria
Parking Lot/Road Grade- Min. of: 5 year-1 hour storm elevation
'h foot below back of sidewalk grade.
Minimum Perimeter Grade- 100 year-1 hour storm elevation
Finished Floor Elevation- Min. of: 100 year-72 hour storm elevation
8" above crown of City Rd.
FEMA Base Flood Elevation(See exhibit B)
Project Discharge
This project does not have any opportunities for an offsite drainage
connection unless a drainage well is permitted. As stated above, the
perimeter grade must be designed to retain the volume of stointwater runoff
generated from the 100 year- 1 hour stoinm event. Under storm events
greater than the 100 year- 1 hour storm event, the surface water elevation
will rise above the perimeter grade and sheet flow offsite into the adjacent
streets. If drainage wells are permitted at this location, the drainage system
can be designed to store the required water quality treatment volume and
then discharge any additional runoff directly into the drainage well.
Page 3 of 5
•
Villa Patricia
Biscayne housing Group
Site Utility Study
April 2005
Drainage Wells
Drainage Wells are regulated by the Department of Environmental
Protection and the main limiting criteria permitting their use is such that the
well casing shall penetrate a zone containing a minimum of 10,000 mg/L
Total Dissolved Solids (TDS). As a rule of thumb, the closer the project
site is to the ocean, bay or saltwater canal, there is a greater probability of
meeting the TDS criteria due to the high level of salinity. Given the
proximity of the project site to the nearest salt-waterbody, according to an
official in the Water Control Section of DER.M and a local well drilling
contractor, there is a good probability that the subject property will qualify
for a drainage well. The only way to know for certain is by having a test
hole drilled and tested.
111. WATER DISTRIBUTION SYSTEM
Miami -Dade Water and Sewer Department owns and operates the public
water mains in this area. The existing water mains adjacent to the project
are as follows: NE 2na Avenue- Ten (10) inch
NE 78`h Street- Two (2) inch
NE 79n1 Street- Six -teen (16) inch.
Pursuant to the "Letter of Water and Sewer Availability" from MD-WASD
dated February 8, 2005, water service and fire service connections shall be
from the ten (10) inch water main on NE 2" a Avenue. A contribution fee
shall be paid to the County, in lieu of upsizing the two (2) inch main to a
twelve (12) inch, the amount of thirty dollars ($30.00) per linear foot of the
owner's property directly abutting NE 78th Street.
The estimated average daily water consumption from this project is 34,407
gallons per day (gpd), as calculated in Exhibit C.
IV. SANITARY SEWER SYSTEM
MD-WASD owns and operates a sixteen (16) inch gravity sewer interceptor
main on NE 79th Street and ten (10) inch gravity sewer mains located on NE
2n"a Avenue and NE 78th Street, adjacent to the project site. Pursuant to the
"Letter of Water and Sewer Availability", connections to any of these mains
are allowed, provided there is adequate depth and no conflicts with existing
infrastructure.
The estimated average daily sewage flow from this project is 34,407gpd, as
calculated in Exhibit C.
Page 4 of 5
•
Villa Patricia
'Biscayne .lousing Group
V SOLID WASTE MANAGEMENT
Site 1rltihty Study
April 2005
On -Site receptacles for refuse and recyclables are proposed within each of
the buildings_ Regular pick-up service shall be provided by either the City
of Miami Solid Waste Department and/or an approved private hauling
company.
Page 5 of 5
SUN -TECH ENGINEERING, INC. DATE: 4128105
1600 W. OAKLAND PARK BLVD_ REV:
FORT L AUDERDALE, FL 33311 BY: `,NCL
EXHIBIT A
PRELIMINARY DRAINAGE CALCULATIONS FOR VILLA PATRC
LAND USE BREAKDOWN
LAND USE AREA
PERCENT
BUILDING 0.44
PARKING & GARAGE 1.02
SIDEWALK 0.18
GREEN 0.80
POND BANK 0,00
POND BOT, 0.00
18.0%
41.6%
7.5%
32.9%
0%
0%
TOTAL
2.44
100%
VERTICAL BUILDING FACES
BUILDING
WIDTH
HEIGHT
1/3 x AREA (AC.)
Phase I (13 story)
Phase II (16 story)
Parking Garage
198
149
121
120
147
32
0.18
0.17
0.03
TOTAL
0.38
•
TOTAL RUNOFF AREAS*
LAND TYPE
AREA
PERCENT
IMPERVIOUS
PERVIOUS
2.02
0.80
72%
28%
TOTAL
2.82
100%
*Includes vertical building faces.
Design Storm Rainfall Amounts
Storm
Frequency
Rainfall fn.)
1 hr
24 hr
72 hr
5 year
100 year
32
5.1
6.50
11.00
N/A
14.95
Soil Storage Calculation
A. Total Pervious Area = 0.80 acres
B. Depth to Water Table = 4.0 feet
C. From SFWMD Permit Information Manual, Vol_ IV, Figure E-1, For
'Developed/Compacted Sandy Soils°, the Cumulative Available Soil Storage is:
Sp = 8.18 inches
D. Site Soil Storage = Sp x (Pervious Area/Total Area)
2.69 inches
E. Curve Number (CN) = 1000/( Soil Storage + 10)
= 78.82
F. Rational Method Coefficient (C) = (.25 x pervious area + .95 x Impervious Area)/ Total Area
= 0.75
Water Quntity_Ca{culations
A. Calculate the Runoff in Inches_
(Rainfall - 0.2 x Soi! Storage)? / (Rainfall + 0,8 x Soil Storage)
05yr-1 hour'
Q5yr-1 day=
Q1OOyr-1hour`
010Oyr-3day=
1.32
4.11
2.87
12.15
inches
inches
inches
inches
B. Calculate the Runoff Volume
V= Q x Total Runoff Area (1 ft / 12
V5yr-1 hour=
V5yr-1 day::
V1OOyr-1 hour=
ViCijyr_3day=
0.31
0.97
0.68
2.86
ac-ft
ac-ft
ac-ft
ac-ft
Water Quality al'
in) RUNOFF VOLUME TO BE
STORED/EXFILTRATED BELOW THE FINISHED
GRADE FOR THE FOLLOWING:
MINIMUM PAVEMENT GRADE
MINIMUM PERIMETER GRADE
MINIMUM FINISHED FLOOR ELEVATION
no ve
A. Compute the first inch of runoff from the entire site.
1 inch x Total Area x (1 ft / 12 in)
0.20 ac-ft
B. Compute 2.5 inches times the percentage of imperviousness.
C.
a.
b.
c.
Site Area (SA), for water quality pervious/impervious calculations only
SA= Total Area - (roof + fake)
2.00 Acres
Impervious Area (IA), for water quality pervious/impervious calculations only
IA= Site Area(SA) Pervious Area
1.2017447 Acres
Percentage of imperviousness for water quality
%imp= (IA / SA) x 100%
59.95 %
d. For 2.5 inches times percentage of imperviousness
2.5 inches x %imp
1.50 inches
e.
Compute volume required for quality detention
inches to be treated x (total - lake) x (1 ft / 12 in)
0.31 ac-ft (CONTROLS)
Since 2.5 inches times the percentage of impervious is greater than the first
inch of runoff over the entire site, the volume to be treated is:
Volume to be treated =
0.31 ac-ft
D. Since this is a commercial project, 0.5 in. dry detention/retention Pre-treatment must be
provided. However, since the project is 100% retention and does not have any wet retention
areas, the dry pre-treatment volume will be provided.
EXHIBIT B
NE 7C , Si
NE cc.r'. ;E
ZONE X
NE 77NP ST
tar EP3TH
67TH ST
APPkOXIMA C. SC Al`t
5-DO 0 500 FEE
NATIONAL FLOOD INSURANCE PROGRAM
FIRM
FLOOD INSURANCE RATE MAP
DADE COUNTY,
FLORIDA
AND INCORPORATED AREAS
PANEL 181 Of 625
(SEE MAP MPEx FOR PANEL,. NOT PR,P,EO)
CONTAINS:
UNiY 0Jt0ER PANEL
oN ine Tvs na
product IrtforrnaPPP
MAP NUMBER
12025COi81 J ,'
TMAI' !?I=VIsr--o
MARCil 2, 991
SUN -TECH ENGINEERING, iNC.
1600 W. OAKLAND PARK BLVD.
FORT LAUDERDALE, FL 33311
DATE 4/28/05
REV.:
BY: VVCL
EXHIBIT C
ESTIMATED FLOW OF WATER & WASTEWATER FOR VILLA PATRICIA
AVERAGE DAILY FLOW
FLOW(gpd) TOTAL
TYPE OF USE PER UNIT FLOW(apd)
340 Residential Apartments(1 bedroom with 750 SF or less) 100 34,000
Retail & Office Space (2,715 S.F.) 0.15 407
AVERAGE DAILY FLOW = 34,407 gpd
- 0.034 mgd
ESTIMATED PEAK FLOW
POPULATION (P) = NO. UNITS x 1.5 PEOPLE/UNIT x 1/1000
= 0.510 (THOUSANDS)
PEAKING FACTOR= (18 + P1r2) / (4 + P1' )
4.0
PEAK FLOW = ADF X PEAKING FACTOR
= 136,589 gpd
0.137 mgd
Notes:
1. gpd = gallons per day
2. mgd = millon gallons per day
3. No industrial wastewater is anticipated to be generated.
•