HomeMy WebLinkAboutExhibit 1CITY OF MIAMI DEPARTMENT OF CAPITAL IMPROVEMENTS PROFESSIONAL PROGRAM MANAGEMENT SERVICES 2007/2008 ANNUAL WORK PROGRAM PREPARED BY HDR ENGINEERING, INC. June 2007 This, Annual Work Program will represent a comprehensive report of previous accomplishments, goals, strategies, tasks and activities to be undertaken by the Program Manager for Year 3 (8/2007 - 7/2008) as requred by the Professional Services Agreement for the City of Miami Department of Capital Improvement's Professional Program Management Services Contract. Included will be an analysis of projected costs, personnel and other resources required to accomplish the Annual Program for the period noted. Anticipated Primary Services include all elements included in the Scope of Work for the agreement. Further details on the accomplishments for Year 2, and the goals, strategies, etc. for the Primary Services in Year 3 follow below. Anticipated Specialty Services for Year 3 include Program Management Services for the Miami Streetcar project. These Specialty Services were included in Specialty Services - Work Order Number 1 (Streetcar) in the Professional Services Agreement. In addition to the major accomplishments the Annual Work Program also includes an alphabetical project index listing all projects noting current status and phase such as future, active, design or construction. This comprehensive list also indicates current status, i.e; active or future and includes funding allocation. This list represents a significant number of projects managed by the Program Management Team, in conjunction with City of Miami CIP Staff. PRIMARY SERVICES Goals: The Primary Goal is to programmatically manage and functionally assist with the administration of the overall Capital and Transportation Improvement Program for the City of Miami, consisting of all projects in the City's Annual Capital Plana Efficient. preparation and succesful implementation of the Capital Plan is the overall Goal of the Primary Services component of the Contract. Our team members act as an extension of City staff and are motivated and directed to the success of the program. Strategies: Use of all Program Management tools and practices that have been put in place since January of 2004 will be required to continue the rapid pace of development and implementation of the City's Annual Department of Capital Improvements Capital Plan. Tasks/Activities: Specific Tasks to be undertaken in Year 3 under Primary Services include the following: • Full Commitment of the First Series of the Homeland Defense and Neighborhood Improvement Bond Program — Series 1 • Commencement of Series 2 of the Homeland Defense and Neighborhood Improvement Bond Program as soon as approved by the bond holders • Commencement of Special Obligation Bonds, such as Local Option Sales Tax, Transit Half -Cent Surtax and Parking Surcharge. • Assist with new parks and connections to existing parks as a result of the revised impact fee structure associated with development projects. • Assist the City with all projects and initiatives outlined in the approved 2006-2007 Capital Plan • Assist the City in implementing the changes in the current 2006-2007 Capital Plan from the prior 2005-2006 Capital Plan involving 1) increased revenues resulting from the City's revised impact fee structure, 2) .new revenues from the County Building Better Communities general obligation bond program (GOB) dedicated toward City projects, and 3) the allocation of current year revenues for streets projects. • Anticipated reaction to potential issues related to new state-wide legislation affecting property taxes with trickle -down impacts to local and munincipal goverment budgets. SPECIALTY SERVICES --WORK ORDER 1 (STREETCAR) Goals: • Develop a preliminary streetcar, design that can feasibly operate on selected roadway corridors without adversely impacting traffic flow, parking facilities, pedestrian facilities, and business operations; and have limited or no right-of-way impacts. • Obtain required inter -agency agreements to ensure smooth and timely implementation of all streetcar components. • Finalize the State Environmental Impact Report and obtain concurrence from the City, FDOT, and the MPO Governing Board. • Finalize financial plan and obtain concurrence from the City and funding partners. • Select a Design/Build/Finance/Operate & Maintain (DBFOM) contractor that would be responsible for implementing the Miami Streetcar project within the established schedule and budget Strategies: The goals will be accomplished through the following strategies: • Continue the rapid pace of development and implementation of the City's Streetcar program. • Develop an overall- innovative -procurement process and- related RFQ and RFP documentation designed to maximize competition, with a special emphasis on attracting international participation and private equity in the project. • Assume primary responsibility for the drafting and negotiation of transaction documents for the project, which will include both a long-term concession agreement with payments based on fare collection, and a design -build -operate - maintain contract meeting the risk -allocation and private financing objectives of the City. Tasks/Activities: Specific Tasks to be undertaken in Year 3 under Work Order 1 (Streetcar) include the following: • Oversight and Program Management • Obtain approval of the project financial plan • Obtain approval of the State Environmental Impact Report • Conduct agency coordination and obtain corresponding agreements • Perform FEC coordination and obtain agency agreement • Develop procurement (RFQ/RFP) documents • Provide financial and technical assistance during selection of DBFOM contractor • Develop concession agreement • Obtain utility relocation agreements Accomplishments: The following represents significant accomplishments for our team and the City's Capital Improvement Program for Year 2. NW 3rd Avenue Overtown Business Corridor Streetscape — This Southeast Overtown/Park West Community Redevelopment Agency (CRA) project is proposed to help stimulate revitalization of the NW 3rd Avenue business corridor in historic Overtown. The project limit is along NW 3rd Avenue between NW 8th and 14t" Streets and includes cross slope correction by miliing and resurfacing with limited reconstruction of the roadway, drainage, sidewalk widening, decorative street lights, landscape and hardscape installation. The design for this project is estimated to be completed in the third quarter of 2007. The construction timeframe is predicated on.. identification of CRA revenues to fully fund the project, which is now only partially funded by the CRA. N 141" Street Multimedia Entertainment District Streetscape — This project is part of the Omni CRA initiative to create a Multimedia Entertainment district within its limits with consistent and unique streetscapes. The N 14th Street project includes sidewalk reconstruction with coquina shell aggregate pavers, milling and resurfacing with limited reconstruction of the roadway, drainage, decorative street lights and landscape to match the streetscape improvements previously completed around the PAC. The project limits are N 14th Street between NE 2nd Avenue and the EEC tracks and North Miami Avenue between N 15th Street to 1-395. The design for this project is estimated to be completed in the third quarter of 2007. The construction timeframe is predicated on identification of CRA revenues to fully fund the project, which is now only partially funded by the CRA. N Bayshore Drive Traffic Modifications — The project is intended to improve safety and traffic flow along N Bayshore Drive between NE 15th Street and 17th Terrace in the Omni Hotel District, a destination for tourists and residents that is experiencing rapid growth as several major mixed -use development projects are currently under construction or planned in the near future. The project consists of modifications to the existing median to improve accessibility to/from adjacent properties, construction of a traffic circle at NE 17th Terrace to improve the safety and operations of the intersection, construction of a short-term staging area on the east side of N Bayshore Drive for taxis and shuttle buses, and construction of a long term staging area for charter buses along NE 16th St. Design will begin in April 2007 with construction following in early 2008 as each phase is currently fully funded by the CRA. Downtown Storm Sewer Project, Phase 11 — This project will address the existing flooding problem and improve the roadway condition in the area bounded by Biscayne Boulevard, N Bayshore Drive, NE 19th Street and NE 17th Terrace. The project includes a new storm drainage system with three (3) injection wells, roadway reconstruction to raise the profile above high tide elevation, replacement of damaged sidewalks and curbing and ADA compliant ramps. The design, including regulatory agency permits, is expected to be completed May 2007. The construction timeframe is predicated on identification of CRA revenues to fully fund the project, which is now only partially funded by the CRA. Performing Arts Center (PAC) Super Block Streetscape — Construction was completed in advance of the November 2006 PAC opening for milling, resurfacing, coquina shell aggregate pavers, and decorative street lights of streets surrounding the new PAC. This streetscape project is the City's contribution to a significant community cultural asset that will serve as an i educational and cultural resource. These improvements have created a great urban streetscape, enhancing . the pedestrian experience for all PAC patrons and acting as a catalyst for area revitalization and economic development. Building Department Improvements -- In March 2006 renovations began on the 41" floor of the City administration building (Building, Zoning & Public Works) to better secure the various work areas along with providing additional seating capacity for developers and permit expeditors obtaining permits from the City. The renovations consisted of new cubicles, service counters, carpeting, IT and electrical wiring, etc. and are scheduled for completion in May 2007. Virginia Key Landfill Assessment — This project will prepare and implement a contamination assessment plan (CAP) and a site assessment report (SAR) for submittal to the Department of Environrnental Resources (DERM) for the cleanup and contamination remediation of the old Virginia Key landfill site. Upon acceptance of these reports by DERM, the City will begin the actual site remediation setting the framework for the future development of the site as green space and parkland. The vendor was authorized to begin work in March 2007. Grapela-nd--Ash Remediation—In December. 2005 the City began work efforts to remove incinerator ash from the Grapeland Heights Park site. Approximately 90,000 tons of ash material was removed and replaced with 135,000 tons of clean fill. The remediation work was completed in six (6) months at an approximate cost of $9M,. which allowed the construction commencement of the park facilities, including baseball fields and a water park. Fern Isle Remediation — In March 2006 the City began work efforts to encapsulate the Fern Isle park project site based on the presence of lead and arsenic in the soil that exceeded DERM thresholds. This site had previously been used by Public Works and Solid Waste to stockpile materials. The entire site was capped with two (2) feet of clean fill. The work was completed in June 2006, which allowed commencement of the park facilities, including baseball fields and basketball courts. Lummus Police Stables — This project allowed the Police Mounted Unit to relocate back into the City of Miami from their previous temporary location at Tropical Park in western Miami -Dade County. The construction of this project was completed. in December 2006, and the mounted unit is operating from within the City. Police Headquarters Restroom Improvements — in Spring 2006 CIT completed restoration of the first floor men's and women's showers and locker rooms to bring the facilities into compliance with ADA specifications. Construction of the bathrooms on the second through fifth floors is underway and anticipated for completion in Fall 2007. Police Headquarters Walkway / Pedestrian Gate — This project includes adding a remote controlled security gate on the north perimeter wall along with an ADA compliant ramp leading into the rear of the Police Headquarters building. Construction began in January 2007 and is anticipated to be completed by April 2007. Fire Station 4 — The existing fire station roof was completely replaced. Work was completed in early 2007. Fire Station 11 — The existing fire station is to be demolished and a new state-of-the- art two (2) bay fire station will be constructed to better serve the needs of the community. Design plans are near completion, and construction should begin by Summer 2007. Fire Station 13 — Land was acquired at 958, 960 and 990 N.E 79th Street for the new Upper East Side station that will provide additional fire and rescue capabilities - replacing temporary facilities currently serving the northeast section of the city. CIT expects to issue a Design Build contract by Fail 2007 for this new fire station. Fire Station 14 — A new fire station is planned for the Shenandoah area to replace the existing trailer that currently serves the community from Shenandoah Park. Property search is underway to identify and purchase a suitable site for the new fire station. No design can begin until a site has been identified. Wagner Creek/Seybold Canal Dredging — The Wagner Creek dredging project began as 'a- maintenance dredging and bank- stabilization project in 1999. However, in late 2002 it was discovered that the creek sediments contained hazardous chemicals known as dioxin/furans. Since dioxins were discovered, DERM placed stringent permitting requirements on the project resulting in time delays and a change in scope of work leading to significant cost increases. Seybold Canal; the tributary segment between Wagner Creek -and the Miami River was added to the project scope in 2005. Based on limited testing, the same stringent permitting requirements will be necessary for the Seybold Canal dredging. The City's preliminary cost estimate to dredge and stabilize the banks of Wagner Creek and to dredge Seybold Canal is $16.9 million. Selection of a Design Build contractor for the dredging project is underway with contract execution anticipated for Summer 2007. Ademar and Davis Canal Dredging — The intent of this project is to perform maintenance dredging of the canals to improve channel navigability. The design of this project is 90% complete pending permitting by DERM. Construction is anticipated to begin in Winter 2007. Orange Bowl Light Towers — This project included the removal and replacement of the Orange Bowl light towers with state-of-the-art stadium lighting to serve the renovated stadium and bring this facility up to date as a'World renowned venue. This project was completed in 2006 just prior to the September 2006 UM/FSU football. season opener. Manuel Artime Theater — This small community theatre hosts a variety of cultural events at an affordable price for low income residents of the community as well as artists working with grants. Completed improvements include the repairs to the steeple, interior repairs, air conditioning repairs, acoustical and sound equipment installation, and lighting upgrades. ADA upgrades for the restrooms will be completed in Spring 2007. Re -roofing of the entire structure is anticipated to begin in Summer 2007. Dinner Key Dredging — This modern marina's 582 protected slips comfortably accommodate transient, seasonal, and permanent live -aboard guests accommodating vessels up to 175' and offering amenities such as cable TV and telephone, shower/laundry facilities, and pump out service. This project encompasses the engineering and implementation of dredging for the main approach channel at the north end of the marina that will allow for additional slips. This project is in the design phase with construction anticipated for summer of 2007. Black Police Precinct — The City of Miami Black Police Precinct was built in 1950 during the segregation era for the black officers that were employed by the Miami Police Department. It had a courtroom on the second floor where Judge Lawson A. Thomas, the first black judge in the South, presided. At the height of this era, 85 black police officers worked out of the precinct until 1962 when they were integrated with the Main Station at NW 11th Street & 12th Avenue. This project consists of restoration of the historic black police precinct headquarters to its original condition for use as both a museum and a community center. The work includes structural repairs, new mechanical equipment, electrical work and light safety systems. Construction is underway with completion anticipated in 2007. Virginia Key Beach Park — In response to public protests, county officials created a public beach for the black community on Virginia Key, which opened on August 1, 1945. The beach remained segregated through the 1950's, until rights laws opened all the public beaches in the area. Through the next two decades, Virginia Key Beach remained a popular destination for many in the black community. In 1982 the area was transferred from the County to the City of Miami with the stipulation that the area be kept open and maintained as a public park and recreation area. Improvements to the concession and restrooms as well as a new sewer lift station have been completed. Milling and resurfacing of the access roads to the park, reconstruction of the parking lot area, a new drainage system and lighting are anticipated to be completed in Summer 2007. In coordination with the Virginia Key Beach Park Trust, the City is negotiating the design contract for the future Virginia Key Beach Park Museum. Design is anticipated to begin by Summer 2007. Grapeland Park — This project consists of baseball fields, a community center and a new signature water theme park with water slides, a splash park, lazy river, interactive play areas, concessions, restrooms, lockers and parking. Site contamination remediation and design plans are completed. The ball fields, parking areas and vita course are scheduled for completion by April 2007, while the water park is scheduled for completion by early 2008. Construction of the community center building is scheduled to begin late Summer 2007. Little Haiti Park — This project will bring a cultural center, two (2) new soccer fields, a vita course, playground, domino park, picnic areas, open shelters, sports and security lighting, landscaping and irrigation, bleachers and splash park to the area. Little Haiti Park will provide a new first-class full service park to benefit City residents with a full range of recreational activities and cultural programs. The design has been completed and construction is underway with completion anticipated for Summer 2008. Jose Marti Park — This project includes a new 16,000 square foot gymnasium with locker rooms, exercise room, aerobics/dance studio, storage and conference room. These improvements will provide the community with much needed recreational activities. The design has been completed and is fully permitted. Construction is anticipated to begin. March 2007 with completion by March 2008. Fern Isle Park — This project entails the design and construction of two new regulation size baseball/softball fields including backstops and spectator seating, children's play structure, a 3,500 square foot building, with concession, restrooms, and field storage, new open shelters, a vita course, landscaping, a parking lot, sport and security lighting and a host of other amenities to provide additional recreational opportunities to the community. Site contamination reri`iediation and design plans are completed. Construction is underway and expected lo be completed in November 2007. Athalie Range Park Soccer/Football Field— This park project includes the demolition of existing baseball and softball fields and construction of a new soccer/football field along with concession stands, storage, and a 1,000 seat bleacher. The addition of a -soccer-complex at -this park -will fill a main programming need in the overall citywide parks and recreation plan, which is currently lacking soccer facilities. Design and permitting are underway with construction anticipated to begin by Fall 2007. Museum Park- The City of Miami, Miami -Dade County, the Miami Art Museum and the Miami Museum of Science and Planetarium are currently collaborating to design, develop;- construct and operate top-quality waterfront park facilities and museums in Bicentennial Park. The project includes approximately 29 acres of land, with 21 acres devoted to public park space, landscape, park structures, infrastructure, access roads, parking and marine project elements as well as 4 acres for each museum. This prime, publicly owned waterfront site will become a world -class park comparable to parks of similar size and scope that will also incorporate art, science and history elements and programming as envisioned by the master plan recently developed by Cooper Robertson. Selection of a designer for the park is underway. Bicentennial Park Seawall Phases I,. II & III — This three phase project entails the rehabilitation of one of the City's primary waterfront properties that will set the stage for development of Museum Park. The project consists of stabilizing and replacing over 4000 feet of damaged and/or failing seawall with new sheet piling and a concrete cap thereby facilitating a future wide pedestrian bay walk adjacent to the area of Bicentennial Park. Phases I & II are completed and Phase III is under construction anticipated to be completed by Fall 2007. Virginia Key Master Plan — This project's intent is to develop meaningful waterfront and public open space areas, offer policies for the use, development and management of land, and the protection and enhancement of natural resources while providing the necessary infrastructure and traffic flow to serve future development within the Marine Stadium Basin properties on the island. The proposed Virginia Key Master Plan will emphasize the opportunities for mixed -use waterfront development along the Marine Stadium Basin properties, integrate and recommend improvements to the existing Sewage Treatment Plant, integrate and preserve the historic Virginia Key Beach Park, as well as make recommendations for future island wide improvements and protection of remaining public beaches, parks and conservation areas. The master plan efforts have recently begun and should be completed by late 2007. Curtis Park Sports Turf Improvements — As part of this innovative improvement project, the existing turf was replaced with 90,000 square feet of new Field Turf, artificial turf that is used throughout the NFL and two new adjustable goal posts. The field is marked for soccer and football for both high school and college games. The center of the field has the City's Parks and Recreation seal/emblem "Where Magic Happens" in gold, blue and green. The project was made possible through a private/public partnership among the City of Miami, the Miami Dolphins, and the NFL and was completed in February 2007 prior to the Super Bowl game. Kinloch Park Recreation Building Improvements — This project consists of a new 1,200 square foot building addition for offices and a computer room along with kitchen upgrades and ADA accessible restroom`s. Construction is anticipated to be completed in advance of the 2007 park summer programs. Traffic Calming — Studies were performed for various neighborhoods within the City. As a result, a variety of traffic calming devices such as traffic circles, chokers, medians and intersection - improvements were recommended to address speeding and cut through traffic as well as to improve overall quality of life in our residential neighborhoods. Implementation of these improvements is either completed or underway based on the study recommendations. Traffic calming circles or speed -humps--have been completed or will beginconstruction in -the -following neighborhoods: •.. _Roads._ • Coral Gate • Silver Bluff • Coconut Grove • Shorecrest • Shenandoah • Flagami Buena Vista & Buena Vista Heights — These residential street improvement projects encompass the historic areas of Buena Vista and Buena Vista Heights and serve to improve the street infrastructure in these neighborhoods. The project includes milling and resurfacing, partial reconstruction, addition of a median island, storm drainage improvements, pavement markings and limited landscape and lighting. Construction is completed for Buena Vista Heights Phase I and will begin in April 2007 for Buena Vista Phase I. Buena Vista Buena Vista Heights Phase II will begin construction by Fall 2007 once Streets Bond proceeds are available. Design District Street Infrastructure — Street improvements were recommended in the Miami Design District and Little Haiti Creole District Planning Study adopted by the City Commission in 1998. Located between Midtown Miami and the Buena Vista East Historic District, the 20-block Design District includes furniture showrooms and businesses supporting the design trade and is undergoing redevelopment with at least eight residential projects and a mixed -use parking garage. NE 39th & 40rh Street projects between N Miami and NE 2nd Avenues have been completed. NE 38th Street and NE 1st Avenue projects are under design. Brickell Streetscape & Lighting -- This project includes improvements recommended by the Miami Downtown Development Authority and the Miami Downtown Transportation Master Plan adopted by the City Commission in 2003. Improvements include decorative crosswalks, monuments, fountains, and aesthetic lighting between SE 15th & 25th Roads. Construction started in September 2006 and is anticipated for completion by late Summer 2007. Downtown Street infrastructure — This infrastructure project addresses the need to restore long neglected street infrastructure in Downtown Miami. The project includes milling and resurfacing of the existing roads, replacement of sidewalks and curbing; addition of ADA compliant pedestrian ramps, and lining of existing storm sewer pipes. Construction of the street work is completed with the storm drain lining expected to be completed by Summer 2007. South Miami Avenue — This project includes a roundabout at SW 15th Road with utility connections for a future fountain to be installed by a developer and donated to City. Also included between 15th & 25th Roads is milling and resurfacing, replacement of broken curb, gutter and sidewalks, ADA compliant ramps, decorative street lights and a designated bike lane. This project represents collaboration between the City and County. Construction is underway and scheduled for completion by late Summer 2007. Model City InfrastructureIMLK Boulevard — This project included milling and resurfacing, colored concrete sidewalks, ADA compliant ramps, decorative street lights, landscape and hardscape along NW 62nd Street between 1-95 and NW 12th Avenue. Also included was an entryway sign and roadway improvements to NW 6th Avenue between NW 62nd & 64th Streets. This project represents collaboration between the City and County. Construction was completed in March 2007. Miami River Greenway — The Greenway is a comprehensive network of trails, bikeways and walkways adjacent to the Miami River corridor measuring approximately 5.5 miles. The trail system serves to connect people to the river and its amenities, neighborhoods and parks and allow greater public access to these areas. Design has been completed for many of the greenway segment projects. Several segments have been completed while others are in construction or about to begin construction. This project is in collaboration with the Trust for Public Lands and Miami River Commission. Flagler Street Marketplace — The scope of this project included the conversion of Flagler Street from one-way to two-way traffic, milling and resurfacing, streetscape improvements such as decorative sidewalks, trash receptacles, traffic signage and signals, landscaping with up lighting and ADA compliant ramps. The beautification efforts will enhance the aesthetics of the downtown area as well as improve traffic circulation. Construction was completed in late 2006. NW 14th Street — The scope of this project includes milling and resurfacing, new sidewalks, ADA ramps, turf block on the parkway area and drainage improvements. This corridor serves as entryway from Miami International Airport to the Allapattah and Health District areas. The innovative use of turf block was used to improve quality of life by addressing deteriorated swales and maximizing use of limited street funds. NW 26th Avenue was added to the project scope along with various other neighborhood streets. Construction was completed in Fall 2006. Virginia Key Beach Park Sanitary Sewers & Pump Station — This infrastructure project includes the installation of a new sanitary sewer pump station along with a sanitary sewer force main that will provide service to the Virginia Key Beach Park facilities. Construction is completed. FlagamilWest End Pump Stations — This project consists of the design and construction of four storm water pump stations to alleviate flooding in the Flagami/West End area of the City. As these pump stations become operational and street flooding is no longer a major problem, the traffic flow will improve during rain events, ponding will be alleviated, and the residential quality of life will improve throughout the area. Construction is underway and scheduled for completion by late 2007. Fairlawn IIA — This project consists of the design and construction of one storm water pump station and a collection system to address severe flooding in the Fairlawn area of the City. Construction is underway and scheduled for completion by May 2007. Belle Meade Storm Sewer Phase II — This project consists of the design and construction of storm sewer improvements to include a storm water pump station and a collection system. These improvements will significantly reduce the stage and time of standing water brought about by typical storm events to the Belle Meade neighborhood of the City. Additional improvements throughout the Belle Meade streets include milling and resurfacing, sidewalk and curb repair, ADA compliant ramps and limited landscape. Design is underway with construction anticipated to begin in June 2007. Tamiami Storm Sewer Improvements Project — This project consists of the design and construction of drainage improvements to include a variety of storm sewer appurtenances, new connections to existing outfalls and a new connection to a storm water pump station. These improvements will alleviate flooding within the Tamiami area of the City. Design is approximately 90% complete with construction anticipated to --begin-by FaII-2007. Kinloch Storm Sewer Improvements Project — This project consists of the design and construction of storm sewer improvements to include a variety of storm sewer appurtenances, exfiltration trench, new outfalls and new connections to existing outfalls. These improvements will alleviate flooding within the Kinloch area of the City. Design is approximately 50% complete with construction anticipated to begin by late 2007. Fairlawn Storm Sewer Phase III — This project consists of the design and construction of storm sewer improvements to include a variety of storm sewer appurtenances, exfiltration trench, and new connections to existing outfalls. These improvements will alleviate flooding within the Fairlawn area of the City. Design is approximately 40% complete with construction anticipated to begin by early 2008. NE 71 Street Storm Sewer — This project consists of the design and construction of storm sewer improvements to include a storm sewer appurtenances, collection system, drainage wells, and new outfails. These improvements will reduce the stage and time of standing water brought about by typical storm events to the Bayside neighborhood of the City. Additional improvements include milling and resurfacing, sidewalk and curb repair, ADA compliant ramps and curbing and limited landscape for the median area entrance off Biscayne Boulevard. Design is 100% complete with construction expected to begin by May 2007. Avalon Storm Sewer — This project consists of the design and construction of storm sewer improvements to include a variety of storm sewer appurtenances and exfiltration trench. These improvements will alleviate flooding within the Avalon area in the City. Construction is underway and anticipated to be complete by Summer 2007. Personnel and Other Resources: Considering City staff will be working in conjunction with Program Management personnel for the execution of all CIP projects, our original fee proposal for Primary Services dated June 20, 2005 is incorporated by reference with the modifications noted below. The modifications are mainly sub - program manager adjustments and does not effect the overall cost for Primary Services. The fee proposal continues to guide our work efforts as originally established and provides the program schedule for staffing and staffing reductions as the City continues to take larger portions of the program management efforts. This is a significant part of our plan, and assists the City with it's overall goal to provide the best project delivery systems available. In addition, the staff reductions - as part of the original proposal - significantly affect direct and indirect labor costs and effectively help.. reduce overall project costs. However, due to the need to provide quick turn -around for the RFP process for the Streetcar Work Order, the fee reflects an increase in the Specialty Services Work Order amount to provide management of the procurement portion of the project within the Year 3 contract term. Program Manager Core Team Adjustments • Replace Roger Hatton with Leo Villalobos • Replace Tony Sabbag with Mike Tyler Sub - Program Manager Adjustments: • Remove Indigo Service Corporation. • Add PHS Group, Inc. They will assist with construction administration of verticle projects. PHS is MNVBE certified with the -City of Miami- as well as CBE/DBE certified with Miami -Dade County. Compensation: The overall Compensation for Primary Services provided under the Professional Services Agreement for Program Management Services remain as noted in Schedule B-5 — Summary of Total Compensation for Year 3 shown on page B-12 in the Agreement. This includes ail recurring expenses. As noted, due to the need to provide quick turn -around for the RFP process for the Streetcar Work Order, the fee reflects an increase in the amount to provide the management of the procurement portion of the project within the Year 3 contract term. Variable expenses have also been included. According to Article B2.05 — Escalation - from the PSA, we have included a revised. Schedule B-1, showing a three percent (3%) escalation in wage rates for each job classification effective on the anniversary date of the contract.