HomeMy WebLinkAboutTab 4 - Economic Impact StudyLTOS POINTE
Economic Impact Analysis
Submitted to:
City of Miami
Prepared For:
B. DEVELOPMENTS
Prepared by:
SHARPTON, BRUNSON & COMPANY, P.A.
One Southeast Third Avenue
Suite 2100
Miami, Florida 33131
(305) 374-1574
. aZifl SHA.RPTON, BRUNSON & COMPANY, P.A.
Certifies Public Accountants & Business Consultants
ALTOS POINTE.
TABLE OF CONTENTS
PAGE(S)
The Project Overview 1
Executive Summary
Introduction
Summary of Benefits
2
3
Objectives And Definitions
Objectives 5
Definition of Economic and Tax Impact 5
Direct and Indirect Effects 5
Measures of Economic Impact 6
Description of Results 7
Discussion Of The Results By Economic Indicators
Irnpact Indicators 8
Results of Indicators 8
Impact of Construction 8
Impact of Ongoing Operations 9
Impact on Local Tax Revenues 9
Analysis by Economic Indicators 9
Employment 9
Wages 10
Output 10
Local Taxes 11
Public Sector Cost 12
Impact Fees 12
Exhibits
Exhibit I: Summary of Economic Impact 13
Exhibit II: Impact and Other Fees 14
Project Overview
Altos Pointe is located on 22nd Avenue between 5th and 6th Streets in the City of
Miami, Florida (the Project). The Project consists of 163 apartment units, 8,610
square feet of retail space, 14,995 square feet of accessory commercial space,
and 212 parking spaces. The total lot area is 42,980 square feet (0,9866 acres)
Excellent area demographics and a booming local economy enhance Altos
Pointe status as one of the future premier multi -family opportunities.
Targeted for completion in 2009, Altos Pointe will set a new standard of
excellence in South Florida apartment living. It is located on one of the last
undeveloped high-rise parcels. 22nd Avenue is considered the premier mixed -
use with potential in the Little Havana corridor.
The Altos Plaza project, consisting of 335 residential units and 90,000 square
feet of commercial space, is under development a few blocks away. The two
projects will be situated in one of the most desirable locations in Miami.
Interstate 95 is less than half a mile to the west, while nearby Interstate 1-195
provides quick access to Miami Beach. The property's proximity to 1-195 and
ease of access to the surrounding transportation network augments its location
and creates a uniquely convenient and desirable address.
L
-1-
Introduction
This document represents an in-depth economic and tax benefits analysis of the
development and operation of a first class condominium building and retail
facilities.
The Project currently contemplated is comprised of the following components:
❑ 163 units of high -quality residential.
❑ 14,995 square feet of accessory commercial space
D 8,610 square feet of retail.
❑ 212 parking spaces.
This analysis encompasses the entire Project and estimates the economic and
tax benefits for both its developmental and operational phases.
-2-
Summary of Benefits
The Project will bring significant
economic benefits to the city of Miami
(the City). This section summarizes
the impact of the project on employ-
ment, public sector revenues and
other economic benefits as a result of
the development.
Employment
Employment considerations include
the direct employment resulting from
the Project. Average developmental
construction phase employment will
be for approximately 120 employees
and the Project management is
expected to employ 7 people for on-
going maintenance and operations of
the facilities.
Wages
To compute the wages associated
with the new employment we started
with budgeted data directly related to
the developmental and operational
phases of the Project, and we
incorporated data from our research
on retail sales. Total direct and
indirect impacts expected from wages
associated with the new development
approximate the following:
One Time $21,768,472
Tax Revenue
The estimate of the public sector
revenues associated with the
development includes taxes and other
revenues generated directly by the
Project. Although public sector costs
are important elements in measuring
fiscal impact, these benefits have not
been quantified in this document.
This analysis only measures the
benefits derived from the develop-
ment. Annual tax revenue expected
to be created totals $915,110.
Output
The estimate of total economic
impact is measured by total output.
This analysis measures the economic
impact of developmental costs and
ongoing, operational expenditures. To
determine the effect of respending
within the City, we utilized a multiplier
to compute total direct and indirect
benefits. Total output expected to be
generated, as a result of the develop-
mental and operational phases of the
Project will approximate the following:
One Time $ 48,938,981
Annual $ 591,948 Annual $ 1,408,085
-3-
Summary Of Benefits
Significant Community Benefits:
➢ Jobs
➢ Wages
➢ Taxes
➢ Economic Activity
Residents' Spending Impacting Local Businesses:
➢ Food
➢ Recreation/Entertainment
➢ Transportation
➢ Retail
The following table and charts summarize the economic impact of the Altos Pointe
development.
CONSTRUCTION ANNUAL
PERIOD IMPACT RECURRING
Economic Activity Stimulated
Output $ 48,938,981 $ 1,408,085
Wages 21,768,472 591,948
Taxes 915,110
$ 70,707,453 $ 2,915,143
Jobs Created 129 7
-4-
Objectives And Definitions
Objectives
The objective of this analysis is to provide
information on the various benefits
created by the Project and to prepare an
estimate of such benefits to the City.
Our analysis is based on an economic
model, which estimates economic and tax
impacts of various projects on a desig-
nated area. The model is specifically
tailored to the City of Miami (the City).
Definition of Economic and Tax Impact
The construction and subsequent oper-
ation of the Project will create important
benefits within the City. These benefits
include new income, new jobs, new tax
revenue and new economic activity
impacting upon every sector of the local
economy. Moreover, through the multi-
plier effect of respending and reinvesting,
indirect economic benefits are added to
the direct benefits brought about by initial
construction expenditures, the expendi-
tures from ongoing operations and new
spending at the retail enterprises.
Direct and Indirect Effects
The total economic impact of public and
private projects and policies on a region
does not end with the impact from the
initial construction expenditures; the
continued benefits to the local economy
must also be considered. Income to firms
furnishing construction materials and
services is subsequently converted into
employee salaries, material purchases,
investment in plant and equipment,
savings, profits, purchases of services,
and a variety of other economic activities.
Income to laborers is subsequently
respent for purchasing of food,
housing, transportation, education,
entertainment, medical and dental
services, clothing, personal services,
and a wide variety of other goods
and services.
Furthermore, income to the govern-
mental unit is respent as salaries,
purchases, and support of a variety
of programs, including education,
transportation, and social services.
In turn, individuals, firms, and
governments furnishing these goods
and services again spend their
income for more purchases,
salaries, investments, and savings.
In this manner, indirect benefits
result each time the initial sum is
respent, and the additional sum
available in the local economy
induces further job creation,
business development and savings.
Quantification of these indirect
benefits has been the object of
considerable economic study.
Because economic relationships are
so complex in our modern society,
no single area or political unit is a
completely self-contained economic
unit. Therefore, purchases from
other areas and political units are
necessary, and goods services are
exported in return.
As purchases are made from other
units, some of the benefits of
economic respending are lost to the
local economy. Ultimately, a smaller
and smaller portion of the initial sum
would remain, until, after several
rounds of respending, an insignifi-
cant sum is left.
-5-
Objectives And. Definitions
The indirect effects can be viewed as
a set of "ripples" in the economy.
Indirect, like direct, resources require
labor, materials, equipment and
services for their production to induce
further job creation and spending of
wages.
The "ripple" of the indirect effect
multiplies the original impact of the
purchase. The common measure of
the magnitude of the "ripple" effect is
called a multiplier. A multiplier
measures the total magnitude of the
impact on each particular economic
indicator as a multiple of the initial,
direct effect. For instance, a multiplier
of "1" would signify no "ripple" effects
as the total impact is 1 times the
initial impact, while a multiplier of "2"
would imply that the total impact is 2
times the direct effect.
The actual magnitude of a multiplier
depends on the likelihood the goods
and services purchased in a region
would be produced in, or provided
from the region.
The model we used to estimate the
total economic impact incorporates a
multiplier developed by utilizing past
consumption and production patterns
in the City.
There will be significant economic
benefit derived from the expenditures
of the residents of the Project on
eating, drinking, grocery, recreation,
retail etc. This report does not include
the economic impact of such expendi-
tu res.
Measures of Economic Impact
Various measures can be used to
indicate the impact of a policy or
project on a region. Specifically, for
this study, they are the increases in
local employment, wages, tax revenue
and output that result. Definitions of
these measures are as follows:
Employment is measured full-time
equivalent jobs.
Wages include wages, salaries, and
proprietor's income only. They may
include non -wage compensation, such
as pensions, insurance, and other
fringe benefits. Wages are assumed to
be expended by households in the
area at which the wage-earner works.
Local taxes include additional reve-
nues from both ad valorem and non ad
valorem assessments.
Direct expenditures include those
sums expended for land acquisition,
site preparation and all hard and soft
costs associated with a project.
Indirect expenditures are those sums
expended within the local economy as
a result of the "ripple" effect described
earlier.
Output describes total economic
activity, and is essentially equivalent to
the sum of direct and indirect expendi-
tures (exclusive of wages and taxes).
-6-
Objectives And Definitions
Description of Results
For the purpose of describing the
total economic benefits of the Project,
the related expenditures and econ-
omic activity stimulated have been
broken into two categories:
➢ Developmental
➢ Annual Recurring
Developmental expenditures include
those expenditures related to the
design and construction phase of the
Project and related amenities.
Annual recurring activities stimulated
are those expenditures incurred in
connection with the ongoing oper-
ation of the Project, and the sales
and expenditures of the retail enter-
prises leasing space at the Project.
-7-
Discussion Of The Results
B.y Economic Indicators
Impact Indicators
We measured the Project's impact on
four commonly used indicators of
economic activity.
Those indicators are:
➢ Jobs
➢ Wages
➢ Total output
➢ Local taxes
Results of Indicators
Exhibit I details the Project's direct and
indirect impact on the above economic
indicators for Miami. A summary of
such impact follows:
DEVELOPMENT OUTPUT
One Time:
Direct
Indirect
Annual:
Operational:
Direct
Indirect
$ 26,042,455
22,896,526
$ 48,938,981
$ 749,300
658,785
The economic indicator most
commonly measured, and publicly
reported on to gauge the economic
impact of a public project is output.
The impact of a project on the
indicator output is often referred to as
the project's economic impact.
Impact of Construction
The site preparation and construction
expenditures, including soft costs and
impact fees are estimated at $37
million. Such activity will create
approximately 129 new full time
equivalent jobs and employ a
maximum of 169 workers during peak
periods. The workers will earn
approximately $12 million in direct
wages.
WAGES TAXES EMPLOYMENT
$ 11,583,904
10,184,568
$ 21,768,472
129
129
$ 315,000 $ 915,110 7
276,948
$ 1,408, 085 $
591,948 $ 915,110 7
-8-
Discussion. Of The Results
By Economic Indicators
Impact of Ongoing Operations
As a result of the on -going operation
and maintenance of the Project,
Miami will gain approximately 7 new,
permanent full-time equivalent jobs.
The wages of the workers who obtain
these positions will provide an impact
of approximately $592 thousand
annually.
The total expenditures for the
Project's operations, will provide a
new, permanent impact of $1.4
million annually to the City's econ-
omy. This impact consists of the
effects of the direct expenditures
from the maintenance, security and
day-to-day operation of the Project,
and the multiplied effects of such
spending thus creating indirect bene-
fits.
Impact on Local Tax Revenues
As a result of the construction and
operation of the Project, various
state, city and city governments and
agencies would gain an estimated
annual tax benefit of $915 thousand.
Analysis by Economic Indicators
Our analysis of the economic and tax
benefits of the Project was done by
each major phase of the Project. We
identified the major phases to be
developmental and operational.
This analysis determines the econ-
omic benefits to the City by identi-
fying such benefits for each of the
phases.
The effects on economic indicators
used to measure benefits (employ-
ment, wages, output and taxes) were
computed for each phase.
Employment
Employment is one of the most
important economic benefits of the
Project. It is one of the most
accessible and direct benefits for the
City's residents and it's residents and
is a primary means by which develop-
mental, operational and maintenance
expenditures generate indirect econ-
omic benefits. A portion of this
employment occurs on -site as a result
of new spending at the retail enter-
prises, and a portion is derived from
on -going operations of the Project.
Further employment is generated off -
site by the expenditures of employees
of the Project and businesses located
in the Project, at area businesses.
As can be seen in Exhibit I, total short-
term (developmental) employment will
average 129 employees over a sixteen
month period and the total on -going
employment will average 7.
The total on -going positions can be
summarized as follows:
• Management
• Security
• Parking
• Maintenance/Facilities
• Retail
-9-
Discussion Of The Results
By Economic Indicators
Wages
The analysis deemed wages are a
direct by-product of employment. As
discussed in the above section, both
on -site and off -site jobs are created.
There were both temporary and
permanent in nature.
To compute the wages associated
with the new employment we started
with budgeted data directly related to
the developmental and operational
phases of the Project.
Employment, such as construction
related employment, was obtained
directly from construction estimates.
These numbers were tested for
reasonableness.
Output
The output generated, as a result of
the development and operations of
the Project, is caused by the follow-
ing type of expenditures:
➢ Development costs expended in
the City (100%)
➢ Annual operational expenditures
of management company
➢ New spending in the locality by
employees of businesses
located in the Project
To incorporate the impact of dollars
being respent and/or reinvested in
the City, a multiplier was applied to
total direct output.
A multiplier of 1.8792 was used to
determine total direct and indirect
output created by the Project. This
multiplier indicates that for every $100
spent in Miami, another $187.92 will
be respent or reinvested in Miami.
This multiplier was obtained from the
Miami -Dade County Planning Depart-
ment.
Direct output from the developmental
phase of the Project is primarily a
result of developer costs. These costs
include land acquisition, site prep-
aration and soft and hard costs
relating to the Project's construction.
To determine the total output we
determined what development costs
were expected to be or had been
spent in Miami.
Total direct output during the
development phase is $26 million.
Total indirect output created by the
direct respending in Miami is $23
million. Thus total Miami output from
the development of the Project is $49
million.
The final component of output results
from the direct operating expenditures
of the Project, and the indirect
benefits created as a result of the
multiplier effect on direct output.
The Developer provided us with an
annual operating budget for the
Project. An overall assumption was
made that all expenditures would be
spent initially in the City.
-10-
Discussion Of The Results
By Economic Indicators
Output (Contd.)
The total operating expenditures
incorporate all estimated expenses of
the ongoing operation of the Project.
The impact of the retail enterprises
was measured separately as an econ-
omic indicator.
To incorporate the potential respen-
ding and reinvesting in Miami, the
multiplier effect was measured. By
applying a multiplier of 1.8792 to the
total direct output from operating
expenditures and the retail enterprises,
we determined total output (direct and
indirect) from on -going operating
expenditures and retail sales.
Local Taxes
A key and significant benefit generated
from the development and operation of
the Project is taxes. Several types of
tax revenue will be generated from this
project including ad valorem taxes.
Specific ad valorem taxes include real
and personal property taxes. Other
taxes include occupational taxes and
community development taxes.
New real property taxes will be as-
sessed on the Project. The assess-
ment is based on a predetermined
mileage rate being applied to the
taxable value of the real property. We
computed real property taxes for the
developmental phase based on the
cost of the development of the Project.
This assessment base is very
conservative since tax on real
property typically is assessed on
appraised values and not actual
cost.
The basis for ongoing taxes is also
overall cost. The mileage rate was
obtained from the City Tax
Collectors office relative to the
Project's location. The projected
annual real property taxes are
approximately $915 thousand.
Total ad valorem taxes assessed by
Miami -Dade County are allocated
based on mileage rates to certain
governmental entities. Listed below
is the allocation of projected tax
revenue.
City Operating
School Operating
County Operating
Debt Service - City
Debt Service - County
South Florida Water
Library Operating
School Debt Service
Florida Inland Navigation
Environmental Projects
Children's Trust
TOTAL
$310,968
285,588
208,500
23,059
10,583
22,168
18,047
15,373
1,430
3,713
15,681
$915,110
Discussion Of The Results
By Economic Indicators
Local Taxes (Contd.)
Although not quantified, the City, through its
receipt of allocated state sales taxes will
receive an additional benefit as a result of the
development and operation of the Project, and
from the retail enterprises.
Public Sector Costs
Impact fees
Very significant factors in measuring the
economic impact on a specific region of a
project are impact and other required develop-
ment fees. A summary of these fees are listed
below:
➢ City of Miami Developmental Impact Fee
➢ City of Miami Developmental Admin Fee
➢ Miami -Dade County Roadway Impact Fee
➢ Miami -Dade County School Impact Fee
➢ Building Permit Fee
➢ Installation Energy Fee
➢ Other Fees
For the purpose of this economic impact
analysis, fees are included as a part of the
direct development cost (output). Impact fees
total approximately $952 thousand and other
fees total approximately $385 thousand. These
fees are shown in detail in Exhibit II.
-12-
Exhibit List
Exhibit I
Exhibit 11
Summary of Economic Impact
Impact and Other Fees
Exhibit - I.
Summary of Economic Impact
OUTPUT WAGES EMPLOYMENT TAXES
DIRECT
DEVELOPMENTAL $ 26,042,455 $ 11,583,904 129
OPERATIONAL 749,300 315,000 7 $ 915,110
TOTAL DIRECT
26,791,755 11,898,904 136 915,110
INDIRECT
DEVELOPMENTAL 22,896,526 10,184,568
OPERATIONAL 658,785 276,948
TOTAL INDIRECT 23,555,311
TOTAL BENEFITS
10,461,516 -
$ 50,347,066 $ 22,360,420 136 $ 915,110
TOTAL DEVELOPMENTAL $ 48,938,981 $ 21,768,472 129
TOTAL OPERATIONAL 1,408,085 591,948 7 $ 915,110
TOTAL BENEFITS $ 50,347,066 $ 22,360,420 136 $ 915,110
-13-
Exhibit - II.
IMPACT AND OTHER FEES:
A. Development Square Footages: Square Footage
1) Total gross building area (with parking)
2) Maximum development area (FAR)
3) Gross parking area
301,997
174,775
113,985
B. Impact Fees: Amount
1) City of Miami Developmental Impact Fee $ 774,695
2) Developmental Impact Administration Fee 23,241
3) Miami -Dade County Roadway Impact Fee 153,757
4) Miami -Dade County School Impact Fee 223,939
Total of all Impact Fees $ 951,693
C. Non -Impact Fees:
1) Miami Dade W.A.S.A. "connection fees" $ 258,009
2) Building Permit Fee 49,852
3) Installation Energy Fee 30,200
4) Major Use Special Permit Application Fee 30,000
5) Miami -Dade County Code Compliance 11,842
6) Radon Gas Fee 1,246
7) Fire Plan Review Fee 2,368
8) Ground Cover Fee 345
9) Land Use/Zoning 430
10) Zoning Review for Building Permit Fee 60
11) Certificate of Occupancy Fee 250
12) Application Fee 35
Total of all Non -Impact Fees $ 384,637
Total of all Fees for Project $ 1,336,330
Source: City of Miami Planning, Building and Zoning Department.
Miami Dade County Impact Fees
- 14 -