Loading...
HomeMy WebLinkAboutFunding Breakdown Detail ReportDept. Status/Phase 58-Parks and Recreation City of Miami - Capital Improvement Program Funding Breakdown Detail Report Area Active/Design CIP: Yes Phase Override: No Job No./Name B-30317 Morningside Park Shoreline Stabilization Project Scope: Phase 1- Design and construction of a Lime Rock Rip Rap stabilization system for 334 If of shoreline, no greater than 10 ft. waterward of the mean high water line, at Morningside Park. Work also includes the removal of existing concrete rubble and trash. Phase II - Also include Kayak Launch and Signage, per SFWMD grant for Biscayne Blueway. Location: 750 NE 55 Terr CIP Fund Award Detail Total Project Source No. Cost Category Funding Prior Approp. Approp. 2002 - 2003 Program Category PM District 2-Recreation & Culture 331-Parks and Recreation Parks and Recreation Edgar Mufioz (CIP) 2-Commissioner: Marc Sarnoff Future Funding Estimates 2003 - 2004 2004 - 2005 Invoiced 2005 - 2006 2006 - 2007 2007 - 2008 To -Date 331313 373001 Design $10,300.00 $0 Sub -Total $10,300.00 $0 331419 385200-1 Administration $I2,000.00 $0 Design $57,447.00 $0 1058 Design Construction $182,333.00 $0 Const. Mgmt. $95,220.00 $0 $0 $I0,300 SO SO SO SO S10.300.00 $0 $10,300 $0 SO SO SO S 10,300.00 $0 $12,000 SO SO SO $0 $57,447 S0 SO SO SO $0 $140.333 $95,220 S42,000 SO $0 SO SO SO S0 S12,000.00 $0 S20,318.80 S24,495.19 SO S0.00 SO S0.00 Sub -Total $347,000.00 $0 331419 385200-2 Administration $25,950.00 $0 Construction $332,050.00 $0 331419 888919 $0 $305,000 $42,000 SO S0 $0 $0 SO S0 S25,950 $0 $0 SO $0 $332,050 S0 S56,813.99 S0 SO S0.00 50.00 Sub -Total $358,000.00 SO Construction $285,000.00 $0 $0 $0 $0 SO $358,000 $0 $0 SO $285,000 SO SO So 50.00 50.00 Sub -Total $285,000.00 / $0 $0 $0 $0 5285,000 SO SO $0.00 Total S1,000,300.00 SO SO S315,300 S42,000 S285,000 S358,000 SO S67,113.99 Total Total Prior Approp. Cost Category Funding Approp. 2002 - 2003 Future Funding Estimates 2003 - 2004 2004 - 2005 2005 - 2006 Invoiced 2006 - 2007 2007 - 2008 To -Date Administration Design Construction Const. Mgmt. $37,950.00 $67,747.00 $799,383.00 $95,220.00 $0 $0 $ I2,000 $0 SO S25,950 SO S 12.000.00 $0 $0 $67,747 SO $0 $0 SO 555,1 13.99 $0 $0 $140,333 $42,000 S285,000 $332.050 S0 50.00 $0 $0 $95,220 $0 SO S0 SO 50.00 07/31/07 12:44:36 PM *rpfsfundbreakdowndetail2.frx Page I Dept. Status/Phase 58-Parks and Recreation City of Miami - Capital Improvement Program Funding Breakdown Detail Report Area Active/Design CIP: Yes Phase Override: No Job No./Name B-30317 Morningside Park Shoreline Stabilization Project Scope: Phase I - Design and construction of a Lime Rock Rip Rap stabilization system for 334 If of shoreline, no greater than 10 ft. waterward of the mean high water line, at Morningside Park. Work also includes the removal of existing concrete rubble and trash. Phase II - Also include Kayak Launch and Signage, per SFWMD grant for Biscayne Blueway. Location: 750 NE 55 Terr Schedule Dates Start Finish Program Category PM District 2-Recreation & Culture 331-Parks and Recreation Parks and Recreation Edgar Munoz (CIP) 2-Commissioner: Marc Sarnoff Total S1,000,300.00 SO SO S315,300 S42,000 S285,000 S358,000 SO S67,113.99 Total Total Est. Category Estimates Estimates 2002 - 2003 Prior Estimates Cost Estimat (Cashflows) 2003 - 2004 2004 - 2005 2005 - 2006 Invoiced 2006 - 2007 2007 - 2008 To -Date 09/22/04 12/30/07 09/22/04 04/20/07 07/30/07 12/30/07 07/30/07 12/30/07 Administration Design Construction Const. Mgmt. $37,950.00 $67,747.00 $799,383.00 $95,220.00 $0 $0 $0 $0 $0 $0 $0 $0 $949 $2,117 $0 $0 S 11,385 $25,405 $0 $0 $11,385 $25,405 $0 $0 S1 I,385 $14,820 S399,692 $47,610 52.846 S0 $399,692 S47,610 S 12,000.00 S55,113.99 $0.00 S0.00 Total S1,000,300.00 SO SO S3,066 S36,790 S36,790 S473,507 S450,148 S67,113.99 Over/Under $0.00 Award No./Title 1058 HD Neighborhood Park Improvements & Acquisition Se Funding Award No/Fund Sources/CIP Project Fund Source/Title 373001 385200-1 385200-2 888919 Safe Neighborhood Parks Bond 2002 Homeland Defense Bonds (Series 1) 2002 Homeland Defense Bonds (Series 2) South Florida Water Management District CIP Project/Title 331313 Momingside Park Renovations 331419 Neighborhood Park Improvements 331419 Neighborhood Park Improvements 331419 Neighborhood Park Improvements 07/31/07 12:44:36 PM •rpfsfundbreakdowndetail2.frx Page 2