HomeMy WebLinkAboutConcurrency ReportProposal No 06-24
Date: 6/22/06
CONCURRENCY MANAGEMENT ANALYSIS
CITY OF MIAMI PLANNING DEPARTMENT
IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP
WITHIN A TRANSPORTATION CORRIDOR
AMENDMENT INFORMATION
CONCURRENCY ANALYSIS
Applicant A. Vicky Garcia -Toledo on behalf of Palomo Holdings Inc
Address: 1292 SW 21 Terrace
Boundary Streets: North: n/a East:
South: NE 82nd Terrace West:
Proposed Change: From: Single Family Residential
To: Restricted Commercial
Existing Designation, Maximum Land Use Intensity
Residential 0.5 acres @ 9 DU/acre
Peak Hour Person -Trip Generation, Residential
Other sq.ft. @ FAR
Peak Hour Person -Trip Generation, Other
Proposed Designation, Maximum Land Use Intensity
Residential 0.85 acres @ 150 DU/acre
Peak Hour Person -Trip Generation, Residential
Other sq.ft, @ FAR
Peak Hour Person -Trip Generation, Other
Net Increment With Proposed Change:
Population
Dwelling Units
Peak Hour Person -Trips
Planning District
County Wastewater Collection Zone
Drainage Subcatchment Basin
Solid Waste Collection Route
Transportation Corridor Name
n/a
NE 4th Avenue
RECREATION AND OPEN SPACE
Population Increment, Residents
Space Requirement, acres
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
POTABLE WATER TRANSMISSION
5 DU's Population Increment, Residents
6 Transmission Requirement, gpd
0 sq.ft. Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
128 DU's
64
0 sq.ft.
0
316
123
58
Coral Way
309
T1
38
Coral Way
RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES
Land Use Policy 1.1.1
CIE Policy 1.2.3
NOTES
1. Permit for sanitary sewer connection must be issued by
Metro -Dade Water and Sewer Authority Department (WASA).
Excess capacity, if any, is currently not known
CM_1_IN 03/13/90
SANITARY SEWER TRANSMISSION
Population Increment, Residents
Transmission Requirement, gpd
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
316
0.41
182.80
182.39
OK
316
70,809
>2% above demand
>2% above demand
OK
316
58,480
See Note 1,
See Note 1.
WASA Permit Required
STORM SEWER CAPACITY
Exfiltration System Before Change
Exfiltration System After Change
Concurrency Checkoff
SOLID WASTE COLLECTION
Population Increment, Residents
Solid Waste Generation, tons/year
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
TRAFFIC CIRCULATION
Population Increment, Residents
Peak -Hour Person -Trip Generation
LOS Before Change
LOS After Change
Concurrency Checkoff
On -site
On -site
OK
316
405
800
395
OK
316
58
A
A
OK
ASSUMPTIONS AND COMMENTS
Population increment is assumed to be all new residents. Peak -period trip
generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average
occupancy for private passenger vehicles. Transportation Corridor capacities and
LOS are from Table PT-2(R1), Transportation Corridors report.
Potable water and wastewater transmission capacities are in accordance with
Metro -Dade County stated capacities and are assumed correct. Service
connections to water and sewer mains are assumed to be of adequate size; if not,
new connections are to be installed at owners expense.
Recreation/Open Space acreage requirements are assumed with proposed
change made.